MAYER, EDWIN S. JR. "B" 38

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 258631District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$96 k
Jun 2010 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
192
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112011-02-14201320
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition30 bbl$2,143
GasProduction25,552 Mcf$93,875
Total$96,018

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6982, -100.9160. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.69817, -100.91599 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,800 ft.

Completions filed
Jun 2010
1 of 1 wells

1 well

42-4353927698,800 ftJun 2010

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (192)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

192 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 202401975.632.06$39
Jul 202402079.932.15$43
Jun 202401778.082.63$45
May 202402478.812.20$53
Apr 202402284.451.66$37
Mar 202402180.301.55$32
Feb 202401676.091.78$29
Jan 202401373.023.30$43
Dec 202301871.262.61$47
Nov 202301877.892.81$51
Oct 202301985.443.09$59
Sep 202301589.042.74$41
Aug 202302180.522.67$56
Jul 202302174.852.64$55
Jun 202302468.962.26$54
May 202302570.622.23$56
Apr 202302578.122.24$56
Mar 202302772.852.39$65
Feb 202302375.112.47$57
Jan 202302776.533.39$91
Dec 202202476.415.73$138
Nov 202202285.005.65$124
Oct 202202487.185.86$141
Sep 202202384.888.16$188
Aug 202202094.529.13$183
Jul 2022021101.587.54$158
Jun 2022022115.097.98$176
May 2022043109.378.43$363
Apr 2022028104.226.84$191
Mar 2022028108.885.08$142
Feb 202202691.054.86$126
Jan 202203081.844.54$136
Dec 202104471.323.90$172
Nov 202103677.435.24$189
Oct 202103679.795.71$206
Sep 202103369.865.35$177
Aug 202103866.024.22$160
Jul 202103970.783.98$155
Jun 202103869.493.38$128
May 202103963.483.02$118
Apr 202103860.362.76$105
Mar 202104661.302.72$125
Feb 202104357.805.55$239
Jan 202104350.412.81$121
Dec 202004044.642.68$107
Nov 202004338.772.71$116
Oct 202004236.972.48$104
Sep 202004237.091.99$84
Aug 202004439.982.39$105
Jul 202004538.371.83$82
Jun 202004734.901.69$79
May 2020014916.921.81$270
Apr 202004714.751.80$85
Mar 202005030.341.86$93
Feb 202004549.881.98$89
Jan 202004557.252.09$94
Dec 201904859.012.30$111
Nov 201904755.302.75$129
Oct 201904753.472.42$114
Sep 201904655.052.66$122
Aug 201904253.112.30$97
Jul 201904256.272.46$103
Jun 201904252.782.49$105
May 201904158.482.74$112
Apr 201904062.632.75$110
Mar 201904356.803.06$132
Feb 201903850.852.79$106
Jan 201904446.033.23$142
Dec 201804246.594.19$176
Nov 201804152.934.24$174
Oct 201804361.443.40$146
Sep 201804159.543.11$127
Aug 201804559.403.07$138
Jul 201804665.142.93$135
Jun 201804660.183.08$142
May 201804565.382.90$131
Apr 201804763.842.90$136
Mar 201804761.222.79$131
Feb 201804261.782.77$116
Jan 201804662.874.01$184
Dec 201704457.272.92$129
Nov 201704255.423.12$131
Oct 2017012049.292.98$358
Sep 2017012047.523.09$370
Aug 2017012645.373.00$379
Jul 2017512943.873.09$618
Jun 2017012442.493.09$383
May 201704745.373.26$153
Apr 201704347.933.21$138
Mar 2017012546.772.98$373
Feb 201704250.452.95$124
Jan 201704549.413.42$154
Dec 201604948.763.72$182
Nov 201604842.492.64$127
Oct 201604146.193.09$127
Sep 201603741.553.10$115
Aug 201603241.442.92$94
Jul 2016011741.622.92$342
Jun 201604045.352.69$107
May 201604342.521.99$86
Apr 201602036.561.99$40
Mar 201664433.011.79$277
Feb 201604426.472.06$91
Jan 201604727.352.36$111
Dec 201505432.362.00$108
Nov 201504438.792.17$95
Oct 201504943.552.43$119
Sep 201504742.992.76$130
Aug 201505240.162.87$149
Jul 201506348.152.95$186
Jun 201505456.152.88$156
May 201505455.212.96$160
Apr 201505349.822.71$143
Mar 201505142.892.93$150
Feb 201504244.662.98$125
Jan 201505143.433.10$158
Dec 201405054.693.59$180
Nov 201405370.464.25$225
Oct 201407278.303.90$281
Sep 201406086.164.05$243
Aug 201406689.394.04$266
Jul 201408496.564.18$351
Jun 201409298.164.74$436
May 201407094.734.73$331
Apr 201406695.944.81$317
Mar 201406995.895.06$349
Feb 201407097.406.19$433
Jan 201406690.404.86$321
Dec 201306091.824.35$261
Nov 201306788.853.74$250
Oct 2013012797.423.78$480
Sep 20130110104.113.72$409
Aug 20130143104.253.52$504
Jul 20130133102.523.72$494
Jun 2013010594.403.93$413
May 2013017094.834.15$705
Apr 2013016093.964.28$685
Mar 2013016193.623.91$630
Feb 2013014891.233.42$506
Jan 2013011191.603.42$380
Dec 2012017586.773.42$599
Nov 2012019686.953.62$710
Oct 2012024889.383.40$843
Sep 2012134394.672.92$1,096
Aug 2012037492.662.91$1,088
Jul 2012045685.133.02$1,377
Jun 2012244479.822.52$1,278
May 2012043891.612.49$1,090
Apr 20120436101.652.00$871
Mar 20120599105.052.22$1,331
Feb 20120355101.102.57$912
Jan 2012045098.092.73$1,230
Dec 2011063696.873.24$2,060
Nov 2011271795.723.31$2,566
Oct 2011283284.983.65$3,206
Sep 2011187383.623.99$3,563
Aug 2011095183.404.15$3,946
Jul 2011196894.144.52$4,467
Jun 2011296792.904.64$4,673
May 201101,06098.134.40$4,669
Apr 201131,057105.964.33$4,898
Mar 201101,20996.364.06$4,905
Feb 201151,22285.644.18$5,536
Jan 2011059786.504.59$2,740
Dec 2010054085.734.35$2,348
Nov 2010040280.843.80$1,526
Oct 2010035978.103.51$1,260
Sep 2010034672.633.98$1,377
Aug 2010025373.684.42$1,118
Jul 2010032172.554.74$1,520
Jun 2010034370.364.91$1,684

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 75.63 =         $0
Gas                   19 Mcf  × $  2.06 =        $39

────────────────────────────────────────────────────
Month total                                      $39

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/258631 is the state's own key, not one this site invented.