MOODY MINERALS "21A"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238115District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$566 k
Feb 2008 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-01-23189018
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition35 bbl$2,252
GasProduction120,615 Mcf$564,150
Total$566,402

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4096, -101.5399. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.40956, -101.53994 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,350 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-1054046297,350 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 20260258106.413.05$786
Apr 2026132998.932.87$1,043
Mar 20260089.753.15$0
Feb 2026224463.503.75$1,042
Jan 2026328459.138.00$2,449
Dec 2025328456.664.41$1,423
Nov 2025327958.593.93$1,271
Oct 2025125359.383.30$896
Sep 2025127862.743.08$918
Aug 2025327863.933.01$1,030
Jul 2025229066.743.32$1,095
Jun 2025229166.483.13$1,043
May 2025329160.553.23$1,122
Apr 2025329562.363.54$1,232
Mar 2025430367.704.27$1,564
Feb 2025428070.884.34$1,499
Jan 20250074.324.28$0
Dec 2024031368.993.12$977
Nov 2024034269.052.20$752
Oct 2024032271.372.28$735
Sep 2024018469.612.36$435
Aug 2024015575.632.06$320
Jul 2024017079.932.15$365
Jun 2024016278.082.63$427
May 2024015378.812.20$336
Apr 2024016884.451.66$279
Mar 2024016180.301.55$249
Feb 2024015476.091.78$275
Jan 2024016173.023.30$531
Dec 2023012571.262.61$326
Nov 2023012777.892.81$357
Oct 2023015285.443.09$469
Sep 2023015489.042.74$421
Aug 2023017480.522.67$465
Jul 2023017774.852.64$468
Jun 2023017868.962.26$402
May 2023016670.622.23$370
Apr 2023019978.122.24$445
Mar 2023022472.852.39$536
Feb 2023020975.112.47$515
Jan 2023026076.533.39$881
Dec 2022029976.415.73$1,713
Nov 2022027385.005.65$1,541
Oct 2022026987.185.86$1,577
Sep 2022031684.888.16$2,580
Aug 2022030794.529.13$2,802
Jul 20220256101.587.54$1,931
Jun 20220292115.097.98$2,329
May 20220314109.378.43$2,648
Apr 20220312104.226.84$2,133
Mar 20220328108.885.08$1,665
Feb 2022030091.054.86$1,458
Jan 2022034781.844.54$1,575
Dec 2021033471.323.90$1,302
Nov 2021042477.435.24$2,220
Oct 2021016179.795.71$920
Sep 2021033469.865.35$1,787
Aug 2021034866.024.22$1,469
Jul 2021033770.783.98$1,342
Jun 2021034369.493.38$1,160
May 2021028763.483.02$866
Apr 2021033760.362.76$930
Mar 2021035461.302.72$962
Feb 2021031257.805.55$1,731
Jan 2021034950.412.81$981
Dec 2020028344.642.68$757
Nov 2020030538.772.71$826
Oct 2020032236.972.48$798
Sep 2020027537.091.99$548
Aug 2020030439.982.39$725
Jul 2020030838.371.83$562
Jun 2020030734.901.69$519
May 2020032416.921.81$588
Apr 2020035914.751.80$648
Mar 2020036630.341.86$679
Feb 2020035149.881.98$695
Jan 2020037857.252.09$792
Dec 2019038259.012.30$880
Nov 2019036755.302.75$1,010
Oct 2019038153.472.42$921
Sep 2019036255.052.66$962
Aug 2019036453.112.30$839
Jul 2019038256.272.46$940
Jun 2019032952.782.49$820
May 2019039858.482.74$1,091
Apr 2019040762.632.75$1,120
Mar 2019039356.803.06$1,203
Feb 2019035650.852.79$994
Jan 2019039646.033.23$1,278
Dec 2018040046.594.19$1,674
Nov 2018037452.934.24$1,585
Oct 2018042461.443.40$1,441
Sep 2018037759.543.11$1,172
Aug 2018036859.403.07$1,128
Jul 2018042765.142.93$1,252
Jun 2018041760.183.08$1,283
May 2018043165.382.90$1,250
Apr 2018043563.842.90$1,262
Mar 2018044761.222.79$1,246
Feb 2018039961.782.77$1,104
Jan 2018044462.874.01$1,780
Dec 2017048657.272.92$1,420
Nov 2017047255.423.12$1,472
Oct 2017042249.292.98$1,259
Sep 2017033747.523.09$1,040
Aug 2017037545.373.00$1,127
Jul 2017045143.873.09$1,392
Jun 2017036842.493.09$1,136
May 2017040945.373.26$1,335
Apr 2017038447.933.21$1,233
Mar 2017039546.772.98$1,179
Feb 2017037850.452.95$1,116
Jan 2017041649.413.42$1,422
Dec 2016041648.763.72$1,549
Nov 2016044542.492.64$1,177
Oct 2016043546.193.09$1,344
Sep 2016042941.553.10$1,330
Aug 2016044541.442.92$1,301
Jul 2016042941.622.92$1,255
Jun 2016044145.352.69$1,184
May 2016042342.521.99$842
Apr 2016040236.561.99$800
Mar 2016040433.011.79$725
Feb 2016042526.472.06$877
Jan 2016047827.352.36$1,130
Dec 2015046732.362.00$935
Nov 2015039438.792.17$854
Oct 2015045843.552.43$1,111
Sep 2015045142.992.76$1,244
Aug 2015045740.162.87$1,313
Jul 2015046848.152.95$1,378
Jun 2015036056.152.88$1,038
May 2015038655.212.96$1,141
Apr 2015036249.822.71$980
Mar 2015034142.892.93$1,001
Feb 2015035644.662.98$1,060
Jan 2015046943.433.10$1,454
Dec 2014046654.693.59$1,674
Nov 2014042570.464.25$1,807
Oct 2014047878.303.90$1,865
Sep 2014046686.164.05$1,885
Aug 2014048889.394.04$1,969
Jul 2014053196.564.18$2,219
Jun 2014052598.164.74$2,487
May 2014054094.734.73$2,552
Apr 2014054895.944.81$2,635
Mar 2014053895.895.06$2,721
Feb 2014054297.406.19$3,356
Jan 2014061090.404.86$2,965
Dec 2013057591.824.35$2,504
Nov 2013055788.853.74$2,082
Oct 2013057797.423.78$2,181
Sep 20130541104.113.72$2,011
Aug 20130534104.253.52$1,881
Jul 20130543102.523.72$2,019
Jun 2013056994.403.93$2,238
May 2013060394.834.15$2,502
Apr 2013061493.964.28$2,630
Mar 2013053393.623.91$2,086
Feb 2013055091.233.42$1,881
Jan 2013062291.603.42$2,127
Dec 2012061486.773.42$2,100
Nov 2012060786.953.62$2,200
Oct 2012060489.383.40$2,053
Sep 2012061094.672.92$1,780
Aug 2012059392.662.91$1,725
Jul 2012056485.133.02$1,704
Jun 2012056679.822.52$1,426
May 2012059691.612.49$1,483
Apr 20120606101.652.00$1,210
Mar 20120665105.052.22$1,478
Feb 20120746101.102.57$1,917
Jan 2012079898.092.73$2,182
Dec 2011081096.873.24$2,624
Nov 2011080095.723.31$2,649
Oct 2011084184.983.65$3,068
Sep 2011081683.623.99$3,252
Aug 2011084783.404.15$3,514
Jul 2011085494.144.52$3,858
Jun 2011085792.904.64$3,976
May 2011091098.134.40$4,008
Apr 20110835105.964.33$3,618
Mar 2011092896.364.06$3,765
Feb 2011087885.644.18$3,670
Jan 201101,04186.504.59$4,777
Dec 2010083385.734.35$3,622
Nov 2010076480.843.80$2,900
Oct 2010087778.103.51$3,077
Sep 2010089972.633.98$3,578
Aug 2010083173.684.42$3,672
Jul 2010086972.554.74$4,116
Jun 2010083270.364.91$4,085
May 2010090371.124.24$3,824
Apr 2010078481.694.12$3,232
Mar 2010092278.394.39$4,046
Feb 2010084373.585.44$4,588
Jan 2010097974.365.96$5,839
Dec 200901,05571.445.48$5,785
Nov 2009093774.593.75$3,515
Oct 2009068672.544.11$2,820
Sep 200901,02065.543.06$3,126
Aug 2009099767.423.22$3,209
Jul 200901,21761.133.46$4,216
Jun 200901,20166.163.90$4,678
May 200901,28154.743.93$5,029
Apr 200901,26946.773.59$4,553
Mar 200901,36042.144.06$5,520
Feb 200901,25732.814.63$5,824
Jan 200901,41635.865.37$7,605
Dec 200801,51337.105.98$9,043
Nov 200801,57555.496.86$10,805
Oct 200801,58675.246.92$10,978
Sep 200801,350101.767.88$10,634
Aug 200801,785114.228.48$15,142
Jul 200801,907131.0811.39$21,720
Jun 200801,953131.3313.03$25,453
May 200802,227123.1711.57$25,776
Apr 200802,459110.3110.45$25,709
Mar 200803,059101.909.66$29,562
Feb 200801,47292.538.77$12,910

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  258 Mcf  × $  3.05 =       $786

────────────────────────────────────────────────────
Month total                                     $786

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/238115 is the state's own key, not one this site invented.