Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 237338District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.7 M
Dec 2007 – May 2026
Value, last 12 filed months
$70 k
at the published price for each month
Months reported
222
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-01-23189039
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$71
GasProduction962,570 Mcf$4,682,950
Total$4,683,021

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5684, -101.3771. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.56843, -101.37713 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,986 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,986 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-1054045778,986 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 202601,277106.413.05$3,890
Apr 202601,30298.932.87$3,736
Mar 20260089.753.15$0
Feb 202601,08063.503.75$4,050
Jan 202601,41359.138.00$11,301
Dec 202501,72256.664.41$7,600
Nov 202501,92158.593.93$7,543
Oct 202501,90659.383.30$6,299
Sep 202501,97162.743.08$6,065
Aug 202502,08863.933.01$6,295
Jul 202502,19166.743.32$7,264
Jun 202501,95266.483.13$6,107
May 202502,59460.553.23$8,385
Apr 202501,12362.363.54$3,979
Mar 202502,09167.704.27$8,925
Feb 202511,36670.884.34$6,000
Jan 20250074.324.28$0
Dec 2024079068.993.12$2,466
Nov 202401,25269.052.20$2,752
Oct 202401,86071.372.28$4,243
Sep 202401,84969.612.36$4,372
Aug 202401,94775.632.06$4,018
Jul 202401,93479.932.15$4,152
Jun 202401,93178.082.63$5,086
May 202401,99578.812.20$4,386
Apr 202401,90784.451.66$3,164
Mar 202402,04980.301.55$3,166
Feb 202401,87676.091.78$3,346
Jan 202401,94873.023.30$6,424
Dec 202302,01071.262.61$5,248
Nov 202302,01677.892.81$5,660
Oct 202301,72185.443.09$5,313
Sep 202301,92889.042.74$5,273
Aug 202302,02180.522.67$5,402
Jul 202302,04774.852.64$5,408
Jun 202301,90168.962.26$4,293
May 202302,06370.622.23$4,595
Apr 202302,01678.122.24$4,511
Mar 202302,25072.852.39$5,385
Feb 202301,63575.112.47$4,031
Jan 202302,22176.533.39$7,524
Dec 202202,05176.415.73$11,750
Nov 202201,88485.005.65$10,637
Oct 202202,33487.185.86$13,686
Sep 202201,95184.888.16$15,927
Aug 2022083694.529.13$7,630
Jul 202201,973101.587.54$14,881
Jun 202202,105115.097.98$16,792
May 202202,269109.378.43$19,135
Apr 202202,134104.226.84$14,591
Mar 202202,029108.885.08$10,300
Feb 202201,59691.054.86$7,755
Jan 202202,10281.844.54$9,538
Dec 202102,07671.323.90$8,095
Nov 202102,44977.435.24$12,825
Oct 202101,53179.795.71$8,748
Sep 202102,18669.865.35$11,697
Aug 202102,29066.024.22$9,665
Jul 202102,30170.783.98$9,163
Jun 202102,10569.493.38$7,116
May 202101,82563.483.02$5,507
Apr 202102,23860.362.76$6,173
Mar 202102,30861.302.72$6,271
Feb 202102,04157.805.55$11,323
Jan 202102,36550.412.81$6,646
Dec 202002,32444.642.68$6,218
Nov 202002,27838.772.71$6,166
Oct 202002,41036.972.48$5,973
Sep 202002,34337.091.99$4,665
Aug 202002,45339.982.39$5,851
Jul 202002,45438.371.83$4,479
Jun 202002,42934.901.69$4,106
May 202002,54416.921.81$4,617
Apr 202002,18714.751.80$3,946
Mar 202002,43030.341.86$4,511
Feb 202002,40449.881.98$4,762
Jan 202002,58457.252.09$5,413
Dec 201902,60459.012.30$6,001
Nov 201902,51155.302.75$6,907
Oct 201902,65053.472.42$6,409
Sep 201902,68755.052.66$7,140
Aug 201902,34353.112.30$5,399
Jul 201902,79756.272.46$6,881
Jun 201902,86552.782.49$7,137
May 201903,66358.482.74$10,038
Apr 2019026862.632.75$737
Mar 201902,83456.803.06$8,678
Feb 201902,68650.852.79$7,500
Jan 201903,93546.033.23$12,703
Dec 20180046.594.19$0
Nov 201802,20452.934.24$9,339
Oct 201802,59461.443.40$8,815
Sep 201802,53759.543.11$7,885
Aug 201802,65259.403.07$8,133
Jul 201802,61765.142.93$7,673
Jun 201802,59460.183.08$7,982
May 201802,69965.382.90$7,829
Apr 201802,64563.842.90$7,673
Mar 201802,89461.222.79$8,065
Feb 201802,23161.782.77$6,171
Jan 201802,74262.874.01$10,994
Dec 201702,75757.272.92$8,055
Nov 201702,70555.423.12$8,435
Oct 201702,45649.292.98$7,328
Sep 201702,41547.523.09$7,456
Aug 201702,47945.373.00$7,448
Jul 201702,52043.873.09$7,780
Jun 201702,50842.493.09$7,743
May 201702,63945.373.26$8,612
Apr 201702,43347.933.21$7,814
Mar 201702,06246.772.98$6,152
Feb 201702,31750.452.95$6,841
Jan 201702,53149.413.42$8,653
Dec 201602,56548.763.72$9,549
Nov 201602,53442.492.64$6,701
Oct 201602,60846.193.09$8,059
Sep 201602,57241.553.10$7,975
Aug 201602,73541.442.92$7,998
Jul 201602,61941.622.92$7,659
Jun 201602,72945.352.69$7,330
May 201602,84642.521.99$5,667
Apr 201602,74436.561.99$5,463
Mar 201602,87833.011.79$5,163
Feb 201602,71726.472.06$5,607
Jan 201602,97827.352.36$7,041
Dec 201502,99732.362.00$5,998
Nov 201502,89438.792.17$6,272
Oct 201502,96343.552.43$7,190
Sep 201503,39842.992.76$9,373
Aug 201503,58440.162.87$10,295
Jul 201503,35848.152.95$9,890
Jun 201503,73756.152.88$10,773
May 201502,62355.212.96$7,752
Apr 201503,21249.822.71$8,694
Mar 201503,60042.892.93$10,565
Feb 201503,27644.662.98$9,750
Jan 201503,63243.433.10$11,261
Dec 201403,71354.693.59$13,335
Nov 201403,66370.464.25$15,574
Oct 201404,09678.303.90$15,978
Sep 201403,12586.164.05$12,642
Aug 201403,80889.394.04$15,366
Jul 201403,83396.564.18$16,020
Jun 201403,77898.164.74$17,896
May 201403,95194.734.73$18,675
Apr 201403,89895.944.81$18,746
Mar 201404,02095.895.06$20,328
Feb 201403,77197.406.19$23,350
Jan 201404,26690.404.86$20,736
Dec 201303,14391.824.35$13,686
Nov 201304,09988.853.74$15,323
Oct 201304,48097.423.78$16,932
Sep 201304,249104.113.72$15,797
Aug 201304,109104.253.52$14,474
Jul 201304,240102.523.72$15,763
Jun 201303,94694.403.93$15,521
May 201302,87694.834.15$11,933
Apr 2013089693.964.28$3,837
Mar 201301,09693.623.91$4,289
Feb 201302,86191.233.42$9,784
Jan 201304,09591.603.42$14,005
Dec 201204,10486.773.42$14,036
Nov 201204,15286.953.62$15,051
Oct 201204,41889.383.40$15,020
Sep 201204,22994.672.92$12,342
Aug 201204,48092.662.91$13,029
Jul 201204,58085.133.02$13,835
Jun 201204,43079.822.52$11,159
May 201204,65191.612.49$11,573
Apr 201204,278101.652.00$8,542
Mar 201204,692105.052.22$10,426
Feb 201204,554101.102.57$11,705
Jan 201205,02398.092.73$13,733
Dec 201105,20696.873.24$16,866
Nov 201105,16495.723.31$17,099
Oct 201105,37584.983.65$19,611
Sep 201105,30783.623.99$21,153
Aug 201106,40083.404.15$26,556
Jul 201106,61694.144.52$29,886
Jun 201106,74092.904.64$31,273
May 201107,49398.134.40$33,005
Apr 201104,734105.964.33$20,514
Mar 201107,20796.364.06$29,241
Feb 201105,31685.644.18$22,221
Jan 201107,72586.504.59$35,448
Dec 201007,91685.734.35$34,417
Nov 201007,74280.843.80$29,383
Oct 201008,17578.103.51$28,685
Sep 201007,80872.633.98$31,072
Aug 201007,87573.684.42$34,802
Jul 201008,23272.554.74$38,991
Jun 201008,14270.364.91$39,980
May 201008,25871.124.24$34,974
Apr 201007,69381.694.12$31,716
Mar 201008,15478.394.39$35,785
Feb 201007,45473.585.44$40,567
Jan 201008,31574.365.96$49,591
Dec 200909,50271.445.48$52,107
Nov 2009010,19274.593.75$38,235
Oct 2009010,74172.544.11$44,148
Sep 2009010,65265.543.06$32,646
Aug 2009010,97867.423.22$35,333
Jul 2009010,25961.133.46$35,542
Jun 200909,96466.163.90$38,810
May 2009011,12954.743.93$43,690
Apr 2009010,88746.773.59$39,057
Mar 2009011,93442.144.06$48,440
Feb 2009010,51232.814.63$48,702
Jan 2009012,03135.865.37$64,619
Dec 2008012,95737.105.98$77,446
Nov 2008013,37555.496.86$91,757
Oct 2008014,72575.246.92$101,926
Sep 2008011,922101.767.88$93,911
Aug 2008014,625114.228.48$124,064
Jul 2008015,152131.0811.39$172,573
Jun 2008014,170131.3313.03$184,672
May 2008017,091123.1711.57$197,816
Apr 2008017,738110.3110.45$185,448
Mar 2008019,942101.909.66$192,721
Feb 2008020,77892.538.77$182,235
Jan 2008026,46790.388.21$217,181
Dec 2007015,34188.337.30$112,020

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,277 Mcf  × $  3.05 =     $3,890

────────────────────────────────────────────────────
Month total                                   $3,890

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/237338 is the state's own key, not one this site invented.