COUCH "C"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA, NE. (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 35474District 7CField 67998075NGPA filingCondensateGasSaveExport
Value, all time
$148 k
Jan 1993 – May 2026
Value, last 12 filed months
$284
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 800 leases and 804 wells, and the rule below applies to all of them.

Discovered
1995-10-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-02-27.

The Commission's schedule remark for this field reads: 38. DOCKET 7C-0214353 EFF 2/27/97 SIGNED 2/4/97

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$253
GasProduction52,135 Mcf$147,399
Total$147,653

15,282 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6382, -101.3280. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.63817, -101.32804 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,100 ft.

Completions filed
Feb 1965
1 of 1 wells

1 well

42-1051007927,100 ftFeb 1965

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260398.932.87$9
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 202603159.138.00$248
Dec 20250056.664.41$0
Nov 20250258.593.93$8
Oct 20250259.383.30$7
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250266.743.32$7
Jun 20250266.483.13$6
May 20250460.553.23$13
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 202433584.451.66$311
Mar 202408180.301.55$125
Feb 202407976.091.78$141
Jan 202407873.023.30$257
Dec 202308771.262.61$227
Nov 202308177.892.81$227
Oct 202307085.443.09$216
Sep 202308189.042.74$222
Aug 202308180.522.67$217
Jul 202308974.852.64$235
Jun 202307968.962.26$178
May 202308170.622.23$180
Apr 202308778.122.24$195
Mar 202309172.852.39$218
Feb 202309175.112.47$224
Jan 2023013476.533.39$454
Dec 202208876.415.73$504
Nov 202204785.005.65$265
Oct 202207887.185.86$457
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210263.483.02$6
Apr 20210060.362.76$0
Mar 20210861.302.72$22
Feb 202102057.805.55$111
Jan 202109950.412.81$278
Dec 202004044.642.68$107
Nov 202007338.772.71$198
Oct 2020010536.972.48$260
Sep 202004637.091.99$92
Aug 202006139.982.39$145
Jul 202006238.371.83$113
Jun 202006034.901.69$101
May 202004116.921.81$74
Apr 202007114.751.80$128
Mar 202008730.341.86$161
Feb 202008249.881.98$162
Jan 202009457.252.09$197
Dec 201909159.012.30$210
Nov 201908055.302.75$220
Oct 201909153.472.42$220
Sep 201908055.052.66$213
Aug 201909153.112.30$210
Jul 201909356.272.46$229
Jun 201908352.782.49$207
May 2019013158.482.74$359
Apr 20190462.632.75$11
Mar 201909356.803.06$285
Feb 201908450.852.79$235
Jan 2019013046.033.23$420
Dec 20180046.594.19$0
Nov 201808452.934.24$356
Oct 201808361.443.40$282
Sep 201809659.543.11$298
Aug 201809859.403.07$301
Jul 201808465.142.93$246
Jun 201809760.183.08$298
May 201809665.382.90$278
Apr 201808463.842.90$244
Mar 201809961.222.79$276
Feb 201807361.782.77$202
Jan 201809562.874.01$381
Dec 201709557.272.92$278
Nov 201709555.423.12$296
Oct 201709749.292.98$289
Sep 201709947.523.09$306
Aug 201708645.373.00$258
Jul 2017010643.873.09$327
Jun 201709942.493.09$306
May 2017010045.373.26$326
Apr 2017010847.933.21$347
Mar 2017014846.772.98$442
Feb 2017018650.452.95$549
Jan 20170049.413.42$0
Dec 201607348.763.72$272
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 201607441.553.10$229
Aug 201608841.442.92$257
Jul 201608941.622.92$260
Jun 2016010145.352.69$271
May 201608842.521.99$175
Apr 2016010036.561.99$199
Mar 201608833.011.79$158
Feb 201609826.472.06$202
Jan 201608627.352.36$203
Dec 2015010032.362.00$200
Nov 201508738.792.17$189
Oct 2015010043.552.43$243
Sep 201508742.992.76$240
Aug 201509840.162.87$282
Jul 201508648.152.95$253
Jun 2015013556.152.88$389
May 201505455.212.96$160
Apr 2015010349.822.71$279
Mar 2015010842.892.93$317
Feb 2015010144.662.98$301
Jan 2015010343.433.10$319
Dec 2014010254.693.59$366
Nov 2014010670.464.25$451
Oct 2014010778.303.90$417
Sep 2014011586.164.05$465
Aug 201406889.394.04$274
Jul 201401596.564.18$63
Jun 201406398.164.74$298
May 2014018594.734.73$874
Apr 20140395.944.81$14
Mar 20140595.895.06$25
Feb 20140697.406.19$37
Jan 201402990.404.86$141
Dec 201303991.824.35$170
Nov 201306288.853.74$232
Oct 201306597.423.78$246
Sep 2013080104.113.72$297
Aug 20130101104.253.52$356
Jul 2013096102.523.72$357
Jun 201309494.403.93$370
May 201309894.834.15$407
Apr 201309693.964.28$411
Mar 201309393.623.91$364
Feb 201308691.233.42$294
Jan 2013010191.603.42$345
Dec 2012010086.773.42$342
Nov 2012010086.953.62$363
Oct 2012010689.383.40$360
Sep 2012010394.672.92$301
Aug 2012011292.662.91$326
Jul 2012010785.133.02$323
Jun 2012010679.822.52$267
May 2012011291.612.49$279
Apr 20120106101.652.00$212
Mar 20120105105.052.22$233
Feb 20120108101.102.57$278
Jan 2012010798.092.73$293
Dec 2011011496.873.24$369
Nov 2011010695.723.31$351
Oct 2011010584.983.65$383
Sep 2011010783.623.99$426
Aug 2011011983.404.15$494
Jul 2011011394.144.52$510
Jun 2011011192.904.64$515
May 2011013498.134.40$590
Apr 2011089105.964.33$386
Mar 2011010996.364.06$442
Feb 2011010585.644.18$439
Jan 2011011586.504.59$528
Dec 2010011585.734.35$500
Nov 2010012080.843.80$455
Oct 2010012378.103.51$432
Sep 2010012072.633.98$478
Aug 2010011373.684.42$499
Jul 2010010972.554.74$516
Jun 2010010670.364.91$521
May 2010011471.124.24$483
Apr 2010010681.694.12$437
Mar 2010011178.394.39$487
Feb 2010010173.585.44$550
Jan 2010011974.365.96$710
Dec 2009010771.445.48$587
Nov 2009010674.593.75$398
Oct 2009011572.544.11$473
Sep 2009010965.543.06$334
Aug 2009010967.423.22$351
Jul 2009013461.133.46$464
Jun 2009012466.163.90$483
May 2009012054.743.93$471
Apr 2009011246.773.59$402
Mar 2009012442.144.06$503
Feb 2009011132.814.63$514
Jan 2009011335.865.37$607
Dec 2008012937.105.98$771
Nov 2008013155.496.86$899
Oct 2008018175.246.92$1,253
Sep 2008085101.767.88$670
Aug 2008071114.228.48$602
Jul 20080153131.0811.39$1,743
Jun 20080135131.3313.03$1,759
May 2008038123.1711.57$440
Apr 2008055110.3110.45$575
Mar 20080117101.909.66$1,131
Feb 200807492.538.77$649
Jan 2008011790.388.21$960
Dec 200706088.337.30$438
Nov 200708191.677.29$591
Oct 2007010382.856.92$713
Sep 200709175.846.24$568
Aug 2007010269.066.39$652
Jul 2007011770.906.39$747
Jun 2007019262.007.55$1,449
May 200702958.747.85$228
Apr 200703259.617.81$250
Mar 200703156.927.30$226
Feb 200704755.108.22$386
Jan 200709650.306.73$646
Dec 2006012456.656.92$858
Nov 200603554.207.62$267
Oct 2006010654.906.01$637
Sep 2006010360.085.04$519
Aug 2006020068.717.34$1,468
Jul 200604269.376.34$266
Jun 200603766.286.38$236
May 200603166.016.42$199
Apr 200604964.397.36$361
Mar 200606756.707.08$475
Feb 2006023257.597.75$1,798
Jan 200602160.598.93$188
Dec 200502154.9413.42$282
Nov 200502254.6910.59$233
Oct 200502658.3413.80$359
Sep 200509961.4512.08$1,196
Aug 200504561.519.80$441
Jul 200507855.697.84$612
Jun 2005011352.337.38$834
May 200505745.226.65$379
Apr 200509149.207.36$670
Mar 2005013350.377.15$952
Feb 2005011945.226.31$751
Jan 2005013743.166.32$866
Dec 2004016039.866.75$1,080
Nov 2004011645.286.33$734
Oct 2004016849.706.52$1,095
Sep 2004018243.245.28$962
Aug 2004016442.375.55$910
Jul 2004018238.286.08$1,107
Jun 2004035036.106.43$2,252
May 2004014737.486.49$955
Apr 2004018734.475.86$1,096
Mar 2004017234.365.53$951
Feb 2004014232.455.51$782
Jan 2004016232.036.30$1,021
Dec 2003015830.266.30$996
Nov 2003019728.804.60$905
Oct 2003014528.174.76$690
Sep 2003017426.314.75$826
Aug 2003015629.765.13$800
Jul 2003016729.415.17$864
Jun 2003017728.565.98$1,059
May 2003018826.595.97$1,123
Apr 2003019726.675.41$1,065
Mar 2003020431.146.10$1,244
Feb 2003022533.487.93$1,783
Jan 2003018730.315.58$1,044
Dec 2002015326.914.85$743
Nov 2002020724.664.14$856
Oct 2002021426.464.23$905
Sep 2002016127.443.64$585
Aug 2002022225.963.16$702
Jul 2002021924.583.06$671
Jun 2002014923.733.34$497
May 2002018224.663.58$652
Apr 2002017823.653.51$625
Mar 2002016122.003.10$500
Feb 2002013418.222.38$318
Jan 200205617.172.38$133
Dec 200107116.932.36$168
Nov 200105418.072.41$130
Oct 200109219.782.53$233
Sep 200109224.262.25$207
Aug 200108024.873.05$244
Jul 2001011923.933.20$380
Jun 200105524.563.82$210
May 200108325.524.31$358
Apr 2001010524.685.34$560
Mar 200107324.545.38$392
Feb 200105127.755.77$294
Jan 2001017927.478.40$1,503
Dec 2000014226.889.12$1,295
Nov 2000013632.215.66$769
Oct 2000019631.235.15$1,009
Sep 200008031.875.19$415
Aug 2000019629.644.54$890
Jul 2000014028.534.09$573
Jun 2000013629.304.40$598
May 200008827.263.68$324
Apr 200007824.513.12$243
Mar 2000018028.422.86$515
Feb 2000016427.622.73$447
Jan 2000013925.272.48$345
Dec 1999022824.282.42$553
Nov 1999025023.192.43$609
Oct 1999016020.982.80$449
Sep 1999018921.752.62$495
Aug 1999024019.262.88$690
Jul 1999019217.892.37$456
Jun 1999021415.942.36$505
May 1999017715.792.32$411
Apr 1999016915.102.21$373
Mar 1999019412.471.84$357
Feb 199901689.981.82$305
Jan 1999023810.381.90$452
Dec 199801,0239.201.77$1,814
Nov 1998019310.892.19$422
Oct 1998019812.421.97$390
Sep 1998014712.592.08$306
Aug 1998020911.301.91$399
Jul 1998018911.742.24$423
Jun 1998022011.242.24$492
May 1998020312.622.21$448
Apr 1998023913.042.51$599
Mar 1998019112.802.31$441
Feb 1998020813.952.30$478
Jan 1998025014.702.15$539
Dec 1997023916.322.41$576
Nov 1997018018.193.09$556
Oct 1997023019.253.15$724
Sep 1997017117.742.95$505
Aug 1997016117.862.55$411
Jul 1997026817.582.25$602
Jun 1997029617.242.26$668
May 1997027318.972.31$630
Apr 1997028717.882.08$598
Mar 1997033018.951.94$640
Feb 1997020520.492.21$452
Jan 1997020123.483.54$711
Dec 1996030023.32$0
Nov 1996021821.97$0
Oct 1996029223.31$0
Sep 1996022222.22$0
Aug 1996025620.26$0
Jul 1996020119.55$0
Jun 1996019818.73$0
May 1996022619.43$0
Apr 1996026121.51$0
Mar 1996021819.38$0
Feb 1996028916.98$0
Jan 1996022517.07$0
Dec 1995019917.19$0
Nov 1995021216.00$0
Oct 1995027115.43$0
Sep 1995010116.18$0
Aug 1995019015.92$0
Jul 1995022715.24$0
Jun 1995023916.41$0
May 1995020517.56$0
Apr 1995025717.73$0
Mar 1995041216.44$0
Feb 1995027616.58$0
Jan 1995099615.92$0
Dec 1994049515.03$0
Nov 1994031415.90$0
Oct 1994026115.58$0
Sep 1994023815.29$0
Aug 1994023616.13$0
Jul 1994032017.56$0
Jun 1994033717.09$0
May 1994029215.88$0
Apr 1994033114.14$0
Mar 1994031212.46$0
Feb 1994045712.50$0
Jan 1994059912.66$0
Dec 1993032112.33$0
Nov 1993052514.49$0
Oct 1993035115.85$0
Sep 1993033115.03$0
Aug 1993031615.66$0
Jul 1993038015.46$0
Jun 1993045016.79$0
May 1993038817.68$0
Apr 1993032918.05$0
Mar 1993035618.14$0
Feb 1993028317.90$0
Jan 1993056916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    3 Mcf  × $  2.87 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/35474 is the state's own key, not one this site invented.