REED 116

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 237895District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$977 k
Mar 2007 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-10-20181986
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition515 bbl$41,859
GasProduction162,171 Mcf$934,746
Total$976,605

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4290, -100.6722. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42901, -100.67220 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,543 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,543 ft.

Completions filed
Mar 2007
1 of 1 wells

1 well

42-43538300246,543 ftMar 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 2026053106.413.05$161
Apr 202606498.932.87$184
Mar 202606189.753.15$192
Feb 202605363.503.75$199
Jan 202605559.138.00$440
Dec 202505356.664.41$234
Nov 202507358.593.93$287
Oct 202505859.383.30$192
Sep 202506262.743.08$191
Aug 202507763.933.01$232
Jul 202507266.743.32$239
Jun 202507866.483.13$244
May 202508060.553.23$259
Apr 202507862.363.54$276
Mar 202507467.704.27$316
Feb 202507670.884.34$330
Jan 202508074.324.28$342
Dec 20240968.993.12$28
Nov 20240169.052.20$2
Oct 20240171.372.28$2
Sep 20240169.612.36$2
Aug 20240275.632.06$4
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240278.812.20$4
Apr 20240284.451.66$3
Mar 20240280.301.55$3
Feb 20240276.091.78$4
Jan 20240373.023.30$10
Dec 20230471.262.61$10
Nov 20230277.892.81$6
Oct 20230285.443.09$6
Sep 20230189.042.74$3
Aug 20230480.522.67$11
Jul 20230374.852.64$8
Jun 20230268.962.26$5
May 20230270.622.23$4
Apr 20230378.122.24$7
Mar 20230472.852.39$10
Feb 20230475.112.47$10
Jan 20230376.533.39$10
Dec 20220276.415.73$11
Nov 20220585.005.65$28
Oct 20220287.185.86$12
Sep 20220484.888.16$33
Aug 20220394.529.13$27
Jul 202203101.587.54$23
Jun 202202115.097.98$16
May 202204109.378.43$34
Apr 202202104.226.84$14
Mar 202202108.885.08$10
Feb 20220191.054.86$5
Jan 20220381.844.54$14
Dec 20210871.323.90$31
Nov 20210777.435.24$37
Oct 20210679.795.71$34
Sep 202101169.865.35$59
Aug 202101066.024.22$42
Jul 20210570.783.98$20
Jun 20210569.493.38$17
May 20210263.483.02$6
Apr 20210360.362.76$8
Mar 20210461.302.72$11
Feb 20210257.805.55$11
Jan 20210750.412.81$20
Dec 202001044.642.68$27
Nov 20200538.772.71$14
Oct 202001336.972.48$32
Sep 20200737.091.99$14
Aug 202001339.982.39$31
Jul 202001538.371.83$27
Jun 202001334.901.69$22
May 20200216.921.81$4
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200949.881.98$18
Jan 202002057.252.09$42
Dec 201902159.012.30$48
Nov 201902755.302.75$74
Oct 201903953.472.42$94
Sep 201903955.052.66$104
Aug 201904553.112.30$104
Jul 201904656.272.46$113
Jun 201904752.782.49$117
May 201906358.482.74$173
Apr 201905862.632.75$160
Mar 201903356.803.06$101
Feb 201904350.852.79$120
Jan 201903946.033.23$126
Dec 201805546.594.19$230
Nov 201803552.934.24$148
Oct 201805361.443.40$180
Sep 201805159.543.11$159
Aug 2018010359.403.07$316
Jul 2018012065.142.93$352
Jun 2018015760.183.08$483
May 2018021665.382.90$627
Apr 2018137663.842.90$1,155
Mar 2018013361.222.79$371
Feb 2018014061.782.77$387
Jan 2018015762.874.01$629
Dec 2017016357.272.92$476
Nov 2017016855.423.12$524
Oct 2017018549.292.98$552
Sep 2017123047.523.09$758
Aug 2017027745.373.00$832
Jul 2017028343.873.09$874
Jun 2017028142.493.09$868
May 2017129745.373.26$1,015
Apr 2017128047.933.21$947
Mar 2017129446.772.98$924
Feb 2017126550.452.95$833
Jan 2017130449.413.42$1,089
Dec 2016033148.763.72$1,232
Nov 2016133842.492.64$936
Oct 2016135646.193.09$1,146
Sep 2016135641.553.10$1,145
Aug 2016138441.442.92$1,164
Jul 2016139041.622.92$1,182
Jun 2016238045.352.69$1,111
May 2016140142.521.99$841
Apr 2016238636.561.99$842
Mar 2016139833.011.79$747
Feb 2016237526.472.06$827
Jan 2016140327.352.36$980
Dec 2015141432.362.00$861
Nov 2015241938.792.17$986
Oct 2015144443.552.43$1,121
Sep 2015342042.992.76$1,288
Aug 2015144140.162.87$1,307
Jul 2015244248.152.95$1,398
Jun 2015343256.152.88$1,414
May 2015244355.212.96$1,420
Apr 2015344249.822.71$1,346
Mar 2015244242.892.93$1,383
Feb 2015241044.662.98$1,310
Jan 2015246643.433.10$1,532
Dec 2014342354.693.59$1,683
Nov 2014243970.464.25$2,007
Oct 2014344578.303.90$1,971
Sep 2014246286.164.05$2,041
Aug 2014151789.394.04$2,176
Jul 2014258696.564.18$2,642
Jun 2014282898.164.74$4,118
May 2014491494.734.73$4,699
Apr 2014465495.944.81$3,529
Mar 2014253595.895.06$2,897
Feb 2014150997.406.19$3,249
Jan 2014257390.404.86$2,966
Dec 2013357291.824.35$2,766
Nov 2013259388.853.74$2,395
Oct 2013471497.423.78$3,088
Sep 20135695104.113.72$3,104
Aug 20132730104.253.52$2,780
Jul 20134795102.523.72$3,366
Jun 2013581994.403.93$3,693
May 2013290294.834.15$3,932
Apr 2013793993.964.28$4,679
Mar 2013798493.623.91$4,506
Feb 2013594491.233.42$3,685
Jan 201371,05491.603.42$4,246
Dec 2012481786.773.42$3,141
Nov 2012479186.953.62$3,215
Oct 2012280789.383.40$2,922
Sep 2012281294.672.92$2,559
Aug 2012283592.662.91$2,614
Jul 2012485585.133.02$2,923
Jun 2012283979.822.52$2,273
May 2012587191.612.49$2,625
Apr 20123840101.652.00$1,982
Mar 20124977105.052.22$2,591
Feb 20124784101.102.57$2,419
Jan 201241,00398.092.73$3,135
Dec 201141,07296.873.24$3,860
Nov 201141,04395.723.31$3,837
Oct 201161,07184.983.65$4,417
Sep 201141,05183.623.99$4,524
Aug 201141,09783.404.15$4,885
Jul 201141,14094.144.52$5,526
Jun 201141,13892.904.64$5,652
May 201141,17098.134.40$5,546
Apr 201141,148105.964.33$5,398
Mar 201161,23496.364.06$5,585
Feb 201141,09985.644.18$4,936
Jan 201151,06286.504.59$5,306
Dec 2010395685.734.35$4,414
Nov 201041,01680.843.80$4,179
Oct 201061,08278.103.51$4,265
Sep 201041,22572.633.98$5,165
Aug 201041,37573.684.42$6,371
Jul 201041,32072.554.74$6,542
Jun 201021,28370.364.91$6,441
May 201041,40771.124.24$6,243
Apr 201041,47281.694.12$6,395
Mar 201071,40978.394.39$6,732
Feb 201091,30073.585.44$7,737
Jan 201071,75074.365.96$10,958
Dec 200982,02171.445.48$11,654
Nov 200952,41574.593.75$9,433
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 200961,63667.423.22$5,670
Jul 200961,64661.133.46$6,069
Jun 200941,62266.163.90$6,582
May 200941,94554.743.93$7,855
Apr 200931,15446.773.59$4,280
Mar 200941,74842.144.06$7,264
Feb 200971,67732.814.63$7,999
Jan 200991,97235.865.37$10,914
Dec 200892,06137.105.98$12,653
Nov 2008102,20255.496.86$15,661
Oct 200882,44075.246.92$17,492
Sep 200881,743101.767.88$14,544
Aug 200862,515114.228.48$22,020
Jul 2008122,611131.0811.39$31,311
Jun 2008122,750131.3313.03$37,416
May 2008133,006123.1711.57$36,394
Apr 200862,956110.3110.45$31,566
Mar 200873,240101.909.66$32,025
Feb 2008113,47592.538.77$31,496
Jan 200873,62990.388.21$30,411
Dec 2007103,52088.337.30$26,586
Nov 2007143,65291.677.29$27,913
Oct 2007103,93182.856.92$28,039
Sep 2007103,67275.846.24$23,687
Aug 200751,38669.066.39$9,199
Jul 200742,34570.906.39$15,263
Jun 200703,09362.007.55$23,347
May 2007125,66258.747.85$45,131
Apr 200766,48659.617.81$50,982
Mar 200725,92956.927.30$43,407

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   53 Mcf  × $  3.05 =       $161

────────────────────────────────────────────────────
Month total                                     $161

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/237895 is the state's own key, not one this site invented.