Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 268249District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$147 k
Mar 2012 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
171
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112013-07-02210466
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition231 bbl$18,722
GasProduction40,004 Mcf$128,411
Total$147,133

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.8305, -100.8927. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.83054, -100.89270 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,400 ft.

Completions filed
Mar 2012
1 of 1 wells

1 well

42-4133281658,400 ftMar 2012

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (171)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

171 months

May 202600106.413.05$0
Apr 2026014298.932.87$408
Mar 2026015789.753.15$494
Feb 2026014463.503.75$540
Jan 2026016159.138.00$1,288
Dec 2025016556.664.41$728
Nov 2025017958.593.93$703
Oct 2025017559.383.30$578
Sep 2025017762.743.08$545
Aug 2025019063.933.01$573
Jul 202507066.743.32$232
Jun 2025015466.483.13$482
May 2025015160.553.23$488
Apr 2025014962.363.54$528
Mar 2025015567.704.27$662
Feb 2025014170.884.34$612
Jan 2025015474.324.28$659
Dec 2024015668.993.12$487
Nov 2024014769.052.20$323
Oct 2024015871.372.28$360
Sep 2024013969.612.36$329
Aug 2024014775.632.06$303
Jul 2024016379.932.15$350
Jun 2024015278.082.63$400
May 2024015778.812.20$345
Apr 2024015384.451.66$254
Mar 2024016280.301.55$250
Feb 2024015176.091.78$269
Jan 2024015973.023.30$524
Dec 2023016671.262.61$433
Nov 2023015077.892.81$421
Oct 2023015885.443.09$488
Sep 2023012689.042.74$345
Aug 2023013180.522.67$350
Jul 2023013774.852.64$362
Jun 2023013968.962.26$314
May 2023015070.622.23$334
Apr 2023011478.122.24$255
Mar 202308872.852.39$211
Feb 202309175.112.47$224
Jan 202308276.533.39$278
Dec 202204276.415.73$241
Nov 202205185.005.65$288
Oct 202218987.185.86$609
Sep 202204784.888.16$384
Aug 202217294.529.13$752
Jul 2022173101.587.54$652
Jun 2022278115.097.98$852
May 20223104109.378.43$1,205
Apr 2022158104.226.84$501
Mar 2022085108.885.08$431
Feb 2022210491.054.86$687
Jan 2022015181.844.54$685
Dec 2021015471.323.90$600
Nov 202103277.435.24$168
Oct 2021011779.795.71$669
Sep 202105569.865.35$294
Aug 2021012166.024.22$511
Jul 202104870.783.98$191
Jun 202109069.493.38$304
May 202118463.483.02$317
Apr 2021011560.362.76$317
Mar 2021015661.302.72$424
Feb 202103857.805.55$211
Jan 2021013750.412.81$385
Dec 2020015544.642.68$415
Nov 2020013238.772.71$357
Oct 202005736.972.48$141
Sep 2020012737.091.99$253
Aug 2020021439.982.39$510
Jul 2020020638.371.83$376
Jun 2020036834.901.69$622
May 20200016.921.81$0
Apr 2020013814.751.80$249
Mar 202006730.341.86$124
Feb 2020017949.881.98$355
Jan 2020019557.252.09$408
Dec 2019019459.012.30$447
Nov 2019018755.302.75$514
Oct 2019020253.472.42$489
Sep 2019021155.052.66$561
Aug 2019019653.112.30$452
Jul 2019019856.272.46$487
Jun 2019018952.782.49$471
May 2019120058.482.74$607
Apr 2019119562.632.75$599
Mar 2019120456.803.06$681
Feb 2019018550.852.79$517
Jan 2019020246.033.23$652
Dec 2018020946.594.19$875
Nov 2018020252.934.24$856
Oct 2018021461.443.40$727
Sep 2018021659.543.11$671
Aug 2018022659.403.07$693
Jul 2018023165.142.93$677
Jun 2018014660.183.08$449
May 2018020065.382.90$580
Apr 2018018363.842.90$531
Mar 2018119861.222.79$613
Feb 2018018261.782.77$503
Jan 2018120662.874.01$889
Dec 2017120957.272.92$668
Nov 2017120155.423.12$682
Oct 2017220949.292.98$722
Sep 2017119447.523.09$646
Aug 2017121045.373.00$676
Jul 2017121443.873.09$705
Jun 2017120542.493.09$675
May 2017121245.373.26$737
Apr 2017120747.933.21$713
Mar 2017121746.772.98$694
Feb 2017119950.452.95$638
Jan 2017122249.413.42$808
Dec 2016222248.763.72$924
Nov 2016121842.492.64$619
Oct 2016123046.193.09$757
Sep 2016122541.553.10$739
Aug 2016123141.442.92$717
Jul 2016123341.622.92$723
Jun 2016122845.352.69$658
May 2016123642.521.99$512
Apr 2016223436.561.99$539
Mar 2016124233.011.79$467
Feb 2016122426.472.06$489
Jan 2016124327.352.36$602
Dec 2015225232.362.00$569
Nov 2015222938.792.17$574
Oct 2015226543.552.43$730
Sep 2015125942.992.76$757
Aug 2015125440.162.87$770
Jul 2015229248.152.95$956
Jun 2015228856.152.88$943
May 2015329855.212.96$1,046
Apr 2015227749.822.71$849
Mar 2015330942.892.93$1,036
Feb 2015127944.662.98$875
Jan 2015130743.433.10$995
Dec 2014330754.693.59$1,267
Nov 2014231370.464.25$1,472
Oct 2014230178.303.90$1,331
Sep 2014320686.164.05$1,092
Aug 2014333589.394.04$1,620
Jul 2014233496.564.18$1,589
Jun 2014334198.164.74$1,910
May 2014231794.734.73$1,688
Apr 2014330695.944.81$1,759
Mar 2014333095.895.06$1,956
Feb 2014132397.406.19$2,097
Jan 2014133090.404.86$1,694
Dec 2013230491.824.35$1,507
Nov 2013331488.853.74$1,440
Oct 2013340697.423.78$1,827
Sep 20133400104.113.72$1,799
Aug 20132410104.253.52$1,653
Jul 20132460102.523.72$1,915
Jun 2013243294.403.93$1,888
May 2013236294.834.15$1,692
Apr 2013341993.964.28$2,076
Mar 2013134493.623.91$1,440
Feb 2013343991.233.42$1,775
Jan 2013453691.603.42$2,199
Dec 2012559486.773.42$2,465
Nov 2012459586.953.62$2,505
Oct 2012866089.383.40$2,959
Sep 2012667794.672.92$2,544
Aug 20121378892.662.91$3,496
Jul 20121386985.133.02$3,732
Jun 20121498279.822.52$3,591
May 2012231,22291.612.49$5,148
Apr 2012181,665101.652.00$5,154
Mar 20123254105.052.22$880

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                  142 Mcf  × $  2.87 =       $408

────────────────────────────────────────────────────
Month total                                     $408

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/268249 is the state's own key, not one this site invented.