MAYER RANCH 41

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 260616District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$111 k
Nov 2010 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
187
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112011-09-19203395
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition114 bbl$6,143
GasProduction30,144 Mcf$105,197
Total$111,340

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6819, -100.9448. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.68189, -100.94483 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,758 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,758 ft.

Completions filed
Nov 2010
1 of 1 wells

1 well

42-4353930668,758 ftNov 2010

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (187)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

187 months

May 2026036106.413.05$110
Apr 202602998.932.87$83
Mar 202603089.753.15$94
Feb 202602863.503.75$105
Jan 202603159.138.00$248
Dec 202513256.664.41$198
Nov 202513158.593.93$180
Oct 202513259.383.30$165
Sep 202513162.743.08$158
Aug 202513263.933.01$160
Jul 202513266.743.32$173
Jun 202503266.483.13$100
May 202514260.553.23$196
Apr 202503562.363.54$124
Mar 202513967.704.27$234
Feb 202513470.884.34$218
Jan 202513874.324.28$237
Dec 202413468.993.12$175
Nov 202413769.052.20$150
Oct 202403971.372.28$89
Sep 202403569.612.36$83
Aug 202413775.632.06$152
Jul 202414079.932.15$166
Jun 202413878.082.63$178
May 202414278.812.20$171
Apr 202414084.451.66$151
Mar 202414480.301.55$148
Feb 202414276.091.78$151
Jan 202414773.023.30$228
Dec 202314771.262.61$194
Nov 202313577.892.81$176
Oct 202304385.443.09$133
Sep 202314489.042.74$209
Aug 202304780.522.67$126
Jul 202304974.852.64$129
Jun 202304768.962.26$106
May 202314970.622.23$180
Apr 202314878.122.24$186
Mar 202314972.852.39$190
Feb 202304575.112.47$111
Jan 202305176.533.39$173
Dec 202205176.415.73$292
Nov 202215285.005.65$379
Oct 202205387.185.86$311
Sep 202214984.888.16$485
Aug 202215194.529.13$560
Jul 2022052101.587.54$392
Jun 2022050115.097.98$399
May 2022072109.378.43$607
Apr 2022040104.226.84$274
Mar 2022032108.885.08$162
Feb 202203091.054.86$146
Jan 202203381.844.54$150
Dec 202103571.323.90$136
Nov 202103577.435.24$183
Oct 202103679.795.71$206
Sep 202103469.865.35$182
Aug 202103566.024.22$148
Jul 202103670.783.98$143
Jun 202103969.493.38$132
May 202114263.483.02$190
Apr 202104160.362.76$113
Mar 202104361.302.72$117
Feb 202103657.805.55$200
Jan 202104150.412.81$115
Dec 202004744.642.68$126
Nov 202004938.772.71$133
Oct 202004836.972.48$119
Sep 202004437.091.99$88
Aug 202004639.982.39$110
Jul 202004738.371.83$86
Jun 202004934.901.69$83
May 2020014016.921.81$254
Apr 2020010614.751.80$191
Mar 202003230.341.86$59
Feb 202007449.881.98$147
Jan 202008157.252.09$170
Dec 201908259.012.30$189
Nov 201908055.302.75$220
Oct 201908253.472.42$198
Sep 201907955.052.66$210
Aug 201908853.112.30$203
Jul 201908856.272.46$216
Jun 201908852.782.49$219
May 201909258.482.74$252
Apr 201909062.632.75$248
Mar 201909356.803.06$285
Feb 201908650.852.79$240
Jan 201929746.033.23$405
Dec 201819846.594.19$457
Nov 201829652.934.24$513
Oct 2018110161.443.40$405
Sep 2018110059.543.11$370
Aug 2018110459.403.07$378
Jul 2018110665.142.93$376
Jun 2018210460.183.08$440
May 2018210965.382.90$447
Apr 2018210863.842.90$441
Mar 2018111361.222.79$376
Feb 2018210561.782.77$414
Jan 2018211862.874.01$599
Dec 2017212057.272.92$465
Nov 2017111655.423.12$417
Oct 2017312449.292.98$518
Sep 2017212247.523.09$472
Aug 2017212945.373.00$478
Jul 2017113243.873.09$451
Jun 2017212942.493.09$483
May 2017213245.373.26$522
Apr 2017213047.933.21$513
Mar 2017213946.772.98$508
Feb 2017212850.452.95$479
Jan 2017314549.413.42$644
Dec 2016114948.763.72$603
Nov 2016214742.492.64$474
Oct 2016215646.193.09$574
Sep 2016215641.553.10$567
Aug 2016316541.442.92$607
Jul 2016317341.622.92$631
Jun 2016117745.352.69$521
May 2016419542.521.99$558
Apr 2016320836.561.99$524
Mar 2016332733.011.79$686
Feb 2016126826.472.06$580
Jan 201628827.352.36$263
Dec 2015214032.362.00$345
Nov 2015214738.792.17$396
Oct 2015213443.552.43$412
Sep 2015311042.992.76$432
Aug 2015119840.162.87$609
Jul 2015220748.152.95$706
Jun 2015023756.152.88$683
May 2015025955.212.96$765
Apr 2015131149.822.71$892
Mar 2015020042.892.93$587
Feb 2015020244.662.98$601
Jan 2015026343.433.10$815
Dec 2014029554.693.59$1,059
Nov 2014029270.464.25$1,242
Oct 2014031178.303.90$1,213
Sep 2014030486.164.05$1,230
Aug 2014032189.394.04$1,295
Jul 2014032496.564.18$1,354
Jun 2014032298.164.74$1,525
May 2014032494.734.73$1,531
Apr 2014031795.944.81$1,524
Mar 2014032195.895.06$1,623
Feb 2014030297.406.19$1,870
Jan 2014027890.404.86$1,351
Dec 2013023391.824.35$1,015
Nov 2013028988.853.74$1,080
Oct 2013029097.423.78$1,096
Sep 20130220104.113.72$818
Aug 20130193104.253.52$680
Jul 20130130102.523.72$483
Jun 2013018794.403.93$736
May 2013034394.834.15$1,423
Apr 2013034893.964.28$1,490
Mar 2013035993.623.91$1,405
Feb 2013031691.233.42$1,081
Jan 2013025691.603.42$876
Dec 2012038386.773.42$1,310
Nov 2012037286.953.62$1,348
Oct 2012040489.383.40$1,373
Sep 2012039394.672.92$1,147
Aug 2012042592.662.91$1,236
Jul 2012041985.133.02$1,266
Jun 2012042479.822.52$1,068
May 2012043891.612.49$1,090
Apr 20120419101.652.00$837
Mar 20120456105.052.22$1,013
Feb 20120427101.102.57$1,097
Jan 2012045598.092.73$1,244
Dec 2011047596.873.24$1,539
Nov 2011047695.723.31$1,576
Oct 2011051684.983.65$1,883
Sep 2011052583.623.99$2,093
Aug 2011056783.404.15$2,353
Jul 2011058794.144.52$2,652
Jun 2011060692.904.64$2,812
May 2011058798.134.40$2,586
Apr 20110443105.964.33$1,920
Mar 2011048496.364.06$1,964
Feb 2011043085.644.18$1,797
Jan 2011035986.504.59$1,647
Dec 2010023985.734.35$1,039
Nov 2010011680.843.80$440

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   36 Mcf  × $  3.05 =       $110

────────────────────────────────────────────────────
Month total                                     $110

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/260616 is the state's own key, not one this site invented.