SHURLEY RR 2A

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 260919District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$104 k
Dec 2010 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
186
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112011-10-10203787
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition19 bbl$830
GasProduction29,569 Mcf$103,386
Total$104,216

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4235, -100.7556. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42353, -100.75562 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,422 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,422 ft.

Completions filed
Dec 2010
1 of 1 wells

1 well

42-4353933687,422 ftDec 2010

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (186)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

186 months

May 2026042106.413.05$128
Apr 202604298.932.87$121
Mar 202604589.753.15$142
Feb 202604563.503.75$169
Jan 202604759.138.00$376
Dec 202504656.664.41$203
Nov 202504558.593.93$177
Oct 202504659.383.30$152
Sep 202504462.743.08$135
Aug 202504463.933.01$133
Jul 202504366.743.32$143
Jun 202504466.483.13$138
May 202504860.553.23$155
Apr 202504762.363.54$167
Mar 202504967.704.27$209
Feb 202504470.884.34$191
Jan 202505074.324.28$214
Dec 202405068.993.12$156
Nov 202404969.052.20$108
Oct 202405171.372.28$116
Sep 202405269.612.36$123
Aug 202405575.632.06$114
Jul 202405379.932.15$114
Jun 202404778.082.63$124
May 202405078.812.20$110
Apr 202404184.451.66$68
Mar 202402780.301.55$42
Feb 202402976.091.78$52
Jan 202403873.023.30$125
Dec 202305271.262.61$136
Nov 2023011577.892.81$323
Oct 20230085.443.09$0
Sep 202302689.042.74$71
Aug 202303080.522.67$80
Jul 202303074.852.64$79
Jun 202304068.962.26$90
May 202309570.622.23$212
Apr 20230478.122.24$9
Mar 202303972.852.39$93
Feb 202303575.112.47$86
Jan 202303876.533.39$129
Dec 202204376.415.73$246
Nov 202205085.005.65$282
Oct 202205087.185.86$293
Sep 202204284.888.16$343
Aug 202203894.529.13$347
Jul 2022043101.587.54$324
Jun 2022045115.097.98$359
May 2022045109.378.43$379
Apr 2022042104.226.84$287
Mar 2022047108.885.08$239
Feb 202204791.054.86$228
Jan 202206181.844.54$277
Dec 202106071.323.90$234
Nov 202105877.435.24$304
Oct 202104779.795.71$269
Sep 202104269.865.35$225
Aug 202103466.024.22$144
Jul 202102970.783.98$115
Jun 202106669.493.38$223
May 202109363.483.02$281
Apr 202108960.362.76$246
Mar 202106061.302.72$163
Feb 202106157.805.55$338
Jan 202106250.412.81$174
Dec 202006344.642.68$169
Nov 202006138.772.71$165
Oct 202006436.972.48$159
Sep 202006337.091.99$125
Aug 202006739.982.39$160
Jul 202006738.371.83$122
Jun 202006734.901.69$113
May 2020042616.921.81$773
Apr 202007314.751.80$132
Mar 202007630.341.86$141
Feb 202005649.881.98$111
Jan 202005757.252.09$119
Dec 201903159.012.30$71
Nov 201903255.302.75$88
Oct 201904753.472.42$114
Sep 201904955.052.66$130
Aug 201904653.112.30$106
Jul 201906056.272.46$148
Jun 201904952.782.49$122
May 201902558.482.74$69
Apr 201905562.632.75$151
Mar 201904256.803.06$129
Feb 201904150.852.79$114
Jan 201906946.033.23$223
Dec 201803046.594.19$126
Nov 201807052.934.24$297
Oct 201803161.443.40$105
Sep 201804659.543.11$143
Aug 20180059.403.07$0
Jul 201802965.142.93$85
Jun 201802160.183.08$65
May 201803465.382.90$99
Apr 201803063.842.90$87
Mar 201802561.222.79$70
Feb 201801661.782.77$44
Jan 20180362.874.01$12
Dec 201706057.272.92$175
Nov 201701655.423.12$50
Oct 20171249.292.98$55
Sep 2017014947.523.09$460
Aug 201709745.373.00$291
Jul 2017017043.873.09$525
Jun 2017019342.493.09$596
May 2017015445.373.26$503
Apr 2017117847.933.21$620
Mar 2017118446.772.98$596
Feb 2017016450.452.95$484
Jan 2017018049.413.42$615
Dec 2016118448.763.72$734
Nov 2016018442.492.64$487
Oct 2016118546.193.09$618
Sep 2016118441.553.10$612
Aug 2016019841.442.92$579
Jul 2016119441.622.92$609
Jun 2016019045.352.69$510
May 2016119642.521.99$433
Apr 2016119136.561.99$417
Mar 2016020133.011.79$361
Feb 2016018426.472.06$380
Jan 2016119427.352.36$486
Dec 2015119532.362.00$423
Nov 2015118838.792.17$446
Oct 2015018043.552.43$437
Sep 2015114142.992.76$432
Aug 2015122140.162.87$675
Jul 2015123048.152.95$726
Jun 2015022956.152.88$660
May 2015023355.212.96$689
Apr 2015423649.822.71$838
Mar 2015024642.892.93$722
Feb 2015022744.662.98$676
Jan 2015025843.433.10$800
Dec 2014024654.693.59$883
Nov 2014022970.464.25$974
Oct 2014024778.303.90$964
Sep 2014024586.164.05$991
Aug 2014026789.394.04$1,077
Jul 2014028196.564.18$1,174
Jun 2014011898.164.74$559
May 2014029794.734.73$1,404
Apr 2014014195.944.81$678
Mar 2014018695.895.06$941
Feb 2014024997.406.19$1,542
Jan 2014028290.404.86$1,371
Dec 2013028191.824.35$1,224
Nov 2013027388.853.74$1,021
Oct 2013028997.423.78$1,092
Sep 20130285104.113.72$1,060
Aug 20130300104.253.52$1,057
Jul 20130306102.523.72$1,138
Jun 2013030194.403.93$1,184
May 2013031794.834.15$1,315
Apr 2013031693.964.28$1,353
Mar 2013032293.623.91$1,260
Feb 2013021791.233.42$742
Jan 2013027991.603.42$954
Dec 2012024986.773.42$852
Nov 2012025986.953.62$939
Oct 2012032189.383.40$1,091
Sep 2012036794.672.92$1,071
Aug 2012037992.662.91$1,102
Jul 2012038885.133.02$1,172
Jun 2012038579.822.52$970
May 2012040491.612.49$1,005
Apr 20120396101.652.00$791
Mar 20120421105.052.22$936
Feb 20120397101.102.57$1,020
Jan 2012044998.092.73$1,228
Dec 2011046396.873.24$1,500
Nov 2011046595.723.31$1,540
Oct 2011050584.983.65$1,843
Sep 2011051083.623.99$2,033
Aug 2011055383.404.15$2,295
Jul 2011057894.144.52$2,611
Jun 2011055292.904.64$2,561
May 2011057998.134.40$2,550
Apr 20110625105.964.33$2,708
Mar 2011072396.364.06$2,933
Feb 2011054685.644.18$2,282
Jan 201101,07686.504.59$4,938
Dec 2010019785.734.35$857

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   42 Mcf  × $  3.05 =       $128

────────────────────────────────────────────────────
Month total                                     $128

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/260919 is the state's own key, not one this site invented.