ROY HENDERSON ESTATE "A"

Operated by DJH OIL & GAS LLC (P-5 221734) in the OZONA, SW. (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 247110District 7CField 680027502 tax incentive programmesCondensateGasSaveExport
Value, all time
$370 k
Jun 2008 – Jul 2019
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
134
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 114 leases and 114 wells, and the rule below applies to all of them.

Discovered
not filed
Field class
Gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1994-05-16.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112010-04-28197561
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition154 bbl$11,125
GasProduction96,634 Mcf$358,858
Total$369,984

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6010, -101.4020. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.60099, -101.40203 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,900 ft
1 wells filed one
Completion to plug
10.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,900 ft.

Completions filed
Jun 2008
1 of 1 wells
Plug dates filed
Mar 2019
1 of 1 wells

Last completion to plug: a median of 10.8 years across the 1 well that filed both dates, with the middle half between 10.8 years and 10.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1054049129,900 ftJun 2008Mar 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (134)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

134 months

Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20192062.632.75$125
Mar 20190156.803.06$3
Feb 2019010750.852.79$299
Jan 2019212846.033.23$505
Dec 2018238146.594.19$1,688
Nov 2018014752.934.24$623
Oct 2018213961.443.40$595
Sep 2018013959.543.11$432
Aug 201801,09859.403.07$3,367
Jul 201821,43165.142.93$4,326
Jun 201801,23260.183.08$3,791
May 201821,29965.382.90$3,899
Apr 201801,39463.842.90$4,044
Mar 201821,75961.222.79$5,024
Feb 201821,46061.782.77$4,162
Jan 201801,67762.874.01$6,724
Dec 201721,19057.272.92$3,591
Nov 201701,07755.423.12$3,358
Oct 201721,38249.292.98$4,222
Sep 2017095947.523.09$2,961
Aug 201722,52045.373.00$7,662
Jul 201702,54443.873.09$7,854
Jun 2017231842.493.09$1,067
May 201708845.373.26$287
Apr 201722,41447.933.21$7,849
Mar 2017089546.772.98$2,670
Feb 2017287750.452.95$2,690
Jan 201701,11549.413.42$3,812
Dec 201621,19848.763.72$4,557
Nov 201621,08342.492.64$2,949
Oct 2016080746.193.09$2,494
Sep 201621,13941.553.10$3,615
Aug 2016044641.442.92$1,304
Jul 2016255241.622.92$1,697
Jun 2016219745.352.69$620
May 2016031642.521.99$629
Apr 201621,20236.561.99$2,466
Mar 201601,87833.011.79$3,369
Feb 201621,66526.472.06$3,489
Jan 2016224127.352.36$625
Dec 2015012932.362.00$258
Nov 2015213538.792.17$370
Oct 2015217343.552.43$507
Sep 2015220642.992.76$654
Aug 2015026540.162.87$761
Jul 2015225148.152.95$836
Jun 2015042156.152.88$1,214
May 2015234155.212.96$1,118
Apr 2015269749.822.71$1,986
Mar 2015081742.892.93$2,398
Feb 2015245544.662.98$1,443
Jan 2015256043.433.10$1,823
Dec 2014029854.693.59$1,070
Nov 2014269670.464.25$3,100
Oct 2014272578.303.90$2,985
Sep 2014052886.164.05$2,136
Aug 2014268589.394.04$2,943
Jul 2014280096.564.18$3,537
Jun 2014099098.164.74$4,690
May 2014274694.734.73$3,715
Apr 201401,36295.944.81$6,550
Mar 201421,45795.895.06$7,560
Feb 2014272497.406.19$4,678
Jan 2014219790.404.86$1,138
Dec 2013217491.824.35$941
Nov 2013119088.853.74$799
Oct 2013017697.423.78$665
Sep 20132355104.113.72$1,528
Aug 20132337104.253.52$1,396
Jul 2013270102.523.72$465
Jun 201309194.403.93$358
May 201328094.834.15$522
Apr 2013226193.964.28$1,306
Mar 2013210693.623.91$602
Feb 201308191.233.42$277
Jan 2013223091.603.42$970
Dec 2012213086.773.42$618
Nov 201226286.953.62$399
Oct 2012066689.383.40$2,264
Sep 201221,55194.672.92$4,716
Aug 2012288892.662.91$2,768
Jul 201201,06985.133.02$3,229
Jun 201221,15079.822.52$3,057
May 2012299591.612.49$2,659
Apr 20120729101.652.00$1,456
Mar 20122862105.052.22$2,126
Feb 201221,253101.102.57$3,423
Jan 201221,04098.092.73$3,040
Dec 2011289796.873.24$3,100
Nov 201101,05495.723.31$3,490
Oct 2011266184.983.65$2,582
Sep 2011180183.623.99$3,276
Aug 2011267383.404.15$2,959
Jul 201101,07394.144.52$4,847
Jun 2011270792.904.64$3,466
May 2011235198.134.40$1,742
Apr 20110536105.964.33$2,323
Mar 2011241996.364.06$1,893
Feb 2011215285.644.18$807
Jan 2011235486.504.59$1,797
Dec 2010254885.734.35$2,554
Nov 2010244080.843.80$1,832
Oct 2010216278.103.51$725
Sep 2010256472.633.98$2,390
Aug 2010035573.684.42$1,569
Jul 2010244272.554.74$2,239
Jun 2010250670.364.91$2,625
May 2010256971.124.24$2,552
Apr 2010238781.694.12$1,759
Mar 2010252878.394.39$2,474
Feb 2010279973.585.44$4,496
Jan 2010261174.365.96$3,793
Dec 2009261771.445.48$3,526
Nov 2009252774.593.75$2,126
Oct 2009086672.544.11$3,559
Sep 2009038265.543.06$1,171
Aug 2009072967.423.22$2,346
Jul 2009064761.133.46$2,242
Jun 2009050566.163.90$1,967
May 2009093654.743.93$3,675
Apr 200901,96146.773.59$7,035
Mar 200901,22042.144.06$4,952
Feb 200901,43832.814.63$6,662
Jan 200902,14735.865.37$11,532
Dec 200802,15937.105.98$12,905
Nov 200802,91855.496.86$20,019
Oct 2008022775.246.92$1,571
Sep 20080115101.767.88$906
Aug 20080366114.228.48$3,105
Jul 20080448131.0811.39$5,102
Jun 20080138131.3313.03$1,799

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2019 — as filed, then multipliedworked
Condensate             2 bbl  × $ 62.63 =       $125
Gas                    0 Mcf  × $  2.75 =         $0

────────────────────────────────────────────────────
Month total                                     $125

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/247110 is the state's own key, not one this site invented.