MAYER, EDWIN S. JR.

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238067District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$673 k
Oct 2007 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
224
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02181208
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition61 bbl$3,448
GasProduction129,247 Mcf$669,820
Total$673,268

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6558, -100.8074. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.65577, -100.80742 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,877 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,877 ft.

Completions filed
Oct 2007
1 of 1 wells

1 well

42-4353866411047,877 ftOct 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (224)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

224 months

May 20260133106.413.05$405
Apr 2026012798.932.87$364
Mar 2026013389.753.15$419
Feb 2026012463.503.75$465
Jan 2026013459.138.00$1,072
Dec 2025013756.664.41$605
Nov 2025013258.593.93$518
Oct 2025013759.383.30$453
Sep 2025013562.743.08$415
Aug 2025013863.933.01$416
Jul 2025014066.743.32$464
Jun 2025013866.483.13$432
May 2025014560.553.23$469
Apr 2025014162.363.54$500
Mar 2025014067.704.27$598
Feb 2025012870.884.34$556
Jan 2025013974.324.28$595
Dec 2024014468.993.12$449
Nov 2024014169.052.20$310
Oct 2024014771.372.28$335
Sep 2024014469.612.36$340
Aug 2024015175.632.06$312
Jul 2024014779.932.15$316
Jun 2024014778.082.63$387
May 2024014878.812.20$325
Apr 2024014784.451.66$244
Mar 2024014480.301.55$223
Feb 2024014976.091.78$266
Jan 2024015273.023.30$501
Dec 2023014671.262.61$381
Nov 2023014977.892.81$418
Oct 2023014785.443.09$454
Sep 2023015089.042.74$410
Aug 2023015880.522.67$422
Jul 2023015474.852.64$407
Jun 2023015268.962.26$343
May 2023016070.622.23$356
Apr 2023015578.122.24$347
Mar 2023015672.852.39$373
Feb 2023014975.112.47$367
Jan 2023017176.533.39$579
Dec 2022017276.415.73$985
Nov 2022016585.005.65$932
Oct 2022016487.185.86$962
Sep 2022015884.888.16$1,290
Aug 2022017094.529.13$1,552
Jul 20220176101.587.54$1,327
Jun 20220186115.097.98$1,484
May 20220312109.378.43$2,631
Apr 20220135104.226.84$923
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 202203681.844.54$163
Dec 202109871.323.90$382
Nov 2021015877.435.24$827
Oct 2021049079.795.71$2,800
Sep 20210469.865.35$21
Aug 20210166.024.22$4
Jul 20210370.783.98$12
Jun 20210569.493.38$17
May 20213163.483.02$193
Apr 20210260.362.76$6
Mar 20211661.302.72$78
Feb 20211657.805.55$91
Jan 20210950.412.81$25
Dec 202004544.642.68$120
Nov 2020022538.772.71$609
Oct 2020020636.972.48$511
Sep 2020024837.091.99$494
Aug 2020026639.982.39$634
Jul 2020027238.371.83$496
Jun 2020026034.901.69$439
May 2020027916.921.81$506
Apr 2020027414.751.80$494
Mar 2020028430.341.86$527
Feb 2020127049.881.98$585
Jan 2020129457.252.09$673
Dec 2019129259.012.30$732
Nov 2019228355.302.75$889
Oct 2019230453.472.42$842
Sep 2019031455.052.66$834
Aug 2019028953.112.30$666
Jul 2019030056.272.46$738
Jun 2019030252.782.49$752
May 2019031758.482.74$869
Apr 2019130062.632.75$888
Mar 2019131756.803.06$1,027
Feb 2019029450.852.79$821
Jan 2019035146.033.23$1,133
Dec 2018017846.594.19$745
Nov 2018028652.934.24$1,212
Oct 2018030161.443.40$1,023
Sep 2018029759.543.11$923
Aug 2018031259.403.07$957
Jul 2018031965.142.93$935
Jun 2018231260.183.08$1,080
May 2018031865.382.90$922
Apr 2018030463.842.90$882
Mar 2018032161.222.79$895
Feb 2018029161.782.77$805
Jan 2018133162.874.01$1,390
Dec 2017127257.272.92$852
Nov 2017132555.423.12$1,069
Oct 2017026649.292.98$794
Sep 2017132447.523.09$1,048
Aug 2017134345.373.00$1,076
Jul 2017134343.873.09$1,103
Jun 2017034342.493.09$1,059
May 2017135145.373.26$1,191
Apr 2017135547.933.21$1,188
Mar 2017136746.772.98$1,142
Feb 2017133350.452.95$1,034
Jan 2017138449.413.42$1,362
Dec 2016139248.763.72$1,508
Nov 2016235842.492.64$1,032
Oct 2016138146.193.09$1,224
Sep 2016236841.553.10$1,224
Aug 2016137641.442.92$1,141
Jul 2016139241.622.92$1,188
Jun 2016138545.352.69$1,079
May 2016132542.521.99$690
Apr 2016236236.561.99$794
Mar 2016140833.011.79$765
Feb 2016138626.472.06$823
Jan 2016141827.352.36$1,016
Dec 2015242432.362.00$913
Nov 2015039038.792.17$845
Oct 2015241543.552.43$1,094
Sep 2015240042.992.76$1,189
Aug 2015142440.162.87$1,258
Jul 2015144848.152.95$1,368
Jun 2015044456.152.88$1,280
May 2015045355.212.96$1,339
Apr 2015144849.822.71$1,262
Mar 2015043742.892.93$1,282
Feb 2015044944.662.98$1,336
Jan 2015049343.433.10$1,529
Dec 2014051554.693.59$1,850
Nov 2014043470.464.25$1,845
Oct 2014045078.303.90$1,755
Sep 2014047486.164.05$1,918
Aug 2014150589.394.04$2,127
Jul 2014051296.564.18$2,140
Jun 2014048898.164.74$2,312
May 2014052694.734.73$2,486
Apr 2014051795.944.81$2,486
Mar 2014052995.895.06$2,675
Feb 2014048197.406.19$2,978
Jan 2014050190.404.86$2,435
Dec 2013050291.824.35$2,186
Nov 2013049888.853.74$1,862
Oct 2013055697.423.78$2,101
Sep 20130545104.113.72$2,026
Aug 20130567104.253.52$1,997
Jul 20130575102.523.72$2,138
Jun 2013058594.403.93$2,301
May 2013060494.834.15$2,506
Apr 2013056493.964.28$2,415
Mar 2013061893.623.91$2,418
Feb 2013053791.233.42$1,836
Jan 2013059191.603.42$2,021
Dec 2012061086.773.42$2,086
Nov 2012059486.953.62$2,153
Oct 2012060489.383.40$2,053
Sep 2012062994.672.92$1,836
Aug 2012063992.662.91$1,858
Jul 2012063685.133.02$1,921
Jun 2012062779.822.52$1,579
May 2012066791.612.49$1,660
Apr 20120653101.652.00$1,304
Mar 20120694105.052.22$1,542
Feb 20127658101.102.57$2,399
Jan 2012274198.092.73$2,222
Dec 2011073496.873.24$2,378
Nov 2011073895.723.31$2,444
Oct 2011072284.983.65$2,634
Sep 2011074383.623.99$2,961
Aug 2011085183.404.15$3,531
Jul 2011065194.144.52$2,941
Jun 2011078692.904.64$3,647
May 2011081598.134.40$3,590
Apr 20110779105.964.33$3,376
Mar 2011087696.364.06$3,554
Feb 2011077385.644.18$3,231
Jan 2011090186.504.59$4,134
Dec 2010090285.734.35$3,922
Nov 2010067780.843.80$2,569
Oct 2010066778.103.51$2,340
Sep 2010075772.633.98$3,012
Aug 2010084773.684.42$3,743
Jul 2010090772.554.74$4,296
Jun 2010094470.364.91$4,635
May 201001,14471.124.24$4,845
Apr 2010053681.694.12$2,210
Mar 2010064678.394.39$2,835
Feb 2010092073.585.44$5,007
Jan 201001,16174.365.96$6,924
Dec 200901,22271.445.48$6,701
Nov 200901,21474.593.75$4,554
Oct 200901,27172.544.11$5,224
Sep 200901,26765.543.06$3,883
Aug 200901,35467.423.22$4,358
Jul 200901,40061.133.46$4,850
Jun 200901,40166.163.90$5,457
May 200901,49054.743.93$5,849
Apr 200901,46146.773.59$5,241
Mar 200901,56242.144.06$6,340
Feb 200901,46832.814.63$6,801
Jan 200901,61535.865.37$8,674
Dec 200801,72537.105.98$10,311
Nov 200801,76855.496.86$12,129
Oct 200801,89975.246.92$13,145
Sep 200801,877101.767.88$14,785
Aug 200802,301114.228.48$19,519
Jul 200802,600131.0811.39$29,613
Jun 200802,892131.3313.03$37,690
May 200801,816123.1711.57$21,019
Apr 20080890110.3110.45$9,305
Mar 200802,415101.909.66$23,339
Feb 200802,57192.538.77$22,549
Jan 200803,27890.388.21$26,898
Dec 200703,94388.337.30$28,792
Nov 200705,44191.677.29$39,674
Oct 200704,89982.856.92$33,911

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  133 Mcf  × $  3.05 =       $405

────────────────────────────────────────────────────
Month total                                     $405

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/238067 is the state's own key, not one this site invented.