UNIVERSITY 42

Operated by ZARVONA ENERGY LLC (P-5 950523) in the HOLT RANCH (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 280960District 7CField 42341300CondensateGasSaveExport
Value, all time
$108 k
Jun 2016 – May 2026
Value, last 12 filed months
$19 k
at the published price for each month
Months reported
120
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 281 leases and 612 wells, and the rule below applies to all of them.

Discovered
2010-04-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2014-03-25.

The Commission's schedule remark for this field reads: PER DKT 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition912 bbl$60,961
GasProduction16,598 Mcf$46,870
Total$107,832

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.9341, -101.1929. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.93408, -101.19289 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,025 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,025 ft.

Completions filed
Jun 2010
1 of 1 wells

1 well

42-1054109114078,025 ftJun 2010

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (120)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

120 months

May 20260171106.413.05$521
Apr 202608698.932.87$247
Mar 20261778289.753.15$16,144
Feb 202606163.503.75$229
Jan 202603859.138.00$304
Dec 202508856.664.41$388
Nov 202506258.593.93$243
Oct 202508459.383.30$278
Sep 202508462.743.08$258
Aug 202509563.933.01$286
Jul 202506966.743.32$229
Jun 202509066.483.13$282
May 202507260.553.23$233
Apr 202507462.363.54$262
Mar 202509967.704.27$423
Feb 202506070.884.34$260
Jan 202505574.324.28$235
Dec 202405568.993.12$172
Nov 202407969.052.20$174
Oct 202409871.372.28$224
Sep 20241596169.612.36$11,212
Aug 202409175.632.06$188
Jul 202408279.932.15$176
Jun 202409478.082.63$248
May 2024014978.812.20$328
Apr 202408484.451.66$139
Mar 2024077380.301.55$1,194
Feb 2024056176.091.78$1,001
Jan 202401,11373.023.30$3,670
Dec 2023090871.262.61$2,371
Nov 2023085777.892.81$2,406
Oct 2023060085.443.09$1,852
Sep 202305689.042.74$153
Aug 202306480.522.67$171
Jul 2023036974.852.64$975
Jun 202301,16568.962.26$2,631
May 202311539270.622.23$8,994
Apr 2023042778.122.24$956
Mar 202307972.852.39$189
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210269.493.38$7
May 202101263.483.02$36
Apr 202104060.362.76$110
Mar 202102261.302.72$60
Feb 202103957.805.55$216
Jan 202102250.412.81$62
Dec 20200044.642.68$0
Nov 202004338.772.71$116
Oct 20200036.972.48$0
Sep 20200137.091.99$2
Aug 20200239.982.39$5
Jul 202002838.371.83$51
Jun 20200334.901.69$5
May 20200016.921.81$0
Apr 202001614.751.80$29
Mar 202005430.341.86$100
Feb 202003849.881.98$75
Jan 202003657.252.09$75
Dec 201909959.012.30$228
Nov 201908955.302.75$245
Oct 201903553.472.42$85
Sep 201902855.052.66$74
Aug 201903453.112.30$78
Jul 201902356.272.46$57
Jun 20191003152.782.49$5,355
May 201905258.482.74$143
Apr 201905462.632.75$149
Mar 2019307356.803.06$1,928
Feb 2019010350.852.79$288
Jan 2019012646.033.23$407
Dec 2018317346.594.19$1,750
Nov 20187714452.934.24$4,686
Oct 2018012661.443.40$428
Sep 2018011259.543.11$348
Aug 20187911959.403.07$5,058
Jul 2018012665.142.93$369
Jun 201811913060.183.08$7,561
May 2018013165.382.90$380
Apr 2018011863.842.90$342
Mar 20182514361.222.79$1,929
Feb 201809861.782.77$271
Jan 2018020962.874.01$838
Dec 201706657.272.92$193
Nov 201704955.423.12$153
Oct 201707849.292.98$233
Sep 201709047.523.09$278
Aug 201705045.373.00$150
Jul 201705343.873.09$164
Jun 201705342.493.09$164
May 201703245.373.26$104
Apr 201702147.933.21$67
Mar 201708546.772.98$254
Feb 2017010450.452.95$307
Jan 2017043849.413.42$1,497
Dec 2016053648.763.72$1,995
Nov 2016039642.492.64$1,047
Oct 2016049946.193.09$1,542
Sep 2016046041.553.10$1,426
Aug 2016049341.442.92$1,442
Jul 2016048541.622.92$1,418
Jun 2016044945.352.69$1,206

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  171 Mcf  × $  3.05 =       $521

────────────────────────────────────────────────────
Month total                                     $521

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/280960 is the state's own key, not one this site invented.