SHURLEY 165

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 243907District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Aug 2007 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-02-18179868
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition687 bbl$56,603
GasProduction198,998 Mcf$1,162,767
Total$1,219,370

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4562, -100.7459. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45620, -100.74592 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,750 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,750 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-43538472178,750 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 202600106.413.05$0
Apr 202605198.932.87$146
Mar 202607489.753.15$233
Feb 2026013663.503.75$510
Jan 2026014859.138.00$1,184
Dec 202508256.664.41$362
Nov 2025011358.593.93$444
Oct 2025013259.383.30$436
Sep 202508262.743.08$252
Aug 2025013163.933.01$395
Jul 2025017066.743.32$564
Jun 2025016466.483.13$513
May 2025013660.553.23$440
Apr 2025014462.363.54$510
Mar 2025019467.704.27$828
Feb 2025014170.884.34$612
Jan 2025019174.324.28$817
Dec 2024020568.993.12$640
Nov 2024020269.052.20$444
Oct 2024018671.372.28$424
Sep 2024017469.612.36$411
Aug 2024022175.632.06$456
Jul 2024022879.932.15$489
Jun 2024022078.082.63$579
May 2024018778.812.20$411
Apr 2024019784.451.66$327
Mar 2024021180.301.55$326
Feb 2024020376.091.78$362
Jan 2024025973.023.30$854
Dec 2023020671.262.61$538
Nov 2023025877.892.81$724
Oct 2023025085.443.09$772
Sep 2023025289.042.74$689
Aug 2023024880.522.67$663
Jul 2023024874.852.64$655
Jun 2023028168.962.26$635
May 2023029770.622.23$662
Apr 2023032178.122.24$718
Mar 2023031572.852.39$754
Feb 2023029075.112.47$715
Jan 2023035976.533.39$1,216
Dec 2022037276.415.73$2,131
Nov 2022040185.005.65$2,264
Oct 2022034787.185.86$2,035
Sep 2022038784.888.16$3,159
Aug 2022045094.529.13$4,107
Jul 20220408101.587.54$3,077
Jun 20220487115.097.98$3,885
May 20220540109.378.43$4,554
Apr 20220493104.226.84$3,371
Mar 20220615108.885.08$3,122
Feb 2022053291.054.86$2,585
Jan 2022066381.844.54$3,008
Dec 2021056471.323.90$2,199
Nov 2021057377.435.24$3,001
Oct 2021074379.795.71$4,245
Sep 2021015869.865.35$845
Aug 20210466.024.22$17
Jul 20210470.783.98$16
Jun 20210869.493.38$27
May 20210263.483.02$6
Apr 20210260.362.76$6
Mar 20210261.302.72$5
Feb 202101757.805.55$94
Jan 20210450.412.81$11
Dec 20200444.642.68$11
Nov 20200238.772.71$5
Oct 202009936.972.48$245
Sep 20200537.091.99$10
Aug 20200439.982.39$10
Jul 20200338.371.83$5
Jun 20200234.901.69$3
May 2020033416.921.81$606
Apr 20200714.751.80$13
Mar 202006030.341.86$111
Feb 20200049.881.98$0
Jan 20200357.252.09$6
Dec 20190659.012.30$14
Nov 201906355.302.75$173
Oct 20190753.472.42$17
Sep 20190455.052.66$11
Aug 20190353.112.30$7
Jul 20190856.272.46$20
Jun 20190352.782.49$7
May 20190558.482.74$14
Apr 20190262.632.75$6
Mar 20190956.803.06$28
Feb 20190350.852.79$8
Jan 20190646.033.23$19
Dec 20180546.594.19$21
Nov 2018010752.934.24$453
Oct 2018029061.443.40$985
Sep 2018030259.543.11$939
Aug 2018035059.403.07$1,073
Jul 2018033565.142.93$982
Jun 2018033660.183.08$1,034
May 2018034365.382.90$995
Apr 2018032263.842.90$934
Mar 2018034361.222.79$956
Feb 2018040061.782.77$1,106
Jan 2018035162.874.01$1,407
Dec 2017035357.272.92$1,031
Nov 2017034255.423.12$1,066
Oct 2017036549.292.98$1,089
Sep 2017035547.523.09$1,096
Aug 2017036545.373.00$1,097
Jul 2017037243.873.09$1,148
Jun 2017035342.493.09$1,090
May 2017035745.373.26$1,165
Apr 2017035447.933.21$1,137
Mar 2017036446.772.98$1,086
Feb 2017033750.452.95$995
Jan 2017037449.413.42$1,279
Dec 2016037048.763.72$1,377
Nov 2016037142.492.64$981
Oct 2016039046.193.09$1,205
Sep 2016037741.553.10$1,169
Aug 2016039441.442.92$1,152
Jul 2016042141.622.92$1,231
Jun 2016034745.352.69$932
May 20160242.521.99$4
Apr 20160036.561.99$0
Mar 20160333.011.79$5
Feb 20160426.472.06$8
Jan 20160227.352.36$5
Dec 20150332.362.00$6
Nov 20150338.792.17$7
Oct 20151643.552.43$58
Sep 20151242.992.76$49
Aug 2015317240.162.87$615
Jul 20153248.152.95$150
Jun 20150456.152.88$12
May 201505655.212.96$166
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150244.662.98$6
Jan 20150643.433.10$19
Dec 20140054.693.59$0
Nov 20141270.464.25$79
Oct 2014414578.303.90$879
Sep 2014467786.164.05$3,083
Aug 2014370389.394.04$3,105
Jul 2014170296.564.18$3,031
Jun 2014372598.164.74$3,729
May 2014679194.734.73$4,307
Apr 2014491095.944.81$4,760
Mar 2014322195.895.06$1,405
Feb 2014773497.406.19$5,227
Jan 201421,25990.404.86$6,300
Dec 20132191.824.35$188
Nov 2013557888.853.74$2,605
Oct 2013582897.423.78$3,616
Sep 20135764104.113.72$3,361
Aug 20134752104.253.52$3,066
Jul 20132760102.523.72$3,031
Jun 2013571294.403.93$3,273
May 2013576094.834.15$3,627
Apr 2013677093.964.28$3,861
Mar 2013481993.623.91$3,579
Feb 2013570691.233.42$2,871
Jan 2013779791.603.42$3,367
Dec 2012581286.773.42$3,211
Nov 2012678086.953.62$3,349
Oct 2012381489.383.40$3,035
Sep 2012477194.672.92$2,629
Aug 2012277892.662.91$2,448
Jul 2012478585.133.02$2,712
Jun 2012476179.822.52$2,236
May 2012483591.612.49$2,444
Apr 20126852101.652.00$2,311
Mar 20126931105.052.22$2,699
Feb 20124896101.102.57$2,707
Jan 2012696798.092.73$3,232
Dec 201161,06496.873.24$4,028
Nov 201181,07195.723.31$4,312
Oct 201161,14184.983.65$4,673
Sep 201141,10883.623.99$4,751
Aug 201171,07583.404.15$5,044
Jul 201171,14894.144.52$5,845
Jun 201171,18592.904.64$6,149
May 201171,28398.134.40$6,338
Apr 201191,296105.964.33$6,570
Mar 201191,42796.364.06$6,657
Feb 2011564585.644.18$3,124
Jan 2011121,35586.504.59$7,256
Dec 2010121,40985.734.35$7,155
Nov 201091,41980.843.80$6,113
Oct 201061,32078.103.51$5,100
Sep 2010582272.633.98$3,634
Aug 2010571773.684.42$3,537
Jul 201081,14072.554.74$5,980
Jun 201081,55370.364.91$8,189
May 2010131,80071.124.24$8,548
Apr 2010131,76981.694.12$8,355
Mar 2010132,00078.394.39$9,796
Feb 2010112,00973.585.44$11,743
Jan 2010131,93674.365.96$12,513
Dec 2009102,02171.445.48$11,797
Nov 2009141,85674.593.75$8,007
Oct 200992,02272.544.11$8,964
Sep 200981,99665.543.06$6,642
Aug 2009122,15467.423.22$7,742
Jul 2009122,25861.133.46$8,556
Jun 200982,25266.163.90$9,301
May 2009162,50254.743.93$10,698
Apr 2009182,32346.773.59$9,176
Mar 2009162,75342.144.06$11,849
Feb 2009112,59532.814.63$12,384
Jan 2009192,92635.865.37$16,397
Dec 2008183,03037.105.98$18,779
Nov 2008193,20455.496.86$23,035
Oct 2008203,24075.246.92$23,932
Sep 2008182,955101.767.88$25,108
Aug 2008174,136114.228.48$37,028
Jul 2008133,076131.0811.39$36,738
Jun 2008163,589131.3313.03$48,875
May 2008254,604123.1711.57$56,367
Apr 2008184,776110.3110.45$51,918
Mar 2008125,254101.909.66$51,998
Feb 200805,49892.538.77$48,221
Jan 200807,08290.388.21$58,113
Dec 200705,86188.337.30$42,797
Nov 200707,70391.677.29$56,168
Oct 200707,29382.856.92$50,482
Sep 200708,28275.846.24$51,714
Aug 200707,93069.066.39$50,656

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                   51 Mcf  × $  2.87 =       $146

────────────────────────────────────────────────────
Month total                                     $146

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/243907 is the state's own key, not one this site invented.