Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 242259District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$372 k
Oct 2008 – May 2026
Value, last 12 filed months
$39 k
at the published price for each month
Months reported
212
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-12-05187133
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,150 bbl$82,743
GasProduction75,834 Mcf$289,756
Total$372,499

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4683, -100.6933. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46829, -100.69334 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,679 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,679 ft.

Completions filed
Oct 2008
1 of 1 wells

1 well

42-43539041286,679 ftOct 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (212)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

212 months

May 2026010106.413.05$30
Apr 202606098.932.87$172
Mar 20267630889.753.15$7,791
Feb 20267327063.503.75$5,648
Jan 2026031859.138.00$2,543
Dec 20256833856.664.41$5,345
Nov 20256433058.593.93$5,045
Oct 20255835659.383.30$4,621
Sep 2025035162.743.08$1,080
Aug 20252840163.933.01$2,999
Jul 2025027166.743.32$898
Jun 20252823766.483.13$2,603
May 20253528160.553.23$3,028
Apr 20252932862.363.54$2,971
Mar 2025033067.704.27$1,409
Feb 20252431170.884.34$3,051
Jan 20252128074.324.28$2,759
Dec 20241223868.993.12$1,571
Nov 20241515469.052.20$1,374
Oct 2024017371.372.28$395
Sep 20241518169.612.36$1,472
Aug 20241619975.632.06$1,621
Jul 2024020979.932.15$449
Jun 20241820978.082.63$1,956
May 20241521978.812.20$1,664
Apr 20242121684.451.66$2,132
Mar 20242322180.301.55$2,188
Feb 20244421276.091.78$3,726
Jan 2024024473.023.30$805
Dec 20234128771.262.61$3,671
Nov 20231529177.892.81$1,985
Oct 2023028585.443.09$880
Sep 20231332789.042.74$2,052
Aug 20233634480.522.67$3,818
Jul 20231532374.852.64$1,976
Jun 2023434168.962.26$1,046
May 2023434270.622.23$1,044
Apr 2023433678.122.24$1,064
Mar 2023935272.852.39$1,498
Feb 2023031275.112.47$769
Jan 20231036676.533.39$2,005
Dec 2022635176.415.73$2,469
Nov 2022736285.005.65$2,639
Oct 20221039087.185.86$3,159
Sep 20221838284.888.16$4,646
Aug 2022040894.529.13$3,724
Jul 20223399101.587.54$3,314
Jun 20222376115.097.98$3,230
May 20222392109.378.43$3,524
Apr 20221388104.226.84$2,757
Mar 20220409108.885.08$2,076
Feb 2022034391.054.86$1,667
Jan 2022038881.844.54$1,761
Dec 2021039371.323.90$1,532
Nov 2021040077.435.24$2,095
Oct 2021044379.795.71$2,531
Sep 2021047969.865.35$2,563
Aug 2021034466.024.22$1,452
Jul 2021028270.783.98$1,123
Jun 2021028769.493.38$970
May 2021030163.483.02$908
Apr 2021030360.362.76$836
Mar 2021034461.302.72$935
Feb 2021026657.805.55$1,476
Jan 2021034650.412.81$972
Dec 2020036044.642.68$963
Nov 2020037638.772.71$1,018
Oct 2020041236.972.48$1,021
Sep 2020034037.091.99$677
Aug 2020041539.982.39$990
Jul 2020037538.371.83$684
Jun 2020037734.901.69$637
May 2020037716.921.81$684
Apr 2020034614.751.80$624
Mar 2020031330.341.86$581
Feb 2020030949.881.98$612
Jan 2020031857.252.09$666
Dec 2019031459.012.30$724
Nov 2019029955.302.75$822
Oct 2019032253.472.42$779
Sep 2019032055.052.66$850
Aug 2019034053.112.30$783
Jul 2019034656.272.46$851
Jun 2019033352.782.49$830
May 2019032458.482.74$888
Apr 2019028662.632.75$787
Mar 2019030156.803.06$922
Feb 2019030750.852.79$857
Jan 2019028546.033.23$920
Dec 2018030546.594.19$1,277
Nov 2018128952.934.24$1,277
Oct 2018030161.443.40$1,023
Sep 2018031059.543.11$963
Aug 2018034959.403.07$1,070
Jul 2018135765.142.93$1,112
Jun 2018035460.183.08$1,089
May 2018034065.382.90$986
Apr 2018133863.842.90$1,044
Mar 2018135661.222.79$1,053
Feb 2018032961.782.77$910
Jan 2018234562.874.01$1,509
Dec 2017134957.272.92$1,077
Nov 2017134755.423.12$1,137
Oct 2017435949.292.98$1,268
Sep 2017341247.523.09$1,415
Aug 2017543645.373.00$1,537
Jul 201707343.873.09$225
Jun 201707842.493.09$241
May 201707845.373.26$255
Apr 201707247.933.21$231
Mar 201706846.772.98$203
Feb 201705750.452.95$168
Jan 201706649.413.42$226
Dec 201607448.763.72$275
Nov 201606042.492.64$159
Oct 201606246.193.09$192
Sep 201605841.553.10$180
Aug 201606841.442.92$199
Jul 201607641.622.92$222
Jun 201606645.352.69$177
May 201605942.521.99$117
Apr 201605836.561.99$115
Mar 201606333.011.79$113
Feb 201605926.472.06$122
Jan 201616427.352.36$179
Dec 201507432.362.00$148
Nov 201507438.792.17$160
Oct 201517743.552.43$230
Sep 201517542.992.76$250
Aug 201508640.162.87$247
Jul 201519348.152.95$322
Jun 201507656.152.88$219
May 201504055.212.96$118
Apr 201507149.822.71$192
Mar 201518042.892.93$278
Feb 201506344.662.98$188
Jan 201517443.433.10$273
Dec 201418354.693.59$353
Nov 201408870.464.25$374
Oct 201419378.303.90$441
Sep 201407886.164.05$316
Aug 201407689.394.04$307
Jul 201408896.564.18$368
Jun 201409398.164.74$441
May 2014110094.734.73$567
Apr 201419895.944.81$567
Mar 201419095.895.06$551
Feb 201419897.406.19$704
Jan 2014110890.404.86$615
Dec 2013110991.824.35$566
Nov 2013111288.853.74$508
Oct 2013112197.423.78$555
Sep 20131122104.113.72$558
Aug 20131139104.253.52$594
Jul 20131152102.523.72$668
Jun 2013216494.403.93$834
May 2013119494.834.15$900
Apr 2013321593.964.28$1,203
Mar 2013126193.623.91$1,115
Feb 2013327491.233.42$1,211
Jan 2013332791.603.42$1,393
Dec 2012339986.773.42$1,625
Nov 2012545386.953.62$2,077
Oct 2012250189.383.40$1,882
Sep 2012548694.672.92$1,892
Aug 2012150592.662.91$1,561
Jul 2012350785.133.02$1,787
Jun 2012347379.822.52$1,431
May 2012251491.612.49$1,462
Apr 20124525101.652.00$1,455
Mar 20124603105.052.22$1,760
Feb 20122577101.102.57$1,685
Jan 2012460198.092.73$2,036
Dec 2011357896.873.24$2,163
Nov 2011455695.723.31$2,224
Oct 2011355184.983.65$2,265
Sep 2011251683.623.99$2,224
Aug 2011352683.404.15$2,433
Jul 2011355894.144.52$2,803
Jun 2011357292.904.64$2,933
May 2011462898.134.40$3,159
Apr 20114627105.964.33$3,141
Mar 2011569796.364.06$3,310
Feb 2011462485.644.18$2,951
Jan 2011671886.504.59$3,814
Dec 2010674185.734.35$3,736
Nov 2010569380.843.80$3,034
Oct 2010479778.103.51$3,109
Sep 2010577172.633.98$3,431
Aug 2010482073.684.42$3,919
Jul 2010589072.554.74$4,578
Jun 2010591470.364.91$4,840
May 2010795671.124.24$4,547
Apr 2010795481.694.12$4,505
Mar 201071,04878.394.39$5,148
Feb 2010699373.585.44$5,846
Jan 201071,12574.365.96$7,230
Dec 2009495171.445.48$5,501
Nov 2009243174.593.75$1,766
Oct 20090072.544.11$0
Sep 20091065.543.06$66
Aug 2009444167.423.22$1,689
Jul 200951,23661.133.46$4,588
Jun 2009496266.163.90$4,012
May 200981,11354.743.93$4,807
Apr 2009111,59946.773.59$6,251
Mar 2009101,71042.144.06$7,362
Feb 200982,13032.814.63$10,131
Jan 2009499335.865.37$5,477
Dec 2008125737.105.98$1,573
Nov 200811755.496.86$172
Oct 2008266475.246.92$4,747

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   10 Mcf  × $  3.05 =        $30

────────────────────────────────────────────────────
Month total                                      $30

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/242259 is the state's own key, not one this site invented.