EPPS, H. C. 38

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238597District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.5 M
Dec 2007 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
222
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-24182713
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition424 bbl$32,255
GasProduction267,267 Mcf$1,439,497
Total$1,471,752

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3195, -100.5910. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31950, -100.59101 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,692 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,692 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-43538657126,692 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 20260215106.413.05$655
Apr 2026032798.932.87$938
Mar 2026035189.753.15$1,105
Feb 2026029563.503.75$1,106
Jan 2026066259.138.00$5,295
Dec 202538856.664.41$558
Nov 2025015758.593.93$616
Oct 2025012059.383.30$397
Sep 2025016062.743.08$492
Aug 2025023763.933.01$715
Jul 2025030466.743.32$1,008
Jun 2025043166.483.13$1,348
May 2025030460.553.23$983
Apr 202505962.363.54$209
Mar 2025014367.704.27$610
Feb 20251517370.884.34$1,814
Jan 2025026374.324.28$1,125
Dec 2024037868.993.12$1,180
Nov 2024034569.052.20$758
Oct 2024024871.372.28$566
Sep 2024010269.612.36$241
Aug 2024024475.632.06$504
Jul 2024019179.932.15$410
Jun 2024035478.082.63$932
May 20241133478.812.20$1,601
Apr 2024015084.451.66$249
Mar 2024015580.301.55$240
Feb 2024020876.091.78$371
Jan 2024021773.023.30$716
Dec 2023026471.262.61$689
Nov 2023023077.892.81$646
Oct 2023026285.443.09$809
Sep 2023042489.042.74$1,160
Aug 20231224080.522.67$1,608
Jul 2023013774.852.64$362
Jun 2023020568.962.26$463
May 2023017870.622.23$396
Apr 2023026778.122.24$597
Mar 2023035272.852.39$842
Feb 2023038775.112.47$954
Jan 2023043876.533.39$1,484
Dec 2022054976.415.73$3,145
Nov 2022056585.005.65$3,190
Oct 2022061087.185.86$3,577
Sep 2022057384.888.16$4,678
Aug 2022028994.529.13$2,638
Jul 20220279101.587.54$2,104
Jun 20220345115.097.98$2,752
May 20220340109.378.43$2,867
Apr 20220274104.226.84$1,874
Mar 20220288108.885.08$1,462
Feb 2022015191.054.86$734
Jan 2022018981.844.54$858
Dec 2021019271.323.90$749
Nov 2021024277.435.24$1,267
Oct 2021047579.795.71$2,714
Sep 2021042169.865.35$2,253
Aug 2021046766.024.22$1,971
Jul 2021037270.783.98$1,481
Jun 2021044469.493.38$1,501
May 2021051763.483.02$1,560
Apr 2021055260.362.76$1,523
Mar 2021043661.302.72$1,185
Feb 2021028757.805.55$1,592
Jan 2021020450.412.81$573
Dec 2020039444.642.68$1,054
Nov 2020036438.772.71$985
Oct 2020046536.972.48$1,152
Sep 2020038437.091.99$765
Aug 2020019039.982.39$453
Jul 202007038.371.83$128
Jun 2020011534.901.69$194
May 2020013516.921.81$245
Apr 20201111614.751.80$372
Mar 2020016830.341.86$312
Feb 2020019449.881.98$384
Jan 2020040657.252.09$850
Dec 2019045459.012.30$1,046
Nov 2019054755.302.75$1,505
Oct 2019045253.472.42$1,093
Sep 2019056055.052.66$1,488
Aug 2019035353.112.30$813
Jul 2019448956.272.46$1,428
Jun 2019058352.782.49$1,452
May 2019067358.482.74$1,844
Apr 2019739962.632.75$1,536
Mar 2019017956.803.06$548
Feb 2019022950.852.79$639
Jan 2019064646.033.23$2,085
Dec 2018570746.594.19$3,192
Nov 2018073552.934.24$3,114
Oct 2018060361.443.40$2,049
Sep 2018042859.543.11$1,330
Aug 2018067159.403.07$2,058
Jul 2018046965.142.93$1,375
Jun 2018065060.183.08$2,000
May 2018063465.382.90$1,839
Apr 20181069563.842.90$2,654
Mar 2018075361.222.79$2,098
Feb 2018164161.782.77$1,835
Jan 2018963962.874.01$3,128
Dec 2017072257.272.92$2,109
Nov 2017075655.423.12$2,357
Oct 2017057049.292.98$1,701
Sep 2017973047.523.09$2,681
Aug 2017069545.373.00$2,088
Jul 2017075943.873.09$2,343
Jun 2017076742.493.09$2,368
May 2017873345.373.26$2,755
Apr 2017079247.933.21$2,544
Mar 2017077246.772.98$2,303
Feb 2017973350.452.95$2,618
Jan 2017081249.413.42$2,776
Dec 2016076548.763.72$2,848
Nov 2016876642.492.64$2,365
Oct 2016080846.193.09$2,497
Sep 2016078741.553.10$2,440
Aug 2016082641.442.92$2,416
Jul 2016882641.622.92$2,748
Jun 2016073345.352.69$1,969
May 2016089842.521.99$1,788
Apr 2016889836.561.99$2,080
Mar 2016087333.011.79$1,566
Feb 2016090426.472.06$1,866
Jan 201661,03227.352.36$2,604
Dec 2015262432.362.00$1,314
Nov 2015068038.792.17$1,474
Oct 2015868643.552.43$2,013
Sep 2015061542.992.76$1,696
Aug 2015086540.162.87$2,485
Jul 2015085648.152.95$2,521
Jun 2015786056.152.88$2,872
May 2015074255.212.96$2,193
Apr 2015078349.822.71$2,119
Mar 2015086842.892.93$2,547
Feb 2015887944.662.98$2,973
Jan 2015094843.433.10$2,939
Dec 2014096654.693.59$3,469
Nov 2014785970.464.25$4,146
Oct 2014088678.303.90$3,456
Sep 2014083486.164.05$3,374
Aug 2014890989.394.04$4,383
Jul 201401,06096.564.18$4,430
Jun 201401,06698.164.74$5,050
May 201401,01994.734.73$4,816
Apr 201481,06995.944.81$5,908
Mar 2014092395.895.06$4,667
Feb 2014997397.406.19$6,901
Jan 2014090190.404.86$4,380
Dec 201391,04591.824.35$5,377
Nov 201301,04688.853.74$3,910
Oct 201381,16797.423.78$5,190
Sep 201301,140104.113.72$4,238
Aug 201371,107104.253.52$4,629
Jul 201301,154102.523.72$4,290
Jun 201301,18794.403.93$4,669
May 201381,22294.834.15$5,829
Apr 201301,20293.964.28$5,148
Mar 201381,24693.623.91$5,624
Feb 201301,12891.233.42$3,858
Jan 201381,27091.603.42$5,076
Dec 201201,26886.773.42$4,337
Nov 201281,27986.953.62$5,332
Oct 201281,28289.383.40$5,073
Sep 201201,30294.672.92$3,800
Aug 201201,38892.662.91$4,037
Jul 201201,43785.133.02$4,341
Jun 201201,39779.822.52$3,519
May 201201,44391.612.49$3,591
Apr 201201,467101.652.00$2,929
Mar 201261,600105.052.22$4,186
Feb 201201,540101.102.57$3,958
Jan 201201,27698.092.73$3,489
Dec 201101,64996.873.24$5,342
Nov 201111,65695.723.31$5,579
Oct 201101,60584.983.65$5,856
Sep 201101,53983.623.99$6,134
Aug 201101,66383.404.15$6,900
Jul 201101,68994.144.52$7,630
Jun 201101,43392.904.64$6,649
May 201101,35398.134.40$5,960
Apr 201101,457105.964.33$6,314
Mar 201101,62396.364.06$6,585
Feb 201101,52585.644.18$6,374
Jan 201101,69186.504.59$7,760
Dec 201001,93985.734.35$8,430
Nov 2010141,73880.843.80$7,728
Oct 201001,61878.103.51$5,677
Sep 201001,38772.633.98$5,520
Aug 201001,44673.684.42$6,390
Jul 201001,59772.554.74$7,564
Jun 2010112,18270.364.91$11,488
May 201002,37271.124.24$10,046
Apr 201002,27681.694.12$9,383
Mar 201022,33178.394.39$10,387
Feb 201002,20273.585.44$11,984
Jan 201002,35874.365.96$14,063
Dec 2009122,41771.445.48$14,112
Nov 2009112,46474.593.75$10,064
Oct 200902,85772.544.11$11,743
Sep 200902,86165.543.06$8,768
Aug 200903,07267.423.22$9,887
Jul 200903,14061.133.46$10,879
Jun 2009103,11066.163.90$12,775
May 200903,34554.743.93$13,132
Apr 200902,63646.773.59$9,457
Mar 200903,22442.144.06$13,086
Feb 2009163,26332.814.63$15,642
Jan 200903,71235.865.37$19,937
Dec 200803,93737.105.98$23,532
Nov 200804,03855.496.86$27,702
Oct 200804,44275.246.92$30,747
Sep 2008234,593101.767.88$38,520
Aug 200805,154114.228.48$43,721
Jul 200805,393131.0811.39$61,423
Jun 2008246,022131.3313.03$81,634
May 2008227,168123.1711.57$85,674
Apr 200804,930110.3110.45$51,542
Mar 200807,792101.909.66$75,302
Feb 200809,47992.538.77$83,136
Jan 2008712,47090.388.21$102,958
Dec 200707,14888.337.30$52,194

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  215 Mcf  × $  3.05 =       $655

────────────────────────────────────────────────────
Month total                                     $655

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/238597 is the state's own key, not one this site invented.