SIMMONS 71

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 240301District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
Feb 2008 – May 2026
Value, last 12 filed months
$22 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-12-05186531
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition357 bbl$27,819
GasProduction293,995 Mcf$1,556,940
Total$1,584,759

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6610, -100.7666. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66104, -100.76661 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,025 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,025 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-43538766128,025 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 20260424106.413.05$1,291
Apr 2026031398.932.87$898
Mar 2026049989.753.15$1,572
Feb 2026045663.503.75$1,710
Jan 2026050659.138.00$4,047
Dec 2025049456.664.41$2,180
Nov 2025050658.593.93$1,987
Oct 2025049159.383.30$1,623
Sep 2025049962.743.08$1,535
Aug 2025053063.933.01$1,598
Jul 2025054066.743.32$1,790
Jun 2025051566.483.13$1,611
May 2025051960.553.23$1,678
Apr 2025049662.363.54$1,757
Mar 2025052667.704.27$2,245
Feb 2025054970.884.34$2,383
Jan 2025033174.324.28$1,416
Dec 2024049568.993.12$1,545
Nov 2024049269.052.20$1,082
Oct 2024052071.372.28$1,186
Sep 2024050669.612.36$1,196
Aug 2024053575.632.06$1,104
Jul 2024052679.932.15$1,129
Jun 2024051878.082.63$1,364
May 2024053778.812.20$1,181
Apr 2024051684.451.66$856
Mar 2024052880.301.55$816
Feb 2024050876.091.78$906
Jan 2024053573.023.30$1,764
Dec 2023054071.262.61$1,410
Nov 2023052677.892.81$1,477
Oct 2023054985.443.09$1,695
Sep 2023054889.042.74$1,499
Aug 2023057480.522.67$1,534
Jul 2023058174.852.64$1,535
Jun 2023056468.962.26$1,274
May 2023058670.622.23$1,305
Apr 2023059078.122.24$1,320
Mar 2023385772.852.39$2,269
Feb 202302375.112.47$57
Jan 2023554476.533.39$2,226
Dec 2022054576.415.73$3,122
Nov 2022053785.005.65$3,032
Oct 2022454787.185.86$3,556
Sep 2022053884.888.16$4,392
Aug 2022056794.529.13$5,175
Jul 20222571101.587.54$4,510
Jun 20220566115.097.98$4,515
May 20220581109.378.43$4,900
Apr 20220578104.226.84$3,952
Mar 20220603108.885.08$3,061
Feb 2022054991.054.86$2,668
Jan 2022061381.844.54$2,782
Dec 2021072371.323.90$2,819
Nov 2021059377.435.24$3,105
Oct 2021063179.795.71$3,605
Sep 2021061869.865.35$3,307
Aug 2021064166.024.22$2,705
Jul 2021064770.783.98$2,576
Jun 2021064569.493.38$2,181
May 2021059263.483.02$1,786
Apr 2021067860.362.76$1,870
Mar 2021160561.302.72$1,705
Feb 2021037657.805.55$2,086
Jan 2021042050.412.81$1,180
Dec 2020154944.642.68$1,513
Nov 2020353338.772.71$1,559
Oct 2020058036.972.48$1,437
Sep 2020061337.091.99$1,221
Aug 2020462939.982.39$1,660
Jul 2020062838.371.83$1,146
Jun 2020260534.901.69$1,092
May 2020055416.921.81$1,005
Apr 2020053314.751.80$962
Mar 2020157430.341.86$1,096
Feb 2020055449.881.98$1,097
Jan 2020059257.252.09$1,240
Dec 2019058759.012.30$1,353
Nov 2019057555.302.75$1,582
Oct 2019068853.472.42$1,664
Sep 2019081655.052.66$2,168
Aug 2019072253.112.30$1,664
Jul 2019073956.272.46$1,818
Jun 2019068752.782.49$1,711
May 2019170158.482.74$1,979
Apr 2019467562.632.75$2,107
Mar 2019068356.803.06$2,091
Feb 2019059950.852.79$1,673
Jan 2019660946.033.23$2,242
Dec 2018062846.594.19$2,628
Nov 2018062952.934.24$2,665
Oct 2018069561.443.40$2,362
Sep 2018066759.543.11$2,073
Aug 2018070159.403.07$2,150
Jul 2018073265.142.93$2,146
Jun 2018070160.183.08$2,157
May 2018072465.382.90$2,100
Apr 2018170963.842.90$2,121
Mar 2018169861.222.79$2,006
Feb 2018057661.782.77$1,593
Jan 2018058262.874.01$2,333
Dec 2017066257.272.92$1,934
Nov 2017069755.423.12$2,174
Oct 2017073649.292.98$2,196
Sep 2017072847.523.09$2,248
Aug 2017176645.373.00$2,347
Jul 2017078043.873.09$2,408
Jun 2017076642.493.09$2,365
May 2017077745.373.26$2,536
Apr 2017075547.933.21$2,425
Mar 2017079446.772.98$2,369
Feb 2017169550.452.95$2,103
Jan 2017074149.413.42$2,533
Dec 2016076048.763.72$2,829
Nov 2016181142.492.64$2,187
Oct 2016188146.193.09$2,769
Sep 2016085641.553.10$2,654
Aug 2016084941.442.92$2,483
Jul 2016170141.622.92$2,092
Jun 2016064745.352.69$1,738
May 2016176742.521.99$1,570
Apr 2016176136.561.99$1,552
Mar 2016173133.011.79$1,344
Feb 2016165826.472.06$1,384
Jan 2016074627.352.36$1,764
Dec 2015175532.362.00$1,543
Nov 2015078238.792.17$1,695
Oct 2015180043.552.43$1,985
Sep 2015077142.992.76$2,127
Aug 2015280240.162.87$2,384
Jul 2015087048.152.95$2,562
Jun 2015285456.152.88$2,574
May 2015089655.212.96$2,648
Apr 2015485649.822.71$2,516
Mar 2015490242.892.93$2,819
Feb 2015281644.662.98$2,518
Jan 2015291043.433.10$2,908
Dec 2014291354.693.59$3,388
Nov 2014091670.464.25$3,895
Oct 2014294178.303.90$3,827
Sep 2014392386.164.05$3,992
Aug 2014194289.394.04$3,890
Jul 2014299896.564.18$4,364
Jun 2014098598.164.74$4,666
May 201421,03994.734.73$5,100
Apr 201401,03395.944.81$4,968
Mar 201421,02095.895.06$5,350
Feb 2014293197.406.19$5,960
Jan 201421,03890.404.86$5,226
Dec 201321,04791.824.35$4,743
Nov 201301,04788.853.74$3,914
Oct 201321,15697.423.78$4,564
Sep 201301,151104.113.72$4,279
Aug 201301,212104.253.52$4,269
Jul 201301,173102.523.72$4,361
Jun 201321,13194.403.93$4,637
May 201321,25094.834.15$5,376
Apr 201301,19893.964.28$5,131
Mar 201321,22293.623.91$4,969
Feb 201321,13191.233.42$4,050
Jan 201301,23091.603.42$4,206
Dec 201221,26686.773.42$4,503
Nov 201221,26986.953.62$4,774
Oct 201221,36689.383.40$4,823
Sep 201201,30694.672.92$3,811
Aug 201201,40192.662.91$4,074
Jul 201221,41785.133.02$4,451
Jun 201201,32679.822.52$3,340
May 201221,50991.612.49$3,938
Apr 201221,343101.652.00$2,885
Mar 201221,416105.052.22$3,357
Feb 201221,333101.102.57$3,628
Jan 201221,51598.092.73$4,338
Dec 201101,55496.873.24$5,035
Nov 201141,55495.723.31$5,529
Oct 201121,66184.983.65$6,230
Sep 201121,68183.623.99$6,867
Aug 201101,79383.404.15$7,440
Jul 201101,82894.144.52$8,258
Jun 201101,86592.904.64$8,653
May 201122,02298.134.40$9,103
Apr 201121,990105.964.33$8,835
Mar 201122,26696.364.06$9,387
Feb 201121,07685.644.18$4,669
Jan 201142,05886.504.59$9,790
Dec 201072,08985.734.35$9,683
Nov 201022,04580.843.80$7,923
Oct 201042,14178.103.51$7,825
Sep 201042,11972.633.98$8,723
Aug 201002,21973.684.42$9,807
Jul 201022,26272.554.74$10,859
Jun 201042,25070.364.91$11,330
May 201042,37071.124.24$10,322
Apr 201042,12981.694.12$9,104
Mar 201072,42378.394.39$11,182
Feb 201052,30373.585.44$12,902
Jan 201032,69874.365.96$16,314
Dec 200992,68171.445.48$15,345
Nov 200982,74774.593.75$10,902
Oct 200932,94972.544.11$12,339
Sep 200932,95565.543.06$9,253
Aug 200933,16567.423.22$10,389
Jul 200933,27761.133.46$11,537
Jun 200933,26366.163.90$12,908
May 200953,56654.743.93$14,273
Apr 200983,34646.773.59$12,378
Mar 200973,61042.144.06$14,948
Feb 200973,46032.814.63$16,260
Jan 200954,01335.865.37$21,733
Dec 2008114,37037.105.98$26,528
Nov 200894,61055.496.86$32,126
Oct 2008115,39975.246.92$38,199
Sep 200844,643101.767.88$36,980
Aug 200885,949114.228.48$51,379
Jul 200846,654131.0811.39$76,310
Jun 2008117,340131.3313.03$97,104
May 200879,252123.1711.57$107,948
Apr 20082611,037110.3110.45$118,258
Mar 20081614,296101.909.66$139,788
Feb 200864,92192.538.77$43,715

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  424 Mcf  × $  3.05 =     $1,291

────────────────────────────────────────────────────
Month total                                   $1,291

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/240301 is the state's own key, not one this site invented.