PARMER 30

Operated by UPP OPERATING, LLC (P-5 875310) in the OZONA, NE. (CANYON 7520) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 239653District 7CField 679985002 tax incentive programmesCondensateGasSaveExport
Value, all time
$298 k
Jan 2008 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 592 leases and 641 wells, and the rule below applies to all of them.

Discovered
1966-01-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: PER DOCKET 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-10-20183331
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition848 bbl$63,347
GasProduction52,991 Mcf$234,890
Total$298,237

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7722, -100.9394. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.77224, -100.93939 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,650 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,650 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-4133249238,650 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 2026012106.413.05$37
Apr 202609298.932.87$264
Mar 2026011289.753.15$353
Feb 2026010363.503.75$386
Jan 202608259.138.00$656
Dec 2025010056.664.41$441
Nov 2025010158.593.93$397
Oct 2025010159.383.30$334
Sep 2025010262.743.08$314
Aug 2025010563.933.01$317
Jul 2025011066.743.32$365
Jun 2025010566.483.13$329
May 2025210860.553.23$470
Apr 2025010562.363.54$372
Mar 2025011367.704.27$482
Feb 2025010370.884.34$447
Jan 2025011374.324.28$483
Dec 2024011368.993.12$353
Nov 2024011669.052.20$255
Oct 2024012171.372.28$276
Sep 2024011469.612.36$270
Aug 2024012675.632.06$260
Jul 2024012879.932.15$275
Jun 2024011478.082.63$300
May 2024011478.812.20$251
Apr 2024011984.451.66$197
Mar 2024012880.301.55$198
Feb 2024011976.091.78$212
Jan 2024011073.023.30$363
Dec 20230071.262.61$0
Nov 202301877.892.81$51
Oct 202309385.443.09$287
Sep 202309189.042.74$249
Aug 202309580.522.67$254
Jul 2023010074.852.64$264
Jun 2023010068.962.26$226
May 2023011270.622.23$249
Apr 2023011078.122.24$246
Mar 2023013972.852.39$333
Feb 2023012675.112.47$311
Jan 202306876.533.39$230
Dec 202203876.415.73$218
Nov 202207585.005.65$423
Oct 2022014987.185.86$874
Sep 2022010484.888.16$849
Aug 2022012194.529.13$1,104
Jul 20220141101.587.54$1,063
Jun 20220149115.097.98$1,189
May 2022084109.378.43$708
Apr 20220130104.226.84$889
Mar 20220147108.885.08$746
Feb 202208391.054.86$403
Jan 2022018881.844.54$853
Dec 2021012471.323.90$483
Nov 2021024577.435.24$1,283
Oct 202107979.795.71$451
Sep 20210069.865.35$0
Aug 20210266.024.22$8
Jul 202102470.783.98$96
Jun 20211069.493.38$69
May 202101463.483.02$42
Apr 20211060.362.76$60
Mar 202111361.302.72$97
Feb 202101557.805.55$83
Jan 202124650.412.81$230
Dec 2020213044.642.68$437
Nov 2020113838.772.71$412
Oct 2020214536.972.48$433
Sep 2020113137.091.99$298
Aug 2020215339.982.39$445
Jul 2020117138.371.83$350
Jun 2020222634.901.69$452
May 202019716.921.81$193
Apr 202046114.751.80$169
Mar 2020215330.341.86$345
Feb 2020216949.881.98$434
Jan 2020317757.252.09$543
Dec 2019418659.012.30$665
Nov 2019315855.302.75$601
Oct 2019218553.472.42$554
Sep 2019419755.052.66$744
Aug 2019320053.112.30$620
Jul 2019320156.272.46$663
Jun 2019319852.782.49$652
May 2019519858.482.74$835
Apr 2019121262.632.75$646
Mar 2019310556.803.06$492
Feb 2019519150.852.79$788
Jan 2019422846.033.23$920
Dec 2018312746.594.19$671
Nov 2018414252.934.24$813
Oct 2018417561.443.40$840
Sep 2018117859.543.11$613
Aug 2018318659.403.07$749
Jul 2018319665.142.93$770
Jun 2018220560.183.08$751
May 2018418565.382.90$798
Apr 2018418563.842.90$792
Mar 2018522361.222.79$928
Feb 2018421161.782.77$831
Jan 2018624762.874.01$1,368
Dec 2017426157.272.92$992
Nov 2017324355.423.12$924
Oct 2017423849.292.98$907
Sep 2017221747.523.09$765
Aug 2017423745.373.00$894
Jul 2017424143.873.09$920
Jun 2017322842.493.09$831
May 2017624445.373.26$1,068
Apr 2017423547.933.21$946
Mar 2017524446.772.98$962
Feb 2017422050.452.95$851
Jan 2017524649.413.42$1,088
Dec 2016624948.763.72$1,220
Nov 2016422942.492.64$776
Oct 2016523046.193.09$942
Sep 2016323841.553.10$863
Aug 2016427841.442.92$979
Jul 2016627441.622.92$1,051
Jun 2016426945.352.69$904
May 2016428442.521.99$736
Apr 2016421436.561.99$572
Mar 2016628533.011.79$709
Feb 2016522626.472.06$599
Jan 2016427327.352.36$755
Dec 2015620632.362.00$606
Nov 2015527238.792.17$783
Oct 2015533843.552.43$1,038
Sep 2015429642.992.76$988
Aug 2015430140.162.87$1,025
Jul 2015529048.152.95$1,095
Jun 2015430356.152.88$1,098
May 2015729055.212.96$1,244
Apr 2015529049.822.71$1,034
Mar 2015530042.892.93$1,095
Feb 2015326144.662.98$911
Jan 2015631343.433.10$1,231
Dec 2014531054.693.59$1,387
Nov 2014530270.464.25$1,636
Oct 2014631778.303.90$1,706
Sep 2014532086.164.05$1,725
Aug 2014521889.394.04$1,327
Jul 2014530296.564.18$1,745
Jun 2014624998.164.74$1,768
May 2014529894.734.73$1,882
Apr 2014630295.944.81$2,028
Mar 2014932395.895.06$2,496
Feb 2014527897.406.19$2,208
Jan 2014830690.404.86$2,211
Dec 2013629891.824.35$1,849
Nov 2013728588.853.74$1,687
Oct 2013623097.423.78$1,454
Sep 20136368104.113.72$1,993
Aug 20135273104.253.52$1,483
Jul 20134307102.523.72$1,551
Jun 2013419094.403.93$1,125
May 2013421194.834.15$1,255
Apr 2013626093.964.28$1,677
Mar 2013523893.623.91$1,399
Feb 2013321891.233.42$1,019
Jan 2013516291.603.42$1,012
Dec 2012724886.773.42$1,456
Nov 2012731286.953.62$1,740
Oct 2012934889.383.40$1,988
Sep 2012633794.672.92$1,552
Aug 2012533492.662.91$1,435
Jul 2012535085.133.02$1,483
Jun 2012533979.822.52$1,253
May 2012636091.612.49$1,445
Apr 20125343101.652.00$1,193
Mar 20126358105.052.22$1,426
Feb 20125340101.102.57$1,379
Jan 2012434898.092.73$1,344
Dec 2011736696.873.24$1,864
Nov 2011635495.723.31$1,747
Oct 2011436684.983.65$1,675
Sep 2011434483.623.99$1,706
Aug 2011438183.404.15$1,914
Jul 2011635694.144.52$2,173
Jun 2011334092.904.64$1,856
May 2011536098.134.40$2,076
Apr 20115364105.964.33$2,107
Mar 2011637896.364.06$2,112
Feb 2011630385.644.18$1,780
Jan 2011734186.504.59$2,170
Dec 2010424785.734.35$1,417
Nov 2010328980.843.80$1,339
Oct 2010317778.103.51$855
Sep 2010328372.633.98$1,344
Aug 2010431473.684.42$1,682
Jul 2010630272.554.74$1,866
Jun 2010430670.364.91$1,784
May 2010630571.124.24$1,718
Apr 2010530981.694.12$1,682
Mar 2010530178.394.39$1,713
Feb 2010528173.585.44$1,897
Jan 2010630774.365.96$2,277
Dec 2009532771.445.48$2,150
Nov 2009436074.593.75$1,649
Oct 2009424172.544.11$1,281
Sep 2009639765.543.06$1,610
Aug 2009741267.423.22$1,798
Jul 2009743561.133.46$1,935
Jun 2009842466.163.90$2,181
May 2009743854.743.93$2,103
Apr 2009841146.773.59$1,849
Mar 2009845442.144.06$2,180
Feb 2009840432.814.63$2,134
Jan 2009937135.865.37$2,315
Dec 20081247037.105.98$3,254
Nov 20081049655.496.86$3,958
Oct 20081054975.246.92$4,553
Sep 20088449101.767.88$4,351
Aug 200813573114.228.48$6,346
Jul 200811625131.0811.39$8,560
Jun 200813602131.3313.03$9,553
May 200818696123.1711.57$10,273
Apr 200819729110.3110.45$9,717
Mar 200833972101.909.66$12,756
Feb 2008201,58992.538.77$15,787
Jan 2008756690.388.21$5,277

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   12 Mcf  × $  3.05 =        $37

────────────────────────────────────────────────────
Month total                                      $37

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/239653 is the state's own key, not one this site invented.