Operated by ROBERT C. BROWER, LLC (P-5 100445) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 239004District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Oct 2007 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
224
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-04-16191031
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition429 bbl$32,222
GasProduction218,010 Mcf$1,149,119
Total$1,181,341

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4761, -100.7468. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.47605, -100.74676 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,002 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,002 ft.

Completions filed
Oct 2007
1 of 1 wells

1 well

42-43538591168,002 ftOct 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (224)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

224 months

May 202600106.413.05$0
Apr 2026114598.932.87$515
Mar 2026116989.753.15$622
Feb 2026114563.503.75$607
Jan 2026114359.138.00$1,203
Dec 2025116056.664.41$763
Nov 2025117458.593.93$742
Oct 2025112159.383.30$459
Sep 2025112962.743.08$460
Aug 2025117163.933.01$579
Jul 2025115266.743.32$571
Jun 2025116066.483.13$567
May 2025117160.553.23$613
Apr 2025115462.363.54$608
Mar 2025116467.704.27$768
Feb 2025115370.884.34$735
Jan 2025117774.324.28$832
Dec 2024118168.993.12$634
Nov 2024116969.052.20$441
Oct 2024116871.372.28$455
Sep 2024114769.612.36$417
Aug 2024115175.632.06$387
Jul 2024117279.932.15$449
Jun 2024216478.082.63$588
May 2024115978.812.20$428
Apr 2024115884.451.66$347
Mar 202438280.301.55$368
Feb 2024115476.091.78$351
Jan 2024017373.023.30$571
Dec 2023117371.262.61$523
Nov 2023010477.892.81$292
Oct 202306385.443.09$195
Sep 202319489.042.74$346
Aug 2023111180.522.67$377
Jul 202319474.852.64$323
Jun 202318368.962.26$256
May 2023014670.622.23$325
Apr 2023111078.122.24$324
Mar 2023112572.852.39$372
Feb 2023112675.112.47$386
Jan 2023220276.533.39$837
Dec 2022122576.415.73$1,365
Nov 2022118685.005.65$1,135
Oct 2022120987.185.86$1,313
Sep 2022220984.888.16$1,876
Aug 2022241194.529.13$3,940
Jul 20222568101.587.54$4,487
Jun 20223518115.097.98$4,477
May 20224566109.378.43$5,211
Apr 20221401104.226.84$2,846
Mar 20222261108.885.08$1,543
Feb 2022118591.054.86$990
Jan 2022021481.844.54$971
Dec 2021225271.323.90$1,125
Nov 2021236677.435.24$2,072
Oct 2021115979.795.71$988
Sep 2021223769.865.35$1,408
Aug 2021345766.024.22$2,127
Jul 2021244370.783.98$1,906
Jun 2021349769.493.38$1,889
May 2021474363.483.02$2,496
Apr 2021058860.362.76$1,622
Mar 20213061.302.72$184
Feb 20210057.805.55$0
Jan 202101,26750.412.81$3,561
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020110514.751.80$204
Mar 2020126330.341.86$519
Feb 2020113649.881.98$319
Jan 2020318057.252.09$549
Dec 2019133859.012.30$838
Nov 2019213955.302.75$493
Oct 2019333853.472.42$978
Sep 2019142855.052.66$1,192
Aug 2019129253.112.30$726
Jul 2019262256.272.46$1,643
Jun 2019248652.782.49$1,316
May 2019377758.482.74$2,305
Apr 2019170262.632.75$1,994
Mar 2019065556.803.06$2,006
Feb 2019055350.852.79$1,544
Jan 2019154646.033.23$1,809
Dec 2018172146.594.19$3,064
Nov 2018356652.934.24$2,557
Oct 2018043661.443.40$1,482
Sep 2018162359.543.11$1,996
Aug 2018078159.403.07$2,395
Jul 2018164965.142.93$1,968
Jun 2018035060.183.08$1,077
May 2018172865.382.90$2,177
Apr 2018064263.842.90$1,862
Mar 2018044261.222.79$1,232
Feb 2018045561.782.77$1,259
Jan 2018160862.874.01$2,501
Dec 2017763257.272.92$2,247
Nov 2017663255.423.12$2,303
Oct 2017071149.292.98$2,121
Sep 2017169747.523.09$2,199
Aug 2017165145.373.00$2,001
Jul 2017369443.873.09$2,274
Jun 2017251742.493.09$1,681
May 201701,08845.373.26$3,551
Apr 2017069347.933.21$2,226
Mar 2017049646.772.98$1,480
Feb 2017038750.452.95$1,143
Jan 2017075049.413.42$2,564
Dec 2016099748.763.72$3,712
Nov 2016093242.492.64$2,465
Oct 2016068146.193.09$2,104
Sep 201601,05541.553.10$3,271
Aug 2016095141.442.92$2,781
Jul 201601,03641.622.92$3,030
Jun 201601,06645.352.69$2,863
May 2016097342.521.99$1,937
Apr 2016083336.561.99$1,659
Mar 2016098733.011.79$1,771
Feb 2016073626.472.06$1,519
Jan 2016082127.352.36$1,941
Dec 2015083832.362.00$1,677
Nov 2015084238.792.17$1,825
Oct 2015071643.552.43$1,737
Sep 2015062942.992.76$1,735
Aug 2015063140.162.87$1,813
Jul 2015073348.152.95$2,159
Jun 2015080556.152.88$2,321
May 2015088255.212.96$2,607
Apr 201501,03849.822.71$2,809
Mar 201501,10442.892.93$3,240
Feb 201501,02044.662.98$3,036
Jan 2015088243.433.10$2,735
Dec 2014080754.693.59$2,898
Nov 2014072870.464.25$3,095
Oct 2014098778.303.90$3,850
Sep 2014069986.164.05$2,828
Aug 2014099289.394.04$4,003
Jul 201401,03196.564.18$4,309
Jun 201401,19298.164.74$5,646
May 201401,01194.734.73$4,779
Apr 201401,00595.944.81$4,833
Mar 2014091995.895.06$4,647
Feb 201401,00697.406.19$6,229
Jan 2014094790.404.86$4,603
Dec 201301,03891.824.35$4,520
Nov 201301,25288.853.74$4,680
Oct 201301,13497.423.78$4,286
Sep 20130598104.113.72$2,223
Aug 20130987104.253.52$3,477
Jul 201301,225102.523.72$4,554
Jun 201301,15294.403.93$4,531
May 201301,25694.834.15$5,211
Apr 201301,07493.964.28$4,600
Mar 201301,12193.623.91$4,386
Feb 2013082991.233.42$2,835
Jan 2013077191.603.42$2,637
Dec 201201,07886.773.42$3,687
Nov 2012095186.953.62$3,447
Oct 201201,12689.383.40$3,828
Sep 201201,03494.672.92$3,018
Aug 201201,16392.662.91$3,382
Jul 201201,49085.133.02$4,501
Jun 201201,36279.822.52$3,431
May 201201,85891.612.49$4,623
Apr 201201,435101.652.00$2,865
Mar 201201,739105.052.22$3,864
Feb 201201,379101.102.57$3,544
Jan 201201,23598.092.73$3,377
Dec 201101,14596.873.24$3,710
Nov 2011089795.723.31$2,970
Oct 201101,05184.983.65$3,835
Sep 201101,10383.623.99$4,396
Aug 2011086083.404.15$3,568
Jul 201101,09694.144.52$4,951
Jun 2011094992.904.64$4,403
May 201101,16598.134.40$5,132
Apr 20110861105.964.33$3,731
Mar 201111,13896.364.06$4,714
Feb 2011399485.644.18$4,412
Jan 2011101,87286.504.59$9,455
Dec 2010131,49785.734.35$7,623
Nov 201011,32880.843.80$5,121
Oct 2010079978.103.51$2,804
Sep 2010095972.633.98$3,816
Aug 201001,44473.684.42$6,382
Jul 201001,43972.554.74$6,816
Jun 2010161,47970.364.91$8,388
May 2010301,56471.124.24$8,757
Apr 2010461,52481.694.12$10,041
Mar 2010251,67078.394.39$9,289
Feb 2010341,33173.585.44$9,746
Jan 201021,95374.365.96$11,797
Dec 200921,56771.445.48$8,736
Nov 200991,73774.593.75$7,188
Oct 200981,84272.544.11$8,151
Sep 2009080665.543.06$2,470
Aug 200901,14067.423.22$3,669
Jul 200931,55461.133.46$5,567
Jun 200901,28666.163.90$5,009
May 200961,74054.743.93$7,159
Apr 200931,67846.773.59$6,160
Mar 200942,06442.144.06$8,546
Feb 200942,00832.814.63$9,434
Jan 2009152,55635.865.37$14,266
Dec 200802,63837.105.98$15,768
Nov 200882,52155.496.86$17,739
Oct 200842,82475.246.92$19,849
Sep 2008102,871101.767.88$23,633
Aug 200863,749114.228.48$32,488
Jul 200864,083131.0811.39$47,290
Jun 200803,045131.3313.03$39,684
May 200873,816123.1711.57$45,030
Apr 2008134,682110.3110.45$50,384
Mar 200804,807101.909.66$46,455
Feb 200804,87292.538.77$42,730
Jan 200877,11990.388.21$59,049
Dec 200707,68488.337.30$56,108
Nov 200708,91491.677.29$64,998
Oct 200707,22282.856.92$49,991

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $ 98.93 =        $99
Gas                  145 Mcf  × $  2.87 =       $416

────────────────────────────────────────────────────
Month total                                     $515

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/239004 is the state's own key, not one this site invented.