UNION PACIFIC

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 39393District 7CField 67995200NGPA filingGasSaveExport
Value, all time
$207 k
Jan 1993 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction66,816 Mcf$207,095
Total$207,095

18,369 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5690, -101.2917. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.56899, -101.29175 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,613 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,613 ft.

Completions filed
Jan 1966
1 of 1 wells

1 well

42-105106596 U9,613 ftJan 1966

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202655106.413.05$168
Apr 20264598.932.87$129
Mar 20266389.753.15$198
Feb 20267563.503.75$281
Jan 20267659.138.00$608
Dec 20258556.664.41$375
Nov 20258158.593.93$318
Oct 20257659.383.30$251
Sep 20258062.743.08$246
Aug 20258063.933.01$241
Jul 20256966.743.32$229
Jun 20258966.483.13$278
May 20258960.553.23$288
Apr 20258262.363.54$291
Mar 20258167.704.27$346
Feb 20257070.884.34$304
Jan 20257574.324.28$321
Dec 20248068.993.12$250
Nov 20248469.052.20$185
Oct 20249471.372.28$214
Sep 20246769.612.36$158
Aug 20248975.632.06$184
Jul 20249779.932.15$208
Jun 20247678.082.63$200
May 2024078.812.20$0
Apr 20243584.451.66$58
Mar 20249080.301.55$139
Feb 20248676.091.78$153
Jan 20248873.023.30$290
Dec 20239271.262.61$240
Nov 20238877.892.81$247
Oct 20238485.443.09$259
Sep 20238389.042.74$227
Aug 20238680.522.67$230
Jul 20238374.852.64$219
Jun 20238568.962.26$192
May 20239370.622.23$207
Apr 20239778.122.24$217
Mar 202310072.852.39$239
Feb 20238675.112.47$212
Jan 202310576.533.39$356
Dec 20229376.415.73$533
Nov 20229285.005.65$519
Oct 20227387.185.86$428
Sep 20222884.888.16$229
Aug 2022594.529.13$46
Jul 202237101.587.54$279
Jun 202245115.097.98$359
May 202238109.378.43$320
Apr 202288104.226.84$602
Mar 202295108.885.08$482
Feb 20226591.054.86$316
Jan 202210981.844.54$495
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021663.483.02$18
Apr 20211560.362.76$41
Mar 20211061.302.72$27
Feb 20211157.805.55$61
Jan 20215950.412.81$166
Dec 20205944.642.68$158
Nov 20205938.772.71$160
Oct 20206836.972.48$169
Sep 20206837.091.99$135
Aug 20206739.982.39$160
Jul 20205538.371.83$100
Jun 20205234.901.69$88
May 20207416.921.81$134
Apr 20207314.751.80$132
Mar 20206930.341.86$128
Feb 20206149.881.98$121
Jan 20207557.252.09$157
Dec 20197759.012.30$177
Nov 20197955.302.75$217
Oct 20197653.472.42$184
Sep 20197155.052.66$189
Aug 20198553.112.30$196
Jul 20198456.272.46$207
Jun 20198252.782.49$204
May 20199558.482.74$260
Apr 20195162.632.75$140
Mar 20198356.803.06$254
Feb 20197550.852.79$209
Jan 20198546.033.23$274
Dec 20189646.594.19$402
Nov 20188152.934.24$343
Oct 20189361.443.40$316
Sep 20189359.543.11$289
Aug 20189559.403.07$291
Jul 20189565.142.93$279
Jun 20188960.183.08$274
May 20189865.382.90$284
Apr 201810063.842.90$290
Mar 20188661.222.79$240
Feb 20189461.782.77$260
Jan 20189962.874.01$397
Dec 201710457.272.92$304
Nov 201711755.423.12$365
Oct 20179449.292.98$280
Sep 201710247.523.09$315
Aug 20179045.373.00$270
Jul 201711443.873.09$352
Jun 201710142.493.09$312
May 201712445.373.26$405
Apr 201711447.933.21$366
Mar 201722146.772.98$659
Feb 201710750.452.95$316
Jan 201711849.413.42$403
Dec 201611448.763.72$424
Nov 201612242.492.64$323
Oct 201611646.193.09$358
Sep 201610541.553.10$326
Aug 201611641.442.92$339
Jul 201610741.622.92$313
Jun 201610745.352.69$287
May 201611642.521.99$231
Apr 201611236.561.99$223
Mar 201611033.011.79$197
Feb 201611126.472.06$229
Jan 201611127.352.36$262
Dec 201512132.362.00$242
Nov 201511338.792.17$245
Oct 201511343.552.43$274
Sep 201511242.992.76$309
Aug 201512040.162.87$345
Jul 201511348.152.95$333
Jun 201511256.152.88$323
May 201510755.212.96$316
Apr 20158449.822.71$227
Mar 201512042.892.93$352
Feb 201510344.662.98$307
Jan 201510743.433.10$332
Dec 201411554.693.59$413
Nov 201410370.464.25$438
Oct 201411678.303.90$453
Sep 201410086.164.05$405
Aug 201411489.394.04$460
Jul 201410596.564.18$439
Jun 201411798.164.74$554
May 201412194.734.73$572
Apr 201411395.944.81$543
Mar 201412595.895.06$632
Feb 201410997.406.19$675
Jan 201413190.404.86$637
Dec 201312791.824.35$553
Nov 201312088.853.74$449
Oct 201312197.423.78$457
Sep 2013114104.113.72$424
Aug 2013116104.253.52$409
Jul 2013124102.523.72$461
Jun 201312094.403.93$472
May 201312894.834.15$531
Apr 201311993.964.28$510
Mar 201312593.623.91$489
Feb 201311691.233.42$397
Jan 201312791.603.42$434
Dec 201213186.773.42$448
Nov 201212686.953.62$457
Oct 201213089.383.40$442
Sep 201212194.672.92$353
Aug 201212492.662.91$361
Jul 201212085.133.02$363
Jun 201212179.822.52$305
May 201212591.612.49$311
Apr 2012124101.652.00$248
Mar 2012129105.052.22$287
Feb 2012106101.102.57$272
Jan 201212098.092.73$328
Dec 201112596.873.24$405
Nov 201112295.723.31$404
Oct 201111684.983.65$423
Sep 201110783.623.99$426
Aug 201110783.404.15$444
Jul 201110994.144.52$492
Jun 201110692.904.64$492
May 201112598.134.40$551
Apr 201171105.964.33$308
Mar 201111396.364.06$458
Feb 201119785.644.18$823
Jan 201111186.504.59$509
Dec 201010985.734.35$474
Nov 20109380.843.80$353
Oct 20109478.103.51$330
Sep 201011172.633.98$442
Aug 201013173.684.42$579
Jul 20109672.554.74$455
Jun 201012470.364.91$609
May 201013271.124.24$559
Apr 201012481.694.12$511
Mar 201013478.394.39$588
Feb 201011773.585.44$637
Jan 201013374.365.96$793
Dec 200919571.445.48$1,069
Nov 200912974.593.75$484
Oct 200913672.544.11$559
Sep 200912665.543.06$386
Aug 200913067.423.22$418
Jul 200913161.133.46$454
Jun 200912966.163.90$502
May 200913054.743.93$510
Apr 200912546.773.59$448
Mar 200912042.144.06$487
Feb 200912232.814.63$565
Jan 200912535.865.37$671
Dec 200814337.105.98$855
Nov 200815155.496.86$1,036
Oct 200816975.246.92$1,170
Sep 2008122101.767.88$961
Aug 2008166114.228.48$1,408
Jul 2008231131.0811.39$2,631
Jun 2008179131.3313.03$2,333
May 2008225123.1711.57$2,604
Apr 2008203110.3110.45$2,122
Mar 2008223101.909.66$2,155
Feb 200823392.538.77$2,044
Jan 200826990.388.21$2,207
Dec 200723088.337.30$1,679
Nov 200716691.677.29$1,210
Oct 200713482.856.92$928
Sep 200714475.846.24$899
Aug 200713869.066.39$882
Jul 200713470.906.39$856
Jun 200713062.007.55$981
May 200713758.747.85$1,075
Apr 200714059.617.81$1,093
Mar 200713756.927.30$1,000
Feb 200716255.108.22$1,331
Jan 20079950.306.73$666
Dec 200611256.656.92$775
Nov 200614054.207.62$1,066
Oct 200613654.906.01$818
Sep 200613260.085.04$665
Aug 20069768.717.34$712
Jul 200615869.376.34$1,002
Jun 200619466.286.38$1,238
May 200617166.016.42$1,099
Apr 20069864.397.36$721
Mar 200611056.707.08$779
Feb 20069657.597.75$744
Jan 200617660.598.93$1,572
Dec 200516654.9413.42$2,227
Nov 200517454.6910.59$1,842
Oct 200521558.3413.80$2,966
Sep 200514361.4512.08$1,727
Aug 200516861.519.80$1,646
Jul 200517055.697.84$1,333
Jun 200518352.337.38$1,351
May 200517745.226.65$1,177
Apr 200518549.207.36$1,362
Mar 200518150.377.15$1,295
Feb 200516945.226.31$1,067
Jan 200519843.166.32$1,252
Dec 200419839.866.75$1,337
Nov 200415645.286.33$988
Oct 200415749.706.52$1,023
Sep 200413643.245.28$719
Aug 200416242.375.55$899
Jul 200418338.286.08$1,113
Jun 200420736.106.43$1,332
May 200424437.486.49$1,585
Apr 200417234.475.86$1,008
Mar 200418034.365.53$995
Feb 200416132.455.51$887
Jan 200423832.036.30$1,499
Dec 200321830.266.30$1,374
Nov 200322828.804.60$1,048
Oct 200310028.174.76$476
Sep 200314726.314.75$698
Aug 200312929.765.13$662
Jul 200312529.415.17$646
Jun 2003028.565.98$0
May 2003026.595.97$0
Apr 200317026.675.41$919
Mar 200316331.146.10$994
Feb 200316733.487.93$1,324
Jan 200318130.315.58$1,010
Dec 200220026.914.85$971
Nov 200219224.664.14$794
Oct 200219226.464.23$812
Sep 200214527.443.64$527
Aug 200223625.963.16$747
Jul 200218124.583.06$554
Jun 200221823.733.34$728
May 200224724.663.58$885
Apr 200224023.653.51$843
Mar 200221322.003.10$661
Feb 200218718.222.38$444
Jan 200220117.172.38$478
Dec 200117916.932.36$423
Nov 200119818.072.41$476
Oct 200122119.782.53$559
Sep 200124024.262.25$540
Aug 200119724.873.05$601
Jul 200120523.933.20$655
Jun 200123524.563.82$899
May 200121325.524.31$917
Apr 200119124.685.34$1,019
Mar 200124424.545.38$1,312
Feb 2001027.755.77$0
Jan 200117327.478.40$1,453
Dec 200018726.889.12$1,706
Nov 200020932.215.66$1,183
Oct 200023131.235.15$1,189
Sep 200023731.875.19$1,229
Aug 200024029.644.54$1,090
Jul 200019728.534.09$806
Jun 200020129.304.40$884
May 200020827.263.68$765
Apr 200020224.513.12$629
Mar 200016328.422.86$466
Feb 200016527.622.73$450
Jan 200023725.272.48$588
Dec 199924324.282.42$589
Nov 199920223.192.43$492
Oct 199921520.982.80$603
Sep 199926521.752.62$694
Aug 199930019.262.88$863
Jul 199937617.892.37$892
Jun 199929215.942.36$690
May 199930315.792.32$703
Apr 199937115.102.21$819
Mar 199934112.471.84$627
Feb 19992139.981.82$387
Jan 199925310.381.90$481
Dec 19983039.201.77$537
Nov 199829910.892.19$654
Oct 199827712.421.97$545
Sep 199828612.592.08$596
Aug 199830911.301.91$589
Jul 199826811.742.24$600
Jun 199826411.242.24$591
May 199828312.622.21$624
Apr 199828513.042.51$714
Mar 199823012.802.31$531
Feb 199820213.952.30$464
Jan 199827014.702.15$582
Dec 199725616.322.41$617
Nov 199731918.193.09$985
Oct 199729019.253.15$913
Sep 199723517.742.95$694
Aug 199727417.862.55$700
Jul 199720317.582.25$456
Jun 199732117.242.26$725
May 199721318.972.31$492
Apr 199726417.882.08$550
Mar 199729718.951.94$576
Feb 199722120.492.21$488
Jan 199730723.483.54$1,087
Dec 199625623.32$0
Nov 199629421.97$0
Oct 199638023.31$0
Sep 199636022.22$0
Aug 199631320.26$0
Jul 199636119.55$0
Jun 199630818.73$0
May 199630219.43$0
Apr 199629221.51$0
Mar 199630519.38$0
Feb 19961,13816.98$0
Jan 199623917.07$0
Dec 199517217.19$0
Nov 199524216.00$0
Oct 199530015.43$0
Sep 199520716.18$0
Aug 199529215.92$0
Jul 199529215.24$0
Jun 199533116.41$0
May 199528717.56$0
Apr 199522217.73$0
Mar 199530816.44$0
Feb 199525816.58$0
Jan 199551515.92$0
Dec 199435115.03$0
Nov 199445415.90$0
Oct 199442415.58$0
Sep 199435915.29$0
Aug 199438016.13$0
Jul 199448517.56$0
Jun 199456017.09$0
May 199442315.88$0
Apr 199454314.14$0
Mar 199437112.46$0
Feb 199432112.50$0
Jan 19941812.66$0
Dec 199324712.33$0
Nov 199369714.49$0
Oct 199334315.85$0
Sep 199327315.03$0
Aug 199343415.66$0
Jul 199357215.46$0
Jun 199348216.79$0
May 199337317.68$0
Apr 199347218.05$0
Mar 199376518.14$0
Feb 199352317.90$0
Jan 199352516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   55 Mcf  × $  3.05 =       $168

────────────────────────────────────────────────────
Month total                                     $168

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/39393 is the state's own key, not one this site invented.