DAVIDSON, C.E. JR. NCT-1

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 254468District 7CField 679980752 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
Sep 2009 – May 2026
Value, last 12 filed months
$46 k
at the published price for each month
Months reported
201
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112011-10-10203681
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,482 bbl$253,252
GasProduction299,837 Mcf$1,084,335
Total$1,337,587

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6496, -101.1209. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.64962, -101.12094 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,300 ft.

Completions filed
Sep 2009
1 of 1 wells

1 well

42-10539173128,300 ftSep 2009

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (201)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

201 months

May 202611921106.413.05$3,976
Apr 2026542198.932.87$1,703
Mar 20262089.753.15$180
Feb 20262188563.503.75$4,653
Jan 20261498259.138.00$8,682
Dec 2025171,00056.664.41$5,377
Nov 20251395758.593.93$4,519
Oct 20251685759.383.30$3,782
Sep 202581,02962.743.08$3,668
Aug 2025926463.933.01$1,371
Jul 20251184266.743.32$3,526
Jun 2025131,06166.483.13$4,184
May 20251763460.553.23$3,079
Apr 2025121,07162.363.54$4,543
Mar 2025211,02067.704.27$5,775
Feb 2025995570.884.34$4,783
Jan 20253074.324.28$223
Dec 2024975968.993.12$2,990
Nov 2024993669.052.20$2,679
Oct 202451,11571.372.28$2,901
Sep 202471,07669.612.36$3,031
Aug 202471,14175.632.06$2,884
Jul 202471,13279.932.15$2,989
Jun 202471,09878.082.63$3,439
May 202451,14978.812.20$2,920
Apr 202491,06884.451.66$2,532
Mar 2024782580.301.55$1,837
Feb 202491,11576.091.78$2,674
Jan 202471,18473.023.30$4,416
Dec 2023101,11571.262.61$3,624
Nov 2023793977.892.81$3,182
Oct 2023554385.443.09$2,104
Sep 2023792789.042.74$3,159
Aug 202376080.522.67$724
Jul 2023537374.852.64$1,360
Jun 202371,00068.962.26$2,741
May 2023101,04770.622.23$3,038
Apr 2023101,01678.122.24$3,055
Mar 2023101,04572.852.39$3,229
Feb 20231092775.112.47$3,037
Jan 202391,01176.533.39$4,114
Dec 2022799276.415.73$6,218
Nov 2022101,00285.005.65$6,507
Oct 202271,02887.185.86$6,638
Sep 2022799984.888.16$8,750
Aug 202251,03394.529.13$9,901
Jul 202271,062101.587.54$8,721
Jun 20227765115.097.98$6,908
May 202271,019109.378.43$9,359
Apr 20227886104.226.84$6,788
Mar 202210993108.885.08$6,130
Feb 2022789491.054.86$4,981
Jan 2022101,01881.844.54$5,438
Dec 202191,01771.323.90$4,607
Nov 2021101,02277.435.24$6,126
Oct 2021121,05779.795.71$6,997
Sep 202171,07269.865.35$6,225
Aug 202151,07266.024.22$4,855
Jul 202171,09070.783.98$4,836
Jun 2021784669.493.38$3,346
May 20211098863.483.02$3,616
Apr 20211297560.362.76$3,414
Mar 2021783061.302.72$2,684
Feb 2021773057.805.55$4,455
Jan 20211277350.412.81$2,777
Dec 20201091944.642.68$2,905
Nov 2020789838.772.71$2,702
Oct 20201092436.972.48$2,660
Sep 20201082337.091.99$2,010
Aug 2020589539.982.39$2,335
Jul 2020790938.371.83$1,928
Jun 2020786634.901.69$1,708
May 20201089116.921.81$1,786
Apr 2020968214.751.80$1,363
Mar 2020772730.341.86$1,562
Feb 20201283649.881.98$2,254
Jan 2020789257.252.09$2,269
Dec 20191289359.012.30$2,766
Nov 2019987755.302.75$2,910
Oct 2019990753.472.42$2,675
Sep 2019788255.052.66$2,729
Aug 2019789753.112.30$2,439
Jul 2019990756.272.46$2,738
Jun 2019977552.782.49$2,406
May 2019779058.482.74$2,574
Apr 2019981462.632.75$2,803
Mar 201971,32956.803.06$4,467
Feb 2019101,33450.852.79$4,233
Jan 201971,49646.033.23$5,152
Dec 2018171,48346.594.19$6,999
Nov 2018191,44652.934.24$7,133
Oct 201871,56861.443.40$5,758
Sep 201851,56559.543.11$5,162
Aug 201891,71059.403.07$5,778
Jul 2018765065.142.93$2,362
Jun 201871,20660.183.08$4,132
May 2018131,40865.382.90$4,934
Apr 2018111,50363.842.90$5,062
Mar 2018111,55261.222.79$4,999
Feb 2018111,36961.782.77$4,466
Jan 2018111,60862.874.01$7,139
Dec 2017111,50057.272.92$5,012
Nov 2017131,41255.423.12$5,124
Oct 2017111,48049.292.98$4,958
Sep 2017121,44447.523.09$5,028
Aug 2017141,53645.373.00$5,250
Jul 2017131,51243.873.09$5,238
Jun 2017101,48442.493.09$5,006
May 2017111,38445.373.26$5,016
Apr 2017121,54047.933.21$5,521
Mar 2017121,48746.772.98$4,998
Feb 2017111,36050.452.95$4,570
Jan 2017141,72349.413.42$6,582
Dec 201691,75048.763.72$6,954
Nov 2016892842.492.64$2,794
Oct 20161099146.193.09$3,524
Sep 201681,58741.553.10$5,253
Aug 201681,59041.442.92$4,981
Jul 201681,54041.622.92$4,836
Jun 201671,41345.352.69$4,113
May 201681,76542.521.99$3,854
Apr 201681,57536.561.99$3,428
Mar 201691,77133.011.79$3,474
Feb 2016101,70926.472.06$3,791
Jan 2016111,85127.352.36$4,677
Dec 2015121,89632.362.00$4,183
Nov 2015171,87638.792.17$4,725
Oct 2015181,95843.552.43$5,535
Sep 2015121,83742.992.76$5,583
Aug 2015131,45640.162.87$4,704
Jul 20151285848.152.95$3,105
Jun 201591,38956.152.88$4,510
May 201541,41055.212.96$4,388
Apr 201571,71549.822.71$4,991
Mar 2015131,73942.892.93$5,661
Feb 2015141,57744.662.98$5,319
Jan 2015261,78343.433.10$6,658
Dec 2014221,69154.693.59$7,276
Nov 2014331,49270.464.25$8,669
Oct 2014301,67978.303.90$8,899
Sep 2014251,65086.164.05$8,829
Aug 2014281,70489.394.04$9,379
Jul 2014211,67396.564.18$9,020
Jun 2014251,65998.164.74$10,312
May 2014241,69494.734.73$10,280
Apr 2014201,64495.944.81$9,825
Mar 20142077695.895.06$5,842
Feb 2014221,73097.406.19$12,855
Jan 2014241,80090.404.86$10,919
Dec 2013171,50791.824.35$8,123
Nov 2013191,37188.853.74$6,813
Oct 2013161,79397.423.78$8,335
Sep 2013121,769104.113.72$7,826
Aug 2013101,947104.253.52$7,901
Jul 2013121,808102.523.72$7,952
Jun 2013111,76694.403.93$7,985
May 2013112,04494.834.15$9,524
Apr 2013101,95093.964.28$9,291
Mar 2013112,07893.623.91$9,161
Feb 2013121,90391.233.42$7,603
Jan 2013182,08691.603.42$8,783
Dec 2012192,05886.773.42$8,687
Nov 2012172,05286.953.62$8,917
Oct 2012182,14189.383.40$8,888
Sep 2012172,08594.672.92$7,694
Aug 2012182,16592.662.91$7,964
Jul 2012162,19485.133.02$7,990
Jun 2012162,16179.822.52$6,721
May 2012192,24891.612.49$7,334
Apr 2012172,179101.652.00$6,079
Mar 2012172,301105.052.22$6,899
Feb 2012171,994101.102.57$6,844
Jan 2012162,15298.092.73$7,453
Dec 2011172,18196.873.24$8,713
Nov 2011141,59595.723.31$6,622
Oct 2011192,49484.983.65$10,714
Sep 2011162,33083.623.99$10,625
Aug 2011192,50983.404.15$11,995
Jul 2011202,58494.144.52$13,555
Jun 2011202,56892.904.64$13,773
May 2011292,71698.134.40$14,809
Apr 2011272,584105.964.33$14,058
Mar 2011252,78296.364.06$13,697
Feb 2011202,45185.644.18$11,958
Jan 2011242,80886.504.59$14,961
Dec 2010272,85785.734.35$14,736
Nov 2010272,84980.843.80$12,996
Oct 2010213,04178.103.51$12,311
Sep 2010142,79772.633.98$12,147
Aug 2010162,85073.684.42$13,774
Jul 2010183,12472.554.74$16,103
Jun 2010273,10970.364.91$17,166
May 2010313,36471.124.24$16,452
Apr 2010323,31381.694.12$16,273
Mar 2010443,51878.394.39$18,889
Feb 2010483,19173.585.44$20,898
Jan 20101283,69974.365.96$31,579
Dec 20092803,91971.445.48$41,494
Nov 20092743,91174.593.75$35,110
Oct 20092663,88972.544.11$35,280
Sep 2009014065.543.06$429

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate            11 bbl  × $106.41 =     $1,171
Gas                  921 Mcf  × $  3.05 =     $2,805

────────────────────────────────────────────────────
Month total                                   $3,976

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/254468 is the state's own key, not one this site invented.