CLAYTON 7

Operated by UPP OPERATING, LLC (P-5 875310) in the OZONA, NE. (CANYON 7520) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 239617District 7CField 679985002 tax incentive programmesCondensateGasSaveExport
Value, all time
$283 k
Feb 2008 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 592 leases and 641 wells, and the rule below applies to all of them.

Discovered
1966-01-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: PER DOCKET 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-10-20183763
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition207 bbl$14,573
GasProduction53,960 Mcf$268,709
Total$283,282

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.8528, -100.9896. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.85281, -100.98961 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,656 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,656 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-1054034148,656 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 2026084106.413.05$256
Apr 202608798.932.87$250
Mar 2026013589.753.15$425
Feb 20260063.503.75$0
Jan 202625559.138.00$558
Dec 2025012856.664.41$565
Nov 202503658.593.93$141
Oct 202508559.383.30$281
Sep 202508162.743.08$249
Aug 202508363.933.01$250
Jul 202508466.743.32$278
Jun 202518666.483.13$336
May 202518360.553.23$329
Apr 202506962.363.54$244
Mar 202519367.704.27$465
Feb 202516470.884.34$349
Jan 202518374.324.28$429
Dec 202418368.993.12$328
Nov 202418669.052.20$258
Oct 202419371.372.28$284
Sep 202419669.612.36$297
Aug 202419475.632.06$270
Jul 202417379.932.15$237
Jun 202408078.082.63$211
May 202408678.812.20$189
Apr 202418384.451.66$222
Mar 202408580.301.55$131
Feb 202419676.091.78$247
Jan 202419073.023.30$370
Dec 202318971.262.61$304
Nov 202309977.892.81$278
Oct 202309085.443.09$278
Sep 202329389.042.74$432
Aug 2023110080.522.67$348
Jul 202319474.852.64$323
Jun 2023339168.962.26$1,090
May 2023119370.622.23$501
Apr 2023114678.122.24$405
Mar 2023010472.852.39$249
Feb 202387575.112.47$786
Jan 202319976.533.39$412
Dec 202209776.415.73$556
Nov 2022110585.005.65$678
Oct 202219487.185.86$638
Sep 2022119084.888.16$1,636
Aug 2022327594.529.13$2,794
Jul 20222400101.587.54$3,220
Jun 20221310115.097.98$2,588
May 20220245109.378.43$2,066
Apr 20220121104.226.84$827
Mar 20220130108.885.08$660
Feb 2022011891.054.86$573
Jan 2022013781.844.54$622
Dec 2021113571.323.90$598
Nov 2021013977.435.24$728
Oct 2021113779.795.71$863
Sep 2021014269.865.35$760
Aug 2021114066.024.22$657
Jul 2021013370.783.98$530
Jun 2021613269.493.38$863
May 2021411863.483.02$610
Apr 2021013660.362.76$375
Mar 2021014361.302.72$389
Feb 2021010757.805.55$594
Jan 2021113450.412.81$427
Dec 2020113944.642.68$417
Nov 2020013738.772.71$371
Oct 2020316336.972.48$515
Sep 2020015737.091.99$313
Aug 2020027739.982.39$661
Jul 2020025838.371.83$471
Jun 2020018234.901.69$308
May 2020021116.921.81$383
Apr 2020014014.751.80$253
Mar 2020012630.341.86$234
Feb 2020113349.881.98$313
Jan 2020114357.252.09$357
Dec 2019411459.012.30$499
Nov 2019013155.302.75$360
Oct 2019115553.472.42$428
Sep 2019117555.052.66$520
Aug 2019235753.112.30$929
Jul 2019123356.272.46$629
Jun 2019019852.782.49$493
May 2019017158.482.74$469
Apr 2019016462.632.75$451
Mar 2019017156.803.06$524
Feb 2019815150.852.79$828
Jan 2019015246.033.23$491
Dec 2018016546.594.19$691
Nov 2018016952.934.24$716
Oct 2018712861.443.40$865
Sep 2018116659.543.11$575
Aug 2018116459.403.07$562
Jul 20180665.142.93$18
Jun 2018116560.183.08$568
May 2018017465.382.90$505
Apr 2018016763.842.90$484
Mar 2018017261.222.79$479
Feb 2018715761.782.77$867
Jan 2018017162.874.01$686
Dec 2017017757.272.92$517
Nov 2017017655.423.12$549
Oct 2017019449.292.98$579
Sep 2017014147.523.09$435
Aug 2017018345.373.00$550
Jul 2017018243.873.09$562
Jun 2017718042.493.09$853
May 2017018045.373.26$587
Apr 2017017847.933.21$572
Mar 2017019346.772.98$576
Feb 2017014250.452.95$419
Jan 2017019049.413.42$650
Dec 2016018848.763.72$700
Nov 2016719242.492.64$805
Oct 2016019746.193.09$609
Sep 2016019441.553.10$602
Aug 2016020441.442.92$597
Jul 2016020941.622.92$611
Jun 2016015645.352.69$419
May 2016021242.521.99$422
Apr 2016721136.561.99$676
Mar 2016021033.011.79$377
Feb 2016021026.472.06$433
Jan 2016022227.352.36$525
Dec 2015022732.362.00$454
Nov 2015026638.792.17$577
Oct 2015024243.552.43$587
Sep 2015023042.992.76$634
Aug 2015024240.162.87$695
Jul 2015024748.152.95$727
Jun 2015924256.152.88$1,203
May 2015026055.212.96$768
Apr 2015125349.822.71$735
Mar 2015225742.892.93$840
Feb 2015022344.662.98$664
Jan 2015126043.433.10$850
Dec 2014126554.693.59$1,006
Nov 2014015470.464.25$655
Oct 2014027778.303.90$1,081
Sep 2014026786.164.05$1,080
Aug 2014129389.394.04$1,272
Jul 2014129096.564.18$1,309
Jun 2014923698.164.74$2,001
May 2014033894.734.73$1,598
Apr 2014032395.944.81$1,553
Mar 2014132595.895.06$1,739
Feb 2014128497.406.19$1,856
Jan 20141435290.404.86$2,977
Dec 2013036091.824.35$1,568
Nov 2013035588.853.74$1,327
Oct 2013040297.423.78$1,519
Sep 20130435104.113.72$1,617
Aug 20130475104.253.52$1,673
Jul 20130573102.523.72$2,130
Jun 2013435694.403.93$1,778
May 2013010294.834.15$423
Apr 201307193.964.28$304
Mar 201308093.623.91$313
Feb 2013215791.233.42$719
Jan 201305691.603.42$192
Dec 201207186.773.42$243
Nov 201227086.953.62$428
Oct 201204989.383.40$167
Sep 201206994.672.92$201
Aug 201209992.662.91$288
Jul 2012011685.133.02$350
Jun 2012011779.822.52$295
May 2012010491.612.49$259
Apr 2012099101.652.00$198
Mar 2012094105.052.22$209
Feb 2012383101.102.57$517
Jan 201209498.092.73$257
Dec 201109296.873.24$298
Nov 201148795.723.31$671
Oct 2011010384.983.65$376
Sep 2011014383.623.99$570
Aug 2011017583.404.15$726
Jul 2011016094.144.52$723
Jun 2011016792.904.64$775
May 2011017398.134.40$762
Apr 20114177105.964.33$1,191
Mar 2011019196.364.06$775
Feb 2011019385.644.18$807
Jan 2011021286.504.59$973
Dec 2010522585.734.35$1,407
Nov 2010020980.843.80$793
Oct 2010025378.103.51$888
Sep 2010028172.633.98$1,118
Aug 2010630373.684.42$1,781
Jul 2010039472.554.74$1,866
Jun 2010027670.364.91$1,355
May 2010737671.124.24$2,090
Apr 2010038681.694.12$1,591
Mar 2010046478.394.39$2,036
Feb 2010039573.585.44$2,150
Jan 2010043774.365.96$2,606
Dec 2009049071.445.48$2,687
Nov 2009755774.593.75$2,612
Oct 2009048172.544.11$1,977
Sep 2009053665.543.06$1,643
Aug 2009060667.423.22$1,950
Jul 2009064261.133.46$2,224
Jun 2009064666.163.90$2,516
May 2009071254.743.93$2,795
Apr 2009372946.773.59$2,756
Mar 2009098542.144.06$3,998
Feb 200901,13132.814.63$5,240
Jan 20090035.865.37$0
Dec 20080937.105.98$54
Nov 2008083555.496.86$5,728
Oct 200801,13575.246.92$7,856
Sep 20080317101.767.88$2,497
Aug 20080818114.228.48$6,939
Jul 200801,038131.0811.39$11,822
Jun 200801,076131.3313.03$14,023
May 200801,317123.1711.57$15,243
Apr 200801,452110.3110.45$15,180
Mar 200801,779101.909.66$17,192
Feb 200801,62292.538.77$14,226

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   84 Mcf  × $  3.05 =       $256

────────────────────────────────────────────────────
Month total                                     $256

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/239617 is the state's own key, not one this site invented.