MAYER, EDWIN S., JR. "D" 8

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238111District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$911 k
Aug 2007 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02181206
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition69 bbl$3,678
GasProduction177,454 Mcf$906,898
Total$910,576

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6050, -100.8419. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.60498, -100.84195 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,350 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-43538570118,350 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 20260183106.413.05$557
Apr 2026016898.932.87$482
Mar 2026017889.753.15$561
Feb 2026015563.503.75$581
Jan 2026027759.138.00$2,215
Dec 2025017556.664.41$772
Nov 2025017358.593.93$679
Oct 2025018159.383.30$598
Sep 2025017962.743.08$551
Aug 2025018663.933.01$561
Jul 2025018366.743.32$607
Jun 2025018566.483.13$579
May 2025018560.553.23$598
Apr 2025018262.363.54$645
Mar 2025018667.704.27$794
Feb 2025016970.884.34$734
Jan 2025018974.324.28$809
Dec 2024018568.993.12$577
Nov 2024018769.052.20$411
Oct 2024019571.372.28$445
Sep 2024019169.612.36$452
Aug 2024020075.632.06$413
Jul 2024019979.932.15$427
Jun 2024020178.082.63$529
May 2024020278.812.20$444
Apr 2024020084.451.66$332
Mar 2024020280.301.55$312
Feb 2024018776.091.78$334
Jan 2024019673.023.30$646
Dec 2023020271.262.61$527
Nov 2023019977.892.81$559
Oct 2023018485.443.09$568
Sep 2023020289.042.74$552
Aug 2023021480.522.67$572
Jul 2023021774.852.64$573
Jun 2023021468.962.26$483
May 2023022570.622.23$501
Apr 2023023078.122.24$515
Mar 2023025872.852.39$617
Feb 2023017175.112.47$422
Jan 2023018876.533.39$637
Dec 2022018476.415.73$1,054
Nov 2022013485.005.65$757
Oct 202208587.185.86$498
Sep 2022015584.888.16$1,265
Aug 2022016294.529.13$1,479
Jul 20220187101.587.54$1,410
Jun 20220190115.097.98$1,516
May 20220185109.378.43$1,560
Apr 20220186104.226.84$1,272
Mar 20220186108.885.08$944
Feb 2022019491.054.86$943
Jan 2022022081.844.54$998
Dec 2021014371.323.90$558
Nov 2021023477.435.24$1,225
Oct 2021133779.795.71$2,005
Sep 2021038469.865.35$2,055
Aug 2021035266.024.22$1,486
Jul 2021134670.783.98$1,449
Jun 2021035669.493.38$1,204
May 2021041263.483.02$1,243
Apr 2021043960.362.76$1,211
Mar 2021146461.302.72$1,322
Feb 2021233957.805.55$1,996
Jan 2021040550.412.81$1,138
Dec 2020237644.642.68$1,095
Nov 2020048638.772.71$1,315
Oct 2020170736.972.48$1,789
Sep 2020043037.091.99$856
Aug 2020049039.982.39$1,169
Jul 2020046438.371.83$847
Jun 2020157734.901.69$1,010
May 2020058616.921.81$1,063
Apr 2020044314.751.80$799
Mar 2020037130.341.86$689
Feb 2020034149.881.98$675
Jan 2020036057.252.09$754
Dec 2019025959.012.30$597
Nov 2019024355.302.75$668
Oct 2019026753.472.42$646
Sep 2019031355.052.66$832
Aug 2019031653.112.30$728
Jul 2019033256.272.46$817
Jun 2019023852.782.49$593
May 2019022558.482.74$617
Apr 2019022662.632.75$622
Mar 2019023156.803.06$707
Feb 2019021050.852.79$586
Jan 2019023946.033.23$772
Dec 2018024246.594.19$1,013
Nov 2018024252.934.24$1,025
Oct 2018025161.443.40$853
Sep 2018024459.543.11$758
Aug 2018025659.403.07$785
Jul 2018126065.142.93$827
Jun 2018026460.183.08$812
May 2018126565.382.90$834
Apr 2018226763.842.90$902
Mar 2018429261.222.79$1,059
Feb 2018823861.782.77$1,153
Jan 2018022162.874.01$886
Dec 2017022957.272.92$669
Nov 20171822955.423.12$1,712
Oct 2017023449.292.98$698
Sep 2017022047.523.09$679
Aug 2017122745.373.00$727
Jul 2017023643.873.09$729
Jun 2017124942.493.09$811
May 2017130045.373.26$1,024
Apr 2017131247.933.21$1,050
Mar 2017147746.772.98$1,470
Feb 2017153150.452.95$1,618
Jan 2017158549.413.42$2,049
Dec 2016158848.763.72$2,238
Nov 2016057842.492.64$1,528
Oct 2016160046.193.09$1,900
Sep 2016158841.553.10$1,865
Aug 2016162541.442.92$1,869
Jul 2016063041.622.92$1,842
Jun 2016160145.352.69$1,660
May 2016064442.521.99$1,282
Apr 2016262536.561.99$1,318
Mar 2016164833.011.79$1,196
Feb 2016160626.472.06$1,277
Jan 2016165627.352.36$1,578
Dec 2015164732.362.00$1,327
Nov 2015163638.792.17$1,417
Oct 2015165943.552.43$1,643
Sep 2015168942.992.76$1,944
Aug 2015164940.162.87$1,904
Jul 2015166748.152.95$2,013
Jun 2015064856.152.88$1,868
May 2015066455.212.96$1,962
Apr 2015064849.822.71$1,754
Mar 2015065642.892.93$1,925
Feb 2015161244.662.98$1,866
Jan 2015065543.433.10$2,031
Dec 2014072654.693.59$2,607
Nov 2014070070.464.25$2,976
Oct 2014075578.303.90$2,945
Sep 2014079886.164.05$3,228
Aug 2014074189.394.04$2,990
Jul 2014073296.564.18$3,059
Jun 2014073098.164.74$3,458
May 2014079594.734.73$3,758
Apr 2014028995.944.81$1,390
Mar 2014074295.895.06$3,752
Feb 2014066997.406.19$4,142
Jan 2014073890.404.86$3,587
Dec 2013074591.824.35$3,244
Nov 2013068288.853.74$2,550
Oct 2013077897.423.78$2,940
Sep 20130747104.113.72$2,777
Aug 20130718104.253.52$2,529
Jul 20130737102.523.72$2,740
Jun 2013075494.403.93$2,966
May 2013080494.834.15$3,336
Apr 2013078093.964.28$3,340
Mar 2013081293.623.91$3,177
Feb 2013074391.233.42$2,541
Jan 2013082991.603.42$2,835
Dec 2012083586.773.42$2,856
Nov 2012081886.953.62$2,965
Oct 2012089989.383.40$3,056
Sep 2012080594.672.92$2,349
Aug 2012084492.662.91$2,454
Jul 2012086485.133.02$2,610
Jun 2012084479.822.52$2,126
May 2012087191.612.49$2,167
Apr 20120875101.652.00$1,747
Mar 20120916105.052.22$2,035
Feb 20120799101.102.57$2,054
Jan 2012093098.092.73$2,543
Dec 2011094096.873.24$3,045
Nov 2011097095.723.31$3,212
Oct 201101,02384.983.65$3,732
Sep 201101,02083.623.99$4,066
Aug 201101,07883.404.15$4,473
Jul 201101,09094.144.52$4,924
Jun 201101,05192.904.64$4,877
May 201101,09198.134.40$4,806
Apr 201101,071105.964.33$4,641
Mar 201121,12996.364.06$4,773
Feb 2011097585.644.18$4,075
Jan 201101,15886.504.59$5,314
Dec 201001,16585.734.35$5,065
Nov 201001,15680.843.80$4,387
Oct 201001,22478.103.51$4,295
Sep 201001,20672.633.98$4,799
Aug 201001,27673.684.42$5,639
Jul 201001,32072.554.74$6,252
Jun 201001,31870.364.91$6,472
May 201001,38271.124.24$5,853
Apr 201001,36381.694.12$5,619
Mar 201001,42078.394.39$6,232
Feb 201001,25873.585.44$6,846
Jan 201001,42574.365.96$8,499
Dec 200901,44771.445.48$7,935
Nov 200901,47674.593.75$5,537
Oct 200901,59972.544.11$6,572
Sep 200901,84165.543.06$5,642
Aug 200901,08767.423.22$3,499
Jul 2009097961.133.46$3,392
Jun 200901,35366.163.90$5,270
May 200901,76554.743.93$6,929
Apr 200901,64446.773.59$5,898
Mar 200901,83342.144.06$7,440
Feb 200901,78732.814.63$8,279
Jan 200902,03235.865.37$10,914
Dec 200802,16937.105.98$12,964
Nov 200801,82755.496.86$12,534
Oct 200802,31075.246.92$15,990
Sep 200802,371101.767.88$18,677
Aug 200802,630114.228.48$22,310
Jul 200802,370131.0811.39$26,993
Jun 200802,610131.3313.03$34,015
May 200802,916123.1711.57$33,751
Apr 200802,968110.3110.45$31,030
Mar 200803,225101.909.66$31,167
Feb 200803,27292.538.77$28,697
Jan 200803,72390.388.21$30,550
Dec 200704,07088.337.30$29,719
Nov 200704,40091.677.29$32,083
Oct 200705,33782.856.92$36,943
Sep 200706,43175.846.24$40,156
Aug 200704,94769.066.39$31,601

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  183 Mcf  × $  3.05 =       $557

────────────────────────────────────────────────────
Month total                                     $557

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/238111 is the state's own key, not one this site invented.