SHURLEY 36

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238587District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$707 k
Nov 2007 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
223
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-24182592
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition544 bbl$43,995
GasProduction125,223 Mcf$663,292
Total$707,287

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4446, -100.7121. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.44465, -100.71209 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,943 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,943 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-43538723156,943 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 202600106.413.05$0
Apr 202602698.932.87$75
Mar 202607289.753.15$227
Feb 202606663.503.75$248
Jan 202608659.138.00$688
Dec 202507856.664.41$344
Nov 202506358.593.93$247
Oct 202506159.383.30$202
Sep 202506362.743.08$194
Aug 202507763.933.01$232
Jul 2025014366.743.32$474
Jun 2025012966.483.13$404
May 2025015060.553.23$485
Apr 2025015262.363.54$539
Mar 2025017367.704.27$738
Feb 2025015570.884.34$673
Jan 2025017674.324.28$753
Dec 2024013368.993.12$415
Nov 2024012769.052.20$279
Oct 2024011471.372.28$260
Sep 2024010269.612.36$241
Aug 202409375.632.06$192
Jul 202408979.932.15$191
Jun 202407878.082.63$205
May 202407678.812.20$167
Apr 202407784.451.66$128
Mar 202408280.301.55$127
Feb 202409176.091.78$162
Jan 2024014073.023.30$462
Dec 2023013871.262.61$360
Nov 2023013177.892.81$368
Oct 2023012985.443.09$398
Sep 202308089.042.74$219
Aug 202307480.522.67$198
Jul 202307674.852.64$201
Jun 202308668.962.26$194
May 2023010270.622.23$227
Apr 202309378.122.24$208
Mar 2023010472.852.39$249
Feb 2023012875.112.47$316
Jan 2023011276.533.39$379
Dec 2022010676.415.73$607
Nov 2022010985.005.65$615
Oct 202208287.185.86$481
Sep 202207784.888.16$629
Aug 202207594.529.13$685
Jul 2022072101.587.54$543
Jun 2022058115.097.98$463
May 2022067109.378.43$565
Apr 2022079104.226.84$540
Mar 2022081108.885.08$411
Feb 2022011791.054.86$568
Jan 2022014381.844.54$649
Dec 2021012471.323.90$483
Nov 2021015177.435.24$791
Oct 2021016979.795.71$966
Sep 2021017169.865.35$915
Aug 2021017166.024.22$722
Jul 2021018170.783.98$721
Jun 2021017769.493.38$598
May 2021018063.483.02$543
Apr 2021024160.362.76$665
Mar 2021010861.302.72$293
Feb 202106457.805.55$355
Jan 202108750.412.81$244
Dec 202009744.642.68$260
Nov 202009738.772.71$263
Oct 202007636.972.48$188
Sep 20200037.091.99$0
Aug 20200639.982.39$14
Jul 202003238.371.83$58
Jun 2020023334.901.69$394
May 2020025416.921.81$461
Apr 2020024714.751.80$446
Mar 2020020230.341.86$375
Feb 2020021049.881.98$416
Jan 2020023457.252.09$490
Dec 2019022259.012.30$512
Nov 2019021955.302.75$602
Oct 2019023853.472.42$576
Sep 2019025955.052.66$688
Aug 2019026653.112.30$613
Jul 2019027756.272.46$681
Jun 2019027552.782.49$685
May 2019027658.482.74$756
Apr 2019027762.632.75$762
Mar 2019028256.803.06$864
Feb 2019023050.852.79$642
Jan 2019028646.033.23$923
Dec 2018024046.594.19$1,005
Nov 2018021252.934.24$898
Oct 2018025061.443.40$850
Sep 2018026659.543.11$827
Aug 2018029359.403.07$899
Jul 2018028965.142.93$847
Jun 2018028260.183.08$868
May 2018027465.382.90$795
Apr 2018026563.842.90$769
Mar 2018025961.222.79$722
Feb 2018017161.782.77$473
Jan 2018026362.874.01$1,054
Dec 2017128957.272.92$902
Nov 2017232355.423.12$1,118
Oct 2017533949.292.98$1,258
Sep 2017034647.523.09$1,068
Aug 2017035945.373.00$1,079
Jul 2017034343.873.09$1,059
Jun 2017036242.493.09$1,118
May 2017036845.373.26$1,201
Apr 2017034147.933.21$1,095
Mar 2017038746.772.98$1,155
Feb 2017036550.452.95$1,078
Jan 2017039849.413.42$1,361
Dec 2016039748.763.72$1,478
Nov 2016040442.492.64$1,068
Oct 2016039046.193.09$1,205
Sep 2016038941.553.10$1,206
Aug 2016139941.442.92$1,208
Jul 2016041341.622.92$1,208
Jun 2016140745.352.69$1,138
May 2016143842.521.99$915
Apr 2016143236.561.99$897
Mar 2016145433.011.79$847
Feb 2016143926.472.06$932
Jan 2016248827.352.36$1,209
Dec 2015149332.362.00$1,019
Nov 2015150038.792.17$1,122
Oct 2015148943.552.43$1,230
Sep 2015151942.992.76$1,475
Aug 2015154940.162.87$1,617
Jul 2015030248.152.95$889
Jun 20150256.152.88$6
May 201521755.212.96$161
Apr 2015236849.822.71$1,096
Mar 2015552442.892.93$1,752
Feb 2015349244.662.98$1,598
Jan 2015456343.433.10$1,919
Dec 2014459854.693.59$2,366
Nov 2014359470.464.25$2,737
Oct 2014562178.303.90$2,814
Sep 2014357986.164.05$2,601
Aug 2014358789.394.04$2,637
Jul 2014155996.564.18$2,433
Jun 2014255798.164.74$2,835
May 2014564394.734.73$3,513
Apr 2014361395.944.81$3,236
Mar 2014214095.895.06$900
Feb 2014349197.406.19$3,332
Jan 2014448890.404.86$2,734
Dec 2013350191.824.35$2,457
Nov 2013449388.853.74$2,198
Oct 2013350297.423.78$2,190
Sep 20132473104.113.72$1,967
Aug 20132500104.253.52$1,970
Jul 20131444102.523.72$1,753
Jun 2013535394.403.93$1,860
May 2013361294.834.15$2,824
Apr 2013560693.964.28$3,065
Mar 2013359093.623.91$2,589
Feb 2013453691.233.42$2,198
Jan 2013658291.603.42$2,540
Dec 2012357786.773.42$2,234
Nov 2012455486.953.62$2,356
Oct 2012257289.383.40$2,123
Sep 2012350194.672.92$1,746
Aug 2012260692.662.91$1,948
Jul 2012360585.133.02$2,083
Jun 2012459479.822.52$1,816
May 2012164191.612.49$1,687
Apr 20123221101.652.00$746
Mar 20124545105.052.22$1,631
Feb 20123596101.102.57$1,835
Jan 2012466698.092.73$2,213
Dec 2011567096.873.24$2,655
Nov 2011667695.723.31$2,813
Oct 2011470884.983.65$2,923
Sep 2011365983.623.99$2,878
Aug 2011457683.404.15$2,724
Jul 2011469194.144.52$3,498
Jun 2011573092.904.64$3,852
May 2011577098.134.40$3,882
Apr 20115767105.964.33$3,853
Mar 2011584496.364.06$3,906
Feb 2011339885.644.18$1,921
Jan 2011668486.504.59$3,658
Dec 2010899685.734.35$5,016
Nov 201071,02880.843.80$4,467
Oct 201051,08078.103.51$4,180
Sep 2010695172.633.98$4,220
Aug 201051,00373.684.42$4,801
Jul 201061,02472.554.74$5,285
Jun 2010698370.364.91$5,249
May 201081,10971.124.24$5,266
Apr 201081,13681.694.12$5,337
Mar 201071,19078.394.39$5,771
Feb 201071,16573.585.44$6,855
Jan 201091,37874.365.96$8,888
Dec 200981,51371.445.48$8,868
Nov 2009101,36374.593.75$5,859
Oct 200961,41272.544.11$6,239
Sep 200951,26665.543.06$4,208
Aug 200971,33967.423.22$4,782
Jul 200961,41861.133.46$5,279
Jun 200951,40966.163.90$5,819
May 200991,65954.743.93$7,005
Apr 2009111,45046.773.59$5,716
Mar 2009101,77842.144.06$7,638
Feb 200971,67932.814.63$8,008
Jan 2009121,87235.865.37$10,485
Dec 2008111,93237.105.98$11,956
Nov 2008112,01255.496.86$14,413
Oct 2008132,14575.246.92$15,826
Sep 2008112,100101.767.88$17,661
Aug 200882,343114.228.48$20,789
Jul 2008102,432131.0811.39$29,010
Jun 2008102,560131.3313.03$34,677
May 2008152,917123.1711.57$35,610
Apr 2008102,946110.3110.45$31,903
Mar 2008153,450101.909.66$34,870
Feb 2008173,69692.538.77$33,989
Jan 2008143,54790.388.21$30,371
Dec 2007124,87488.337.30$36,650
Nov 2007259391.677.29$4,507

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   26 Mcf  × $  2.87 =        $75

────────────────────────────────────────────────────
Month total                                      $75

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/238587 is the state's own key, not one this site invented.