FISHER 132

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 264682District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$100 k
Dec 2011 – May 2026
Value, last 12 filed months
$723
at the published price for each month
Months reported
174
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112012-12-20207349
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7 bbl$440
GasProduction32,721 Mcf$99,600
Total$100,039

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5575, -100.7514. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.55747, -100.75140 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,858 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,858 ft.

Completions filed
Dec 2011
1 of 1 wells

1 well

42-4353937137,858 ftDec 2011

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (174)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

174 months

May 2026010106.413.05$30
Apr 202601298.932.87$34
Mar 202601589.753.15$47
Feb 202601463.503.75$53
Jan 202601859.138.00$144
Dec 202501756.664.41$75
Nov 202501658.593.93$63
Oct 202501659.383.30$53
Sep 202502262.743.08$68
Aug 202502663.933.01$78
Jul 202501166.743.32$36
Jun 202501366.483.13$41
May 202501160.553.23$36
Apr 20250362.363.54$11
Mar 20250667.704.27$26
Feb 20250670.884.34$26
Jan 20250874.324.28$34
Dec 20240668.993.12$19
Nov 20240869.052.20$18
Oct 202401671.372.28$37
Sep 202401569.612.36$35
Aug 202401775.632.06$35
Jul 202401779.932.15$36
Jun 202401778.082.63$45
May 202401878.812.20$40
Apr 202401784.451.66$28
Mar 202401980.301.55$29
Feb 202401676.091.78$29
Jan 202401973.023.30$63
Dec 202301971.262.61$50
Nov 202301977.892.81$53
Oct 202301885.443.09$56
Sep 202301889.042.74$49
Aug 202301880.522.67$48
Jul 202301974.852.64$50
Jun 202302068.962.26$45
May 202301170.622.23$25
Apr 202301878.122.24$40
Mar 202301972.852.39$45
Feb 202301875.112.47$44
Jan 202302076.533.39$68
Dec 202202376.415.73$132
Nov 202202285.005.65$124
Oct 202201487.185.86$82
Sep 202202184.888.16$171
Aug 202202194.529.13$192
Jul 2022021101.587.54$158
Jun 2022021115.097.98$168
May 2022022109.378.43$186
Apr 2022035104.226.84$239
Mar 202201108.885.08$5
Feb 202202291.054.86$107
Jan 202202481.844.54$109
Dec 202102671.323.90$101
Nov 202102577.435.24$131
Oct 202102579.795.71$143
Sep 202102169.865.35$112
Aug 202102266.024.22$93
Jul 202102970.783.98$115
Jun 202101569.493.38$51
May 202102563.483.02$75
Apr 202102660.362.76$72
Mar 202102861.302.72$76
Feb 202102157.805.55$117
Jan 202102750.412.81$76
Dec 202002844.642.68$75
Nov 202002738.772.71$73
Oct 202002736.972.48$67
Sep 202002537.091.99$50
Aug 202002639.982.39$62
Jul 202002538.371.83$46
Jun 202002734.901.69$46
May 202002816.921.81$51
Apr 202002914.751.80$52
Mar 202003130.341.86$58
Feb 202002949.881.98$57
Jan 202003357.252.09$69
Dec 201903559.012.30$81
Nov 201902655.302.75$72
Oct 201903753.472.42$89
Sep 201904255.052.66$112
Aug 201903253.112.30$74
Jul 201903156.272.46$76
Jun 201903252.782.49$80
May 201903458.482.74$93
Apr 201902862.632.75$77
Mar 201903456.803.06$104
Feb 201903250.852.79$89
Jan 201903546.033.23$113
Dec 201803746.594.19$155
Nov 201803652.934.24$153
Oct 201803761.443.40$126
Sep 201803659.543.11$112
Aug 201803559.403.07$107
Jul 201803565.142.93$103
Jun 201803560.183.08$108
May 201804265.382.90$122
Apr 201804363.842.90$125
Mar 201804461.222.79$123
Feb 201804161.782.77$113
Jan 201804362.874.01$172
Dec 201705057.272.92$146
Nov 201704955.423.12$153
Oct 201704849.292.98$143
Sep 201704847.523.09$148
Aug 201705245.373.00$156
Jul 201705143.873.09$157
Jun 201705142.493.09$157
May 201705745.373.26$186
Apr 201705747.933.21$183
Mar 201706146.772.98$182
Feb 201705850.452.95$171
Jan 201716649.413.42$275
Dec 201606348.763.72$235
Nov 201606742.492.64$177
Oct 201607146.193.09$219
Sep 201607041.553.10$217
Aug 201607741.442.92$225
Jul 201608141.622.92$237
Jun 201607945.352.69$212
May 201608242.521.99$163
Apr 201617836.561.99$192
Mar 201608433.011.79$151
Feb 201607526.472.06$155
Jan 2016110627.352.36$278
Dec 2015010632.362.00$212
Nov 201504538.792.17$98
Oct 2015111843.552.43$330
Sep 2015026042.992.76$717
Aug 2015014040.162.87$402
Jul 2015020148.152.95$592
Jun 201506256.152.88$179
May 2015023655.212.96$697
Apr 2015035749.822.71$966
Mar 2015014442.892.93$423
Feb 201502544.662.98$74
Jan 2015010643.433.10$329
Dec 2014018854.693.59$675
Nov 2014047570.464.25$2,020
Oct 201405578.303.90$215
Sep 2014013986.164.05$562
Aug 2014015289.394.04$613
Jul 2014015696.564.18$652
Jun 2014016298.164.74$767
May 2014017294.734.73$813
Apr 2014021795.944.81$1,044
Mar 2014019795.895.06$996
Feb 2014024897.406.19$1,536
Jan 2014019690.404.86$953
Dec 2013054591.824.35$2,373
Nov 2013016188.853.74$602
Oct 2013039297.423.78$1,482
Sep 20130447104.113.72$1,662
Aug 20130536104.253.52$1,888
Jul 20130479102.523.72$1,781
Jun 2013054894.403.93$2,156
May 2013161594.834.15$2,647
Apr 2013263493.964.28$2,903
Mar 2013069693.623.91$2,723
Feb 2013067991.233.42$2,322
Jan 2013081891.603.42$2,797
Dec 2012086386.773.42$2,952
Nov 2012084186.953.62$3,049
Oct 201201,17989.383.40$4,008
Sep 201201,05094.672.92$3,064
Aug 2012098292.662.91$2,856
Jul 201201,21385.133.02$3,664
Jun 201201,45279.822.52$3,658
May 201201,88091.612.49$4,678
Apr 201203,135101.652.00$6,260
Mar 201205,478105.052.22$12,173
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   10 Mcf  × $  3.05 =        $30

────────────────────────────────────────────────────
Month total                                      $30

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/264682 is the state's own key, not one this site invented.