HILL-MAYER, EDWIN S. JR. "Z"

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 240966District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Apr 2008 – May 2026
Value, last 12 filed months
$32 k
at the published price for each month
Months reported
218
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-12-05184525
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition342 bbl$24,806
GasProduction388,239 Mcf$1,876,022
Total$1,900,828

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6408, -100.7996. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.64076, -100.79964 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,925 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,925 ft.

Completions filed
Apr 2008
1 of 1 wells

1 well

42-4353890377,925 ftApr 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (218)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

218 months

May 20260749106.413.05$2,281
Apr 2026074998.932.87$2,149
Mar 2026031289.753.15$983
Feb 2026161563.503.75$2,370
Jan 2026068759.138.00$5,495
Dec 2025064556.664.41$2,847
Nov 2025071658.593.93$2,811
Oct 2025075259.383.30$2,485
Sep 2025075162.743.08$2,311
Aug 2025070763.933.01$2,131
Jul 2025064566.743.32$2,138
Jun 202511,19666.483.13$3,808
May 202501060.553.23$32
Apr 2025063162.363.54$2,236
Mar 2025042267.704.27$1,801
Feb 2025057570.884.34$2,496
Jan 2025074074.324.28$3,166
Dec 2024091668.993.12$2,859
Nov 2024129869.052.20$724
Oct 2024063971.372.28$1,458
Sep 2024261969.612.36$1,603
Aug 2024061675.632.06$1,271
Jul 2024045679.932.15$979
Jun 2024043778.082.63$1,151
May 2024044078.812.20$967
Apr 2024045184.451.66$748
Mar 2024048980.301.55$756
Feb 2024044176.091.78$787
Jan 2024358973.023.30$2,161
Dec 2023065971.262.61$1,720
Nov 2023249577.892.81$1,546
Oct 2023249285.443.09$1,690
Sep 2023155689.042.74$1,610
Aug 20231555080.522.67$2,678
Jul 2023169274.852.64$1,903
Jun 2023466068.962.26$1,766
May 2023083070.622.23$1,849
Apr 2023483378.122.24$2,177
Mar 2023285472.852.39$2,189
Feb 2023180575.112.47$2,060
Jan 2023488476.533.39$3,301
Dec 20221169476.415.73$4,816
Nov 2022773085.005.65$4,717
Oct 2022184287.185.86$5,024
Sep 2022883684.888.16$7,504
Aug 2022086094.529.13$7,849
Jul 20220892101.587.54$6,728
Jun 202228848115.097.98$9,987
May 202216879109.378.43$9,163
Apr 202221861104.226.84$8,076
Mar 20220882108.885.08$4,477
Feb 2022583091.054.86$4,488
Jan 2022093581.844.54$4,243
Dec 2021695771.323.90$4,159
Nov 2021882477.435.24$4,935
Oct 20211298879.795.71$6,603
Sep 2021096669.865.35$5,169
Aug 2021101,04566.024.22$5,071
Jul 202181,01170.783.98$4,592
Jun 2021085769.493.38$2,897
May 202191,20263.483.02$4,199
Apr 2021441760.362.76$1,392
Mar 2021173061.302.72$2,045
Feb 2021071557.805.55$3,967
Jan 2021087850.412.81$2,467
Dec 2020085044.642.68$2,274
Nov 2020080938.772.71$2,190
Oct 2020087436.972.48$2,166
Sep 2020082037.091.99$1,633
Aug 2020097839.982.39$2,333
Jul 2020067338.371.83$1,228
Jun 2020077034.901.69$1,302
May 2020066316.921.81$1,203
Apr 2020058214.751.80$1,050
Mar 2020179630.341.86$1,508
Feb 2020174749.881.98$1,529
Jan 2020175957.252.09$1,647
Dec 2019270159.012.30$1,733
Nov 2019267155.302.75$1,956
Oct 2019273653.472.42$1,887
Sep 2019079555.052.66$2,113
Aug 2019083453.112.30$1,922
Jul 2019084756.272.46$2,084
Jun 2019078452.782.49$1,953
May 2019057658.482.74$1,578
Apr 201901,06262.632.75$2,921
Mar 2019062156.803.06$1,902
Feb 2019069650.852.79$1,943
Jan 2019077046.033.23$2,486
Dec 2018071646.594.19$2,997
Nov 2018082352.934.24$3,487
Oct 2018098861.443.40$3,357
Sep 201811,17359.543.11$3,705
Aug 201811,28259.403.07$3,991
Jul 201801,35465.142.93$3,970
Jun 201821,33560.183.08$4,228
May 201811,35165.382.90$3,984
Apr 201811,36563.842.90$4,023
Mar 201811,48261.222.79$4,191
Feb 201811,46061.782.77$4,100
Jan 201811,32662.874.01$5,379
Dec 2017149157.272.92$1,492
Nov 2017248555.423.12$1,623
Oct 2017062549.292.98$1,865
Sep 2017285047.523.09$2,719
Aug 2017387145.373.00$2,753
Jul 2017395443.873.09$3,077
Jun 201701,00042.493.09$3,087
May 2017399845.373.26$3,393
Apr 201731,04747.933.21$3,506
Mar 201731,13646.772.98$3,530
Feb 201741,11650.452.95$3,497
Jan 201731,25249.413.42$4,429
Dec 201651,27048.763.72$4,972
Nov 201641,20742.492.64$3,362
Oct 201641,25946.193.09$4,075
Sep 201661,19441.553.10$3,951
Aug 201631,20741.442.92$3,654
Jul 201631,26941.622.92$3,836
Jun 201631,22445.352.69$3,424
May 201631,16242.521.99$2,441
Apr 201641,20636.561.99$2,547
Mar 201631,25833.011.79$2,356
Feb 201631,24526.472.06$2,649
Jan 201631,40827.352.36$3,411
Dec 201561,47132.362.00$3,138
Nov 2015096738.792.17$2,096
Oct 201571,02143.552.43$2,782
Sep 201571,42042.992.76$4,218
Aug 201511,43940.162.87$4,174
Jul 201551,58448.152.95$4,906
Jun 201501,46756.152.88$4,229
May 201531,62455.212.96$4,965
Apr 201501,50149.822.71$4,063
Mar 201541,69142.892.93$5,134
Feb 201501,42144.662.98$4,229
Jan 201501,57743.433.10$4,890
Dec 201411,61754.693.59$5,862
Nov 201401,49170.464.25$6,339
Oct 201401,70378.303.90$6,643
Sep 201401,66886.164.05$6,748
Aug 201411,76889.394.04$7,223
Jul 201401,84496.564.18$7,707
Jun 201401,55698.164.74$7,371
May 201401,85494.734.73$8,763
Apr 201421,75095.944.81$8,608
Mar 201401,83095.895.06$9,254
Feb 201401,66497.406.19$10,303
Jan 201401,83190.404.86$8,900
Dec 201301,82591.824.35$7,947
Nov 201321,87688.853.74$7,191
Oct 201302,06497.423.78$7,801
Sep 201302,034104.113.72$7,562
Aug 201312,052104.253.52$7,333
Jul 201332,012102.523.72$7,788
Jun 201301,98694.403.93$7,812
May 201302,06994.834.15$8,584
Apr 201302,09393.964.28$8,963
Mar 201302,24093.623.91$8,765
Feb 201302,05191.233.42$7,014
Jan 201322,17891.603.42$7,632
Dec 201202,17086.773.42$7,422
Nov 201202,12186.953.62$7,689
Oct 201212,20989.383.40$7,599
Sep 201202,14594.672.92$6,260
Aug 201202,39792.662.91$6,971
Jul 201202,48585.133.02$7,507
Jun 201202,46679.822.52$6,212
May 201202,68391.612.49$6,676
Apr 201202,469101.652.00$4,930
Mar 201202,587105.052.22$5,749
Feb 201202,563101.102.57$6,588
Jan 201202,88698.092.73$7,891
Dec 201102,91896.873.24$9,454
Nov 201102,78295.723.31$9,212
Oct 201102,84684.983.65$10,384
Sep 201102,81383.623.99$11,212
Aug 201103,52683.404.15$14,631
Jul 201102,60594.144.52$11,767
Jun 201113,22392.904.64$15,047
May 201123,41498.134.40$15,234
Apr 201133,660105.964.33$16,178
Mar 201123,74996.364.06$15,404
Feb 201101,84585.644.18$7,712
Jan 201102,44286.504.59$11,206
Dec 201002,34485.734.35$10,191
Nov 201002,41580.843.80$9,166
Oct 201002,59078.103.51$9,088
Sep 201002,31272.633.98$9,201
Aug 201002,99073.684.42$13,214
Jul 201002,88272.554.74$13,651
Jun 201002,86170.364.91$14,049
May 201002,86171.124.24$12,117
Apr 201003,04081.694.12$12,533
Mar 201003,14778.394.39$13,811
Feb 201002,91873.585.44$15,881
Jan 201003,16474.365.96$18,870
Dec 200903,32871.445.48$18,250
Nov 200903,34874.593.75$12,560
Oct 200903,12472.544.11$12,840
Sep 200903,38565.543.06$10,374
Aug 200904,04167.423.22$13,006
Jul 200903,91661.133.46$13,567
Jun 200904,02066.163.90$15,658
May 200904,55154.743.93$17,866
Apr 200904,56046.773.59$16,359
Mar 200904,92442.144.06$19,987
Feb 200904,66132.814.63$21,594
Jan 200905,15035.865.37$27,661
Dec 200805,70937.105.98$34,123
Nov 200805,95455.496.86$40,847
Oct 200806,78075.246.92$46,931
Sep 200807,302101.767.88$57,519
Aug 200808,338114.228.48$70,731
Jul 200809,203131.0811.39$104,817
Jun 2008010,278131.3313.03$133,949
May 2008012,258123.1711.57$141,878
Apr 200807,557110.3110.45$79,007

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  749 Mcf  × $  3.05 =     $2,281

────────────────────────────────────────────────────
Month total                                   $2,281

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/240966 is the state's own key, not one this site invented.