POWELL 3

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 244251District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$933 k
Nov 2008 – May 2026
Value, last 12 filed months
$22 k
at the published price for each month
Months reported
211
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-02-18188130
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,363 bbl$155,769
GasProduction199,271 Mcf$776,955
Total$932,724

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.8458, -100.9033. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.84579, -100.90326 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,388 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,388 ft.

Completions filed
Nov 2008
1 of 1 wells

1 well

42-4133256128,388 ftNov 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (211)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

211 months

May 20265386106.413.05$1,708
Apr 20261132598.932.87$2,021
Mar 2026532289.753.15$1,463
Feb 2026633363.503.75$1,630
Jan 2026536459.138.00$3,207
Dec 2025535656.664.41$1,854
Nov 2025531058.593.93$1,510
Oct 2025544859.383.30$1,777
Sep 2025629362.743.08$1,278
Aug 2025645563.933.01$1,755
Jul 2025748066.743.32$2,058
Jun 2025547466.483.13$1,815
May 20251248260.553.23$2,285
Apr 2025746762.363.54$2,091
Mar 2025747767.704.27$2,510
Feb 20251343070.884.34$2,788
Jan 2025746374.324.28$2,501
Dec 20241547468.993.12$2,514
Nov 2024046669.052.20$1,024
Oct 2024649171.372.28$1,548
Sep 20241248869.612.36$1,989
Aug 2024651775.632.06$1,521
Jul 2024748779.932.15$1,605
Jun 2024748178.082.63$1,814
May 2024848978.812.20$1,706
Apr 2024948784.451.66$1,568
Mar 2024751080.301.55$1,350
Feb 2024545676.091.78$1,194
Jan 20241654373.023.30$2,959
Dec 20231035771.262.61$1,645
Nov 20231337277.892.81$2,057
Oct 2023741185.443.09$1,867
Sep 2023541489.042.74$1,578
Aug 20231143680.522.67$2,051
Jul 2023044974.852.64$1,186
Jun 2023543968.962.26$1,336
May 2023546170.622.23$1,380
Apr 2023645078.122.24$1,476
Mar 2023640272.852.39$1,399
Feb 2023539775.112.47$1,354
Jan 2023743876.533.39$2,020
Dec 2022542776.415.73$2,828
Nov 2022343885.005.65$2,728
Oct 2022946787.185.86$3,523
Sep 2022445784.888.16$4,070
Aug 2022448894.529.13$4,832
Jul 20225511101.587.54$4,362
Jun 20223496115.097.98$4,302
May 20220515109.378.43$4,343
Apr 20220474104.226.84$3,241
Mar 20220498108.885.08$2,528
Feb 2022144091.054.86$2,229
Jan 2022048881.844.54$2,214
Dec 2021049671.323.90$1,934
Nov 2021148677.435.24$2,623
Oct 2021152079.795.71$3,051
Sep 2021154669.865.35$2,991
Aug 2021262566.024.22$2,770
Jul 2021041270.783.98$1,641
Jun 2021553169.493.38$2,143
May 2021355363.483.02$1,859
Apr 2021454160.362.76$1,734
Mar 2021556161.302.72$1,831
Feb 2021047057.805.55$2,608
Jan 2021552950.412.81$1,739
Dec 2020557844.642.68$1,770
Nov 2020062538.772.71$1,692
Oct 2020072536.972.48$1,797
Sep 2020051137.091.99$1,017
Aug 2020045139.982.39$1,076
Jul 2020048838.371.83$891
Jun 2020052634.901.69$889
May 2020060016.921.81$1,089
Apr 2020019314.751.80$348
Mar 2020043330.341.86$804
Feb 2020043649.881.98$864
Jan 2020051457.252.09$1,077
Dec 2019051859.012.30$1,194
Nov 2019050955.302.75$1,400
Oct 2019045953.472.42$1,110
Sep 2019055455.052.66$1,472
Aug 2019058953.112.30$1,357
Jul 2019061256.272.46$1,506
Jun 2019060152.782.49$1,497
May 2019060758.482.74$1,663
Apr 2019056462.632.75$1,551
Mar 2019033956.803.06$1,038
Feb 2019135550.852.79$1,042
Jan 2019267946.033.23$2,284
Dec 2018168846.594.19$2,926
Nov 2018053952.934.24$2,284
Oct 2018065961.443.40$2,239
Sep 2018063059.543.11$1,958
Aug 2018065259.403.07$1,999
Jul 2018164565.142.93$1,956
Jun 2018063960.183.08$1,966
May 2018167265.382.90$2,015
Apr 2018165363.842.90$1,958
Mar 2018269661.222.79$2,062
Feb 2018163561.782.77$1,818
Jan 2018272062.874.01$3,012
Dec 2017474057.272.92$2,391
Nov 2017272155.423.12$2,359
Oct 2017572149.292.98$2,398
Sep 2017254247.523.09$1,768
Aug 2017370545.373.00$2,254
Jul 2017371143.873.09$2,327
Jun 2017367842.493.09$2,221
May 2017569945.373.26$2,508
Apr 2017468447.933.21$2,388
Mar 2017471946.772.98$2,332
Feb 2017268850.452.95$2,132
Jan 2017476849.413.42$2,823
Dec 2016676848.763.72$3,152
Nov 2016574042.492.64$2,169
Oct 2016477946.193.09$2,592
Sep 2016376841.553.10$2,506
Aug 2016378441.442.92$2,417
Jul 2016579041.622.92$2,518
Jun 2016377145.352.69$2,207
May 2016482042.521.99$1,803
Apr 2016579736.561.99$1,770
Mar 2016581233.011.79$1,622
Feb 2016375526.472.06$1,637
Jan 2016284227.352.36$2,045
Dec 2015688432.362.00$1,963
Nov 2015584238.792.17$2,019
Oct 2015585343.552.43$2,288
Sep 2015487342.992.76$2,580
Aug 2015487740.162.87$2,680
Jul 2015782748.152.95$2,773
Jun 2015582156.152.88$2,648
May 20151086755.212.96$3,114
Apr 2015582249.822.71$2,474
Mar 2015788342.892.93$2,892
Feb 2015279144.662.98$2,443
Jan 2015275743.433.10$2,434
Dec 2014675054.693.59$3,022
Nov 2014473670.464.25$3,411
Oct 2014778178.303.90$3,595
Sep 2014877686.164.05$3,829
Aug 2014779789.394.04$3,842
Jul 2014582296.564.18$3,918
Jun 2014782898.164.74$4,609
May 2014484494.734.73$4,368
Apr 2014783495.944.81$4,682
Mar 2014787795.895.06$5,106
Feb 2014279697.406.19$5,124
Jan 2014390890.404.86$4,685
Dec 2013489291.824.35$4,251
Nov 2013783688.853.74$3,747
Oct 2013789597.423.78$4,064
Sep 20136854104.113.72$3,800
Aug 20134879104.253.52$3,513
Jul 20134890102.523.72$3,719
Jun 2013488794.403.93$3,867
May 2013487894.834.15$4,022
Apr 2013689593.964.28$4,397
Mar 2013471393.623.91$3,164
Feb 2013690091.233.42$3,625
Jan 2013699391.603.42$3,946
Dec 2012897586.773.42$4,029
Nov 2012594786.953.62$3,868
Oct 20121274789.383.40$3,612
Sep 201281,01494.672.92$3,717
Aug 20121390792.662.91$3,842
Jul 20121282285.133.02$3,505
Jun 20121399879.822.52$3,552
May 20121688491.612.49$3,665
Apr 2012161,071101.652.00$3,765
Mar 2012191,160105.052.22$4,574
Feb 2012151,027101.102.57$4,156
Jan 20121394898.092.73$3,867
Dec 2011221,16696.873.24$5,909
Nov 2011191,17195.723.31$5,696
Oct 2011151,23384.983.65$5,773
Sep 2011151,26983.623.99$6,312
Aug 2011161,36383.404.15$6,990
Jul 2011211,29594.144.52$7,827
Jun 2011131,26992.904.64$7,096
May 2011181,37598.134.40$7,823
Apr 2011181,412105.964.33$8,026
Mar 2011231,48796.364.06$8,250
Feb 2011241,26585.644.18$7,343
Jan 2011241,55786.504.59$9,221
Dec 20101361685.734.35$3,793
Nov 2010141,13580.843.80$5,439
Oct 2010181,38978.103.51$6,280
Sep 2010171,49872.633.98$7,196
Aug 2010231,74073.684.42$9,384
Jul 2010341,74472.554.74$10,727
Jun 2010231,78870.364.91$10,398
May 2010301,92271.124.24$10,274
Apr 2010341,97881.694.12$10,932
Mar 2010362,00278.394.39$11,608
Feb 2010311,89773.585.44$12,605
Jan 2010442,16674.365.96$16,190
Dec 2009352,25971.445.48$14,888
Nov 2009302,30174.593.75$10,870
Oct 2009382,44072.544.11$12,786
Sep 2009422,57065.543.06$10,629
Aug 2009482,82267.423.22$12,319
Jul 2009493,01461.133.46$13,437
Jun 2009623,08866.163.90$16,130
May 2009613,54154.743.93$17,240
Apr 2009743,66346.773.59$16,602
Mar 2009834,63542.144.06$22,311
Feb 2009954,46232.814.63$23,789
Jan 20091144,82235.865.37$29,987
Dec 20081706,50337.105.98$45,176
Nov 20081147,71155.496.86$59,226

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             5 bbl  × $106.41 =       $532
Gas                  386 Mcf  × $  3.05 =     $1,176

────────────────────────────────────────────────────
Month total                                   $1,708

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/244251 is the state's own key, not one this site invented.