PIERCE, J. S. "4A"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 250749District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$812 k
Jan 2008 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112010-10-11194776
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition49 bbl$3,383
GasProduction166,134 Mcf$808,955
Total$812,337

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4663, -101.4550. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46632, -101.45498 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,959 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,959 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-1054046666,959 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 20261275106.413.05$944
Apr 2026433598.932.87$1,357
Mar 20261089.753.15$90
Feb 2026922863.503.75$1,427
Jan 2026226559.138.00$2,238
Dec 2025326856.664.41$1,353
Nov 2025327358.593.93$1,248
Oct 2025225359.383.30$955
Sep 2025125062.743.08$832
Aug 2025226563.933.01$927
Jul 2025226666.743.32$1,015
Jun 2025226066.483.13$946
May 2025326060.553.23$1,022
Apr 2025329362.363.54$1,225
Mar 2025424367.704.27$1,308
Feb 2025428970.884.34$1,538
Jan 20250074.324.28$0
Dec 2024010168.993.12$315
Nov 2024017869.052.20$391
Oct 2024021271.372.28$484
Sep 2024028869.612.36$681
Aug 2024030875.632.06$636
Jul 2024031979.932.15$685
Jun 2024031478.082.63$827
May 2024032278.812.20$708
Apr 2024031284.451.66$518
Mar 2024032780.301.55$505
Feb 2024029276.091.78$521
Jan 2024032173.023.30$1,059
Dec 2023031471.262.61$820
Nov 2023032677.892.81$915
Oct 2023335385.443.09$1,346
Sep 2023032189.042.74$878
Aug 2023031680.522.67$845
Jul 2023035674.852.64$940
Jun 2023034468.962.26$777
May 2023037070.622.23$824
Apr 2023033578.122.24$750
Mar 2023036172.852.39$864
Feb 2023034075.112.47$838
Jan 2023036676.533.39$1,240
Dec 2022029976.415.73$1,713
Nov 2022034785.005.65$1,959
Oct 2022034987.185.86$2,046
Sep 2022031284.888.16$2,547
Aug 2022030794.529.13$2,802
Jul 20220405101.587.54$3,055
Jun 20220366115.097.98$2,920
May 20220397109.378.43$3,348
Apr 20220399104.226.84$2,728
Mar 20220361108.885.08$1,833
Feb 2022016291.054.86$787
Jan 2022027581.844.54$1,248
Dec 2021030071.323.90$1,170
Nov 2021024977.435.24$1,304
Oct 2021035479.795.71$2,023
Sep 2021036269.865.35$1,937
Aug 2021038666.024.22$1,629
Jul 2021054070.783.98$2,150
Jun 2021039369.493.38$1,329
May 2021028563.483.02$860
Apr 2021043560.362.76$1,200
Mar 2021059461.302.72$1,614
Feb 2021031057.805.55$1,720
Jan 2021052350.412.81$1,470
Dec 2020020744.642.68$554
Nov 2020022338.772.71$604
Oct 2020023736.972.48$587
Sep 2020020237.091.99$402
Aug 2020022339.982.39$532
Jul 2020022638.371.83$412
Jun 2020022634.901.69$382
May 2020023816.921.81$432
Apr 2020026414.751.80$476
Mar 2020026830.341.86$497
Feb 2020025949.881.98$513
Jan 2020028857.252.09$603
Dec 2019030659.012.30$705
Nov 2019028755.302.75$789
Oct 2019034453.472.42$832
Sep 2019034155.052.66$906
Aug 2019040153.112.30$924
Jul 2019042156.272.46$1,036
Jun 2019044052.782.49$1,096
May 2019042658.482.74$1,167
Apr 2019039862.632.75$1,095
Mar 2019041856.803.06$1,280
Feb 2019038650.852.79$1,078
Jan 2019045546.033.23$1,469
Dec 2018047546.594.19$1,988
Nov 2018042452.934.24$1,797
Oct 2018049261.443.40$1,672
Sep 2018035759.543.11$1,110
Aug 2018038859.403.07$1,190
Jul 2018043965.142.93$1,287
Jun 2018046660.183.08$1,434
May 2018048465.382.90$1,404
Apr 2018053263.842.90$1,543
Mar 2018038761.222.79$1,079
Feb 2018044261.782.77$1,223
Jan 2018045062.874.01$1,804
Dec 2017044657.272.92$1,303
Nov 2017040655.423.12$1,266
Oct 2017044949.292.98$1,340
Sep 2017048947.523.09$1,510
Aug 2017030845.373.00$925
Jul 2017040943.873.09$1,263
Jun 2017066042.493.09$2,038
May 2017024245.373.26$790
Apr 201702547.933.21$80
Mar 2017038746.772.98$1,155
Feb 2017041850.452.95$1,234
Jan 2017047949.413.42$1,638
Dec 2016049148.763.72$1,828
Nov 2016049542.492.64$1,309
Oct 2016066646.193.09$2,058
Sep 2016033841.553.10$1,048
Aug 2016058441.442.92$1,708
Jul 2016056741.622.92$1,658
Jun 2016057745.352.69$1,550
May 2016060042.521.99$1,195
Apr 2016057636.561.99$1,147
Mar 2016061733.011.79$1,107
Feb 2016057626.472.06$1,189
Jan 2016063527.352.36$1,501
Dec 2015068932.362.00$1,379
Nov 2015050738.792.17$1,099
Oct 2015065643.552.43$1,592
Sep 2015065142.992.76$1,796
Aug 2015060940.162.87$1,749
Jul 2015062848.152.95$1,850
Jun 2015055156.152.88$1,588
May 2015064255.212.96$1,897
Apr 2015062549.822.71$1,692
Mar 2015060042.892.93$1,761
Feb 2015060044.662.98$1,786
Jan 2015071943.433.10$2,229
Dec 2014074654.693.59$2,679
Nov 2014074870.464.25$3,180
Oct 2014052778.303.90$2,056
Sep 2014071486.164.05$2,888
Aug 2014073889.394.04$2,978
Jul 2014075496.564.18$3,151
Jun 2014074198.164.74$3,510
May 2014080394.734.73$3,795
Apr 2014066395.944.81$3,188
Mar 2014060195.895.06$3,039
Feb 2014063797.406.19$3,944
Jan 2014073690.404.86$3,577
Dec 2013076391.824.35$3,322
Nov 2013074388.853.74$2,778
Oct 2013078297.423.78$2,955
Sep 20130778104.113.72$2,892
Aug 20130824104.253.52$2,903
Jul 20130861102.523.72$3,201
Jun 2013087394.403.93$3,434
May 2013069194.834.15$2,867
Apr 2013091393.964.28$3,910
Mar 2013072393.623.91$2,829
Feb 2013077491.233.42$2,647
Jan 2013085191.603.42$2,910
Dec 2012085586.773.42$2,924
Nov 2012087486.953.62$3,168
Oct 2012091589.383.40$3,111
Sep 2012094394.672.92$2,752
Aug 2012089892.662.91$2,612
Jul 2012080785.133.02$2,438
Jun 2012083079.822.52$2,091
May 2012094391.612.49$2,346
Apr 20120939101.652.00$1,875
Mar 20120997105.052.22$2,215
Feb 20120929101.102.57$2,388
Jan 201201,00998.092.73$2,759
Dec 201101,01596.873.24$3,288
Nov 201101,00995.723.31$3,341
Oct 201101,07884.983.65$3,933
Sep 201101,11283.623.99$4,432
Aug 2011086783.404.15$3,597
Jul 201101,04094.144.52$4,698
Jun 201101,04492.904.64$4,844
May 201101,10698.134.40$4,872
Apr 20110983105.964.33$4,260
Mar 201101,11796.364.06$4,532
Feb 201101,04285.644.18$4,356
Jan 201101,17386.504.59$5,383
Dec 201001,20685.734.35$5,243
Nov 201001,04780.843.80$3,974
Oct 201001,20778.103.51$4,235
Sep 201001,22372.633.98$4,867
Aug 201001,29673.684.42$5,727
Jul 201001,39172.554.74$6,588
Jun 201001,30570.364.91$6,408
May 201001,44671.124.24$6,124
Apr 201001,28681.694.12$5,302
Mar 201001,48478.394.39$6,513
Feb 201001,37473.585.44$7,478
Jan 201001,55474.365.96$9,268
Dec 200901,69271.445.48$9,279
Nov 200901,73274.593.75$6,498
Oct 200901,37472.544.11$5,647
Sep 200901,66065.543.06$5,087
Aug 200901,77467.423.22$5,710
Jul 200901,80561.133.46$6,253
Jun 200902,02666.163.90$7,891
May 200901,87154.743.93$7,345
Apr 200901,79546.773.59$6,440
Mar 200901,95342.144.06$7,927
Feb 200901,84132.814.63$8,529
Jan 200902,13935.865.37$11,489
Dec 200802,23537.105.98$13,359
Nov 200802,31355.496.86$15,868
Oct 200802,85675.246.92$19,769
Sep 200801,816101.767.88$14,305
Aug 200802,744114.228.48$23,277
Jul 200802,747131.0811.39$31,287
Jun 200802,909131.3313.03$37,912
May 200803,454123.1711.57$39,978
Apr 200802,932110.3110.45$30,654
Mar 200803,078101.909.66$29,746
Feb 200803,42292.538.77$30,013
Jan 200804,77290.388.21$39,158

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                  275 Mcf  × $  3.05 =       $838

────────────────────────────────────────────────────
Month total                                     $944

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/250749 is the state's own key, not one this site invented.