MITTEL, BEN

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 238832District 7CField 846465002 tax incentive programmesGasSaveExport
Value, all time
$861 k
Jul 2007 – May 2026
Value, last 12 filed months
$326
at the published price for each month
Months reported
227
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-23179752
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction139,704 Mcf$860,570
Total$860,570

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6949, -100.6880. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.69488, -100.68800 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,334 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,334 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-43538558157,334 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 20269106.413.05$27
Apr 20261098.932.87$29
Mar 20261089.753.15$31
Feb 2026563.503.75$19
Jan 20261059.138.00$80
Dec 2025656.664.41$26
Nov 2025658.593.93$24
Oct 20251059.383.30$33
Sep 2025562.743.08$15
Aug 2025463.933.01$12
Jul 2025466.743.32$13
Jun 2025566.483.13$16
May 2025560.553.23$16
Apr 2025362.363.54$11
Mar 2025567.704.27$21
Feb 2025270.884.34$9
Jan 2025374.324.28$13
Dec 2024668.993.12$19
Nov 2024569.052.20$11
Oct 2024471.372.28$9
Sep 2024569.612.36$12
Aug 2024275.632.06$4
Jul 20241179.932.15$24
Jun 2024678.082.63$16
May 2024378.812.20$7
Apr 2024384.451.66$5
Mar 2024280.301.55$3
Feb 20244776.091.78$84
Jan 20248373.023.30$274
Dec 20238571.262.61$222
Nov 20238477.892.81$236
Oct 20238985.443.09$275
Sep 20238689.042.74$235
Aug 20238980.522.67$238
Jul 20239074.852.64$238
Jun 20238968.962.26$201
May 20239370.622.23$207
Apr 20239078.122.24$201
Mar 20239672.852.39$230
Feb 20238675.112.47$212
Jan 20239976.533.39$335
Dec 202211876.415.73$676
Nov 20228685.005.65$486
Oct 20228887.185.86$516
Sep 20228584.888.16$694
Aug 20228894.529.13$803
Jul 202288101.587.54$664
Jun 202286115.097.98$686
May 202290109.378.43$759
Apr 202288104.226.84$602
Mar 202291108.885.08$462
Feb 20228191.054.86$394
Jan 20229081.844.54$408
Dec 20219371.323.90$363
Nov 20219277.435.24$482
Oct 20219479.795.71$537
Sep 20219169.865.35$487
Aug 20219466.024.22$397
Jul 20219570.783.98$378
Jun 20219169.493.38$308
May 20219663.483.02$290
Apr 20219360.362.76$257
Mar 20218161.302.72$220
Feb 20218657.805.55$477
Jan 20219550.412.81$267
Dec 20209544.642.68$254
Nov 20209738.772.71$263
Oct 202010136.972.48$250
Sep 20209837.091.99$195
Aug 202010339.982.39$246
Jul 202010338.371.83$188
Jun 202010434.901.69$176
May 202010316.921.81$187
Apr 202010114.751.80$182
Mar 202010430.341.86$193
Feb 20209349.881.98$184
Jan 202010457.252.09$218
Dec 201910159.012.30$233
Nov 201910655.302.75$292
Oct 201911153.472.42$268
Sep 201912555.052.66$332
Aug 201911453.112.30$263
Jul 201911256.272.46$276
Jun 201910852.782.49$269
May 201911158.482.74$304
Apr 201910962.632.75$300
Mar 201911156.803.06$340
Feb 201910250.852.79$285
Jan 201911546.033.23$371
Dec 201811546.594.19$481
Nov 201814752.934.24$623
Oct 201814561.443.40$493
Sep 20187959.543.11$246
Aug 201816759.403.07$512
Jul 201817765.142.93$519
Jun 201818860.183.08$578
May 201816765.382.90$484
Apr 201812663.842.90$366
Mar 201813461.222.79$373
Feb 201811961.782.77$329
Jan 201812762.874.01$509
Dec 201713857.272.92$403
Nov 201713555.423.12$421
Oct 201714149.292.98$421
Sep 201714047.523.09$432
Aug 201714145.373.00$424
Jul 201714843.873.09$457
Jun 201714442.493.09$445
May 201715045.373.26$490
Apr 201714547.933.21$466
Mar 201715246.772.98$454
Feb 201713950.452.95$410
Jan 201715449.413.42$527
Dec 201615648.763.72$581
Nov 201615342.492.64$405
Oct 201615546.193.09$479
Sep 201615141.553.10$468
Aug 201616141.442.92$471
Jul 201616541.622.92$483
Jun 201616445.352.69$440
May 201617442.521.99$346
Apr 201616836.561.99$334
Mar 201617633.011.79$316
Feb 201616226.472.06$334
Jan 201617227.352.36$407
Dec 201518932.362.00$378
Nov 201518438.792.17$399
Oct 201523243.552.43$563
Sep 201519742.992.76$543
Aug 201520340.162.87$583
Jul 201520848.152.95$613
Jun 201520756.152.88$597
May 201521155.212.96$624
Apr 201520049.822.71$541
Mar 201521042.892.93$616
Feb 201519244.662.98$571
Jan 201521843.433.10$676
Dec 201422154.693.59$794
Nov 201420670.464.25$876
Oct 201424578.303.90$956
Sep 201425186.164.05$1,015
Aug 201412189.394.04$488
Jul 201419496.564.18$811
Jun 201425898.164.74$1,222
May 201428994.734.73$1,366
Apr 201422695.944.81$1,087
Mar 20145895.895.06$293
Feb 201426097.406.19$1,610
Jan 201433390.404.86$1,619
Dec 201332991.824.35$1,433
Nov 201334388.853.74$1,282
Oct 201323497.423.78$884
Sep 2013208104.113.72$773
Aug 2013202104.253.52$712
Jul 2013264102.523.72$981
Jun 201329094.403.93$1,141
May 201330894.834.15$1,278
Apr 201330593.964.28$1,306
Mar 201331393.623.91$1,225
Feb 201329391.233.42$1,002
Jan 201332891.603.42$1,122
Dec 201234786.773.42$1,187
Nov 201237086.953.62$1,341
Oct 201239089.383.40$1,326
Sep 201232894.672.92$957
Aug 201245892.662.91$1,332
Jul 201247185.133.02$1,423
Jun 201245679.822.52$1,149
May 201247691.612.49$1,184
Apr 2012486101.652.00$970
Mar 2012512105.052.22$1,138
Feb 2012454101.102.57$1,167
Jan 201246998.092.73$1,282
Dec 201140896.873.24$1,322
Nov 201140595.723.31$1,341
Oct 201145084.983.65$1,642
Sep 201144283.623.99$1,762
Aug 201148083.404.15$1,992
Jul 201148694.144.52$2,195
Jun 201149792.904.64$2,306
May 201153198.134.40$2,339
Apr 2011532105.964.33$2,305
Mar 201157796.364.06$2,341
Feb 201149785.644.18$2,077
Jan 201160986.504.59$2,795
Dec 201060285.734.35$2,617
Nov 201069580.843.80$2,638
Oct 201072678.103.51$2,547
Sep 201067472.633.98$2,682
Aug 201071473.684.42$3,155
Jul 201077872.554.74$3,685
Jun 201077670.364.91$3,810
May 201084971.124.24$3,596
Apr 201084381.694.12$3,475
Mar 201091578.394.39$4,016
Feb 201082173.585.44$4,468
Jan 201089974.365.96$5,362
Dec 200994871.445.48$5,199
Nov 20091,01374.593.75$3,800
Oct 20091,11072.544.11$4,562
Sep 20091,15265.543.06$3,531
Aug 20091,12967.423.22$3,634
Jul 20091,24161.133.46$4,299
Jun 20091,16066.163.90$4,518
May 20091,39254.743.93$5,465
Apr 20091,44346.773.59$5,177
Mar 20091,54042.144.06$6,251
Feb 20091,47332.814.63$6,824
Jan 20091,71335.865.37$9,201
Dec 20081,81337.105.98$10,837
Nov 20081,94755.496.86$13,357
Oct 20081,96975.246.92$13,629
Sep 20082,139101.767.88$16,849
Aug 20082,395114.228.48$20,317
Jul 20082,588131.0811.39$29,476
Jun 20082,702131.3313.03$35,214
May 20083,092123.1711.57$35,788
Apr 20083,236110.3110.45$33,832
Mar 20083,694101.909.66$35,699
Feb 20083,77492.538.77$33,100
Jan 20084,54390.388.21$37,279
Dec 20075,12388.337.30$37,408
Nov 20075,86591.677.29$42,766
Oct 20076,96482.856.92$48,205
Sep 20078,56775.846.24$53,494
Aug 200712,67269.066.39$80,948
Jul 200710,91370.906.39$69,712

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                    9 Mcf  × $  3.05 =        $27

────────────────────────────────────────────────────
Month total                                      $27

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/238832 is the state's own key, not one this site invented.