STEWART

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 241256District 7CField 812673332 tax incentive programmesGasSaveExport
Value, all time
$364 k
May 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
217
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-12-05184627
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction54,997 Mcf$363,690
Total$363,690

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3086, -100.3126. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.30855, -100.31258 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,536 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,536 ft.

Completions filed
May 2008
1 of 1 wells

1 well

42-435389543095,536 ftMay 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (217)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

217 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019155.052.66$3
Aug 2019253.112.30$5
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018152.934.24$4
Oct 2018161.443.40$3
Sep 2018159.543.11$3
Aug 2018159.403.07$3
Jul 2018265.142.93$6
Jun 2018260.183.08$6
May 2018165.382.90$3
Apr 2018263.842.90$6
Mar 2018261.222.79$6
Feb 2018461.782.77$11
Jan 2018262.874.01$8
Dec 2017357.272.92$9
Nov 2017355.423.12$9
Oct 2017249.292.98$6
Sep 2017247.523.09$6
Aug 2017145.373.00$3
Jul 2017143.873.09$3
Jun 2017342.493.09$9
May 2017345.373.26$10
Apr 2017247.933.21$6
Mar 2017146.772.98$3
Feb 2017350.452.95$9
Jan 2017349.413.42$10
Dec 2016248.763.72$7
Nov 2016342.492.64$8
Oct 2016346.193.09$9
Sep 2016341.553.10$9
Aug 2016341.442.92$9
Jul 2016341.622.92$9
Jun 2016345.352.69$8
May 2016342.521.99$6
Apr 2016336.561.99$6
Mar 2016233.011.79$4
Feb 2016226.472.06$4
Jan 2016327.352.36$7
Dec 2015232.362.00$4
Nov 2015338.792.17$7
Oct 2015443.552.43$10
Sep 2015342.992.76$8
Aug 2015340.162.87$9
Jul 2015348.152.95$9
Jun 2015456.152.88$12
May 2015555.212.96$15
Apr 2015449.822.71$11
Mar 2015342.892.93$9
Feb 2015544.662.98$15
Jan 2015343.433.10$9
Dec 2014454.693.59$14
Nov 2014370.464.25$13
Oct 2014078.303.90$0
Sep 2014186.164.05$4
Aug 2014189.394.04$4
Jul 2014196.564.18$4
Jun 2014398.164.74$14
May 2014594.734.73$24
Apr 2014595.944.81$24
Mar 2014695.895.06$30
Feb 2014597.406.19$31
Jan 2014590.404.86$24
Dec 2013891.824.35$35
Nov 2013988.853.74$34
Oct 2013497.423.78$15
Sep 20131104.113.72$4
Aug 20133104.253.52$11
Jul 20134102.523.72$15
Jun 2013194.403.93$4
May 201315094.834.15$622
Apr 20138893.964.28$377
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 2012092.662.91$0
Jul 2012285.133.02$6
Jun 2012579.822.52$13
May 20121091.612.49$25
Apr 201218101.652.00$36
Mar 201232105.052.22$71
Feb 201260101.102.57$154
Jan 201216198.092.73$440
Dec 201125196.873.24$813
Nov 201126495.723.31$874
Oct 201130184.983.65$1,098
Sep 201127283.623.99$1,084
Aug 201133683.404.15$1,394
Jul 201149094.144.52$2,213
Jun 201146092.904.64$2,134
May 201147798.134.40$2,101
Apr 2011445105.964.33$1,928
Mar 201149896.364.06$2,021
Feb 201134485.644.18$1,438
Jan 201148586.504.59$2,226
Dec 201052285.734.35$2,270
Nov 201054580.843.80$2,068
Oct 201061378.103.51$2,151
Sep 201065972.633.98$2,622
Aug 201080973.684.42$3,575
Jul 201078672.554.74$3,723
Jun 201074270.364.91$3,644
May 201082971.124.24$3,511
Apr 201057381.694.12$2,362
Mar 201090378.394.39$3,963
Feb 201091873.585.44$4,996
Jan 20101,08374.365.96$6,459
Dec 20091,21771.445.48$6,674
Nov 20091,35774.593.75$5,091
Oct 20091,03172.544.11$4,238
Sep 20091,65365.543.06$5,066
Aug 20092,07367.423.22$6,672
Jul 20091,48561.133.46$5,145
Jun 20091,73666.163.90$6,762
May 20092,42754.743.93$9,528
Apr 20095,02446.773.59$18,024
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009235.865.37$11
Dec 200831237.105.98$1,865
Nov 20081,41455.496.86$9,701
Oct 20082,14475.246.92$14,841
Sep 20082,823101.767.88$22,237
Aug 20083,426114.228.48$29,063
Jul 20083,764131.0811.39$42,870
Jun 20087,649131.3313.03$99,687
May 20081,136123.1711.57$13,148

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2019 — as filed, then multipliedworked
Gas                    1 Mcf  × $  2.66 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/241256 is the state's own key, not one this site invented.