CHILDRESS, P. L. "G"

Operated by ZARVONA ENERGY LLC (P-5 950523) in the OZONA, NE. (CANYON 7520) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 255551District 7CField 679985002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Jan 2010 – May 2026
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
197
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 592 leases and 641 wells, and the rule below applies to all of them.

Discovered
1966-01-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: PER DOCKET 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112010-05-24197996
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition784 bbl$61,605
GasProduction252,421 Mcf$958,240
Total$1,019,845

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.7550, -100.9845. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.75499, -100.98455 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,000 ft.

Completions filed
Jan 2010
1 of 1 wells

1 well

42-1054103010228,000 ftJan 2010

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (197)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

197 months

May 202605106.413.05$15
Apr 202601098.932.87$29
Mar 202603289.753.15$101
Feb 2026038563.503.75$1,444
Jan 2026043259.138.00$3,455
Dec 2025047556.664.41$2,096
Nov 2025048058.593.93$1,885
Oct 2025041559.383.30$1,372
Sep 2025041562.743.08$1,277
Aug 2025041463.933.01$1,248
Jul 2025042266.743.32$1,399
Jun 2025042266.483.13$1,320
May 2025046760.553.23$1,509
Apr 2025045962.363.54$1,626
Mar 2025045467.704.27$1,938
Feb 2025032970.884.34$1,428
Jan 2025045374.324.28$1,938
Dec 2024045368.993.12$1,414
Nov 2024042269.052.20$928
Oct 2024047171.372.28$1,075
Sep 2024044369.612.36$1,047
Aug 2024046775.632.06$964
Jul 2024042779.932.15$917
Jun 2024039078.082.63$1,027
May 2024047578.812.20$1,044
Apr 2024038384.451.66$635
Mar 2024045780.301.55$706
Feb 2024038476.091.78$685
Jan 2024038473.023.30$1,266
Dec 2023044171.262.61$1,151
Nov 2023040477.892.81$1,134
Oct 2023039685.443.09$1,223
Sep 2023033089.042.74$903
Aug 2023016580.522.67$441
Jul 2023017374.852.64$457
Jun 2023043068.962.26$971
May 2023039570.622.23$880
Apr 2023046378.122.24$1,036
Mar 2023048772.852.39$1,165
Feb 2023049675.112.47$1,223
Jan 2023057076.533.39$1,931
Dec 2022052576.415.73$3,008
Nov 2022058385.005.65$3,292
Oct 2022057287.185.86$3,354
Sep 2022051284.888.16$4,180
Aug 2022056394.529.13$5,139
Jul 20220570101.587.54$4,299
Jun 20220438115.097.98$3,494
May 20220615109.378.43$5,186
Apr 202225587104.226.84$6,619
Mar 20220663108.885.08$3,366
Feb 2022060391.054.86$2,930
Jan 2022068281.844.54$3,095
Dec 2021060471.323.90$2,355
Nov 2021049677.435.24$2,597
Oct 2021054579.795.71$3,114
Sep 2021052269.865.35$2,793
Aug 2021055766.024.22$2,351
Jul 2021053670.783.98$2,134
Jun 2021059769.493.38$2,018
May 2021054363.483.02$1,639
Apr 2021054660.362.76$1,506
Mar 2021059361.302.72$1,611
Feb 2021045857.805.55$2,541
Jan 2021058750.412.81$1,650
Dec 2020059344.642.68$1,587
Nov 2020055438.772.71$1,499
Oct 2020060436.972.48$1,497
Sep 2020061637.091.99$1,226
Aug 2020061839.982.39$1,474
Jul 2020063038.371.83$1,150
Jun 2020061134.901.69$1,033
May 2020063516.921.81$1,152
Apr 2020062414.751.80$1,126
Mar 2020065230.341.86$1,210
Feb 2020061449.881.98$1,216
Jan 2020065457.252.09$1,370
Dec 2019067759.012.30$1,560
Nov 2019058355.302.75$1,604
Oct 2019070353.472.42$1,700
Sep 2019065655.052.66$1,743
Aug 2019059953.112.30$1,380
Jul 2019071756.272.46$1,764
Jun 2019070252.782.49$1,749
May 2019077558.482.74$2,124
Apr 2019072762.632.75$2,000
Mar 2019070756.803.06$2,165
Feb 2019067250.852.79$1,876
Jan 2019072646.033.23$2,344
Dec 2018077946.594.19$3,260
Nov 2018078252.934.24$3,314
Oct 2018082161.443.40$2,790
Sep 2018082259.543.11$2,555
Aug 2018082159.403.07$2,518
Jul 2018081065.142.93$2,375
Jun 20183583660.183.08$4,679
May 2018082065.382.90$2,379
Apr 2018084363.842.90$2,445
Mar 2018085961.222.79$2,394
Feb 2018078361.782.77$2,166
Jan 2018083462.874.01$3,344
Dec 2017090557.272.92$2,644
Nov 2017083555.423.12$2,604
Oct 2017089849.292.98$2,679
Sep 2017089447.523.09$2,760
Aug 2017088245.373.00$2,650
Jul 2017092943.873.09$2,868
Jun 2017089842.493.09$2,772
May 2017091645.373.26$2,989
Apr 2017089047.933.21$2,858
Mar 20175688446.772.98$5,257
Feb 2017085050.452.95$2,510
Jan 2017093249.413.42$3,186
Dec 2016092048.763.72$3,425
Nov 2016085342.492.64$2,256
Oct 2016098146.193.09$3,032
Sep 2016095241.553.10$2,952
Aug 2016099941.442.92$2,921
Jul 201601,00941.622.92$2,951
Jun 2016098945.352.69$2,656
May 201601,04542.521.99$2,081
Apr 201601,01136.561.99$2,013
Mar 201601,05433.011.79$1,891
Feb 2016099026.472.06$2,043
Jan 201601,09427.352.36$2,587
Dec 2015661,07932.362.00$4,295
Nov 201501,06538.792.17$2,308
Oct 201501,06943.552.43$2,594
Sep 201501,11742.992.76$3,081
Aug 201501,10240.162.87$3,165
Jul 201501,19048.152.95$3,505
Jun 201501,24856.152.88$3,598
May 201501,05655.212.96$3,121
Apr 201501,21149.822.71$3,278
Mar 201501,24742.892.93$3,660
Feb 201501,15844.662.98$3,446
Jan 201501,30343.433.10$4,040
Dec 201401,35154.693.59$4,852
Nov 201401,29270.464.25$5,493
Oct 2014641,33478.303.90$10,215
Sep 201401,31986.164.05$5,336
Aug 201401,37889.394.04$5,560
Jul 201401,37996.564.18$5,764
Jun 201401,33898.164.74$6,338
May 201401,45294.734.73$6,863
Apr 201401,47395.944.81$7,084
Mar 201401,36895.895.06$6,918
Feb 201401,36697.406.19$8,458
Jan 201401,51290.404.86$7,349
Dec 201301,43291.824.35$6,236
Nov 2013441,49088.853.74$9,479
Oct 201301,61197.423.78$6,089
Sep 201301,585104.113.72$5,893
Aug 201301,680104.253.52$5,918
Jul 201301,710102.523.72$6,357
Jun 201301,61694.403.93$6,356
May 201301,79694.834.15$7,452
Apr 201302,02593.964.28$8,672
Mar 2013701,07893.623.91$10,771
Feb 201301,61691.233.42$5,527
Jan 201301,73491.603.42$5,930
Dec 201201,49086.773.42$5,096
Nov 201201,84786.953.62$6,695
Oct 201201,95989.383.40$6,660
Sep 201201,94594.672.92$5,676
Aug 201202,05692.662.91$5,979
Jul 201202,09085.133.02$6,313
Jun 2012562,08079.822.52$9,710
May 201202,19291.612.49$5,454
Apr 201202,166101.652.00$4,325
Mar 201202,283105.052.22$5,073
Feb 201202,190101.102.57$5,629
Jan 201202,37998.092.73$6,504
Dec 20111222,44096.873.24$19,723
Nov 201102,43695.723.31$8,066
Oct 201102,56884.983.65$9,369
Sep 201102,53983.623.99$10,120
Aug 201102,60583.404.15$10,809
Jul 201102,81794.144.52$12,725
Jun 201102,78492.904.64$12,917
May 201103,01798.134.40$13,289
Apr 201102,846105.964.33$12,333
Mar 2011923,17996.364.06$21,763
Feb 201102,93185.644.18$12,252
Jan 201103,13286.504.59$14,372
Dec 201003,54685.734.35$15,417
Nov 201003,61280.843.80$13,709
Oct 2010613,97078.103.51$18,694
Sep 201004,12472.633.98$16,411
Aug 201004,78173.684.42$21,129
Jul 2010934,46772.554.74$27,905
Jun 201005,12470.364.91$25,161
May 201005,78871.124.24$24,513
Apr 201006,32581.694.12$26,076
Mar 201007,88378.394.39$34,596
Feb 201009,53373.585.44$51,882
Jan 201007,97674.365.96$47,570

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    5 Mcf  × $  3.05 =        $15

────────────────────────────────────────────────────
Month total                                      $15

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/255551 is the state's own key, not one this site invented.