PIERCE, J. S. 100

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 46415District 7CField 67995200CondensateGasSaveExport
Value, all time
$242 k
Jan 1993 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition18 bbl$1,183
GasProduction69,293 Mcf$240,409
Total$241,592

18,006 Mcf of this lease's gas, across 46 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4916, -101.4328. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.49156, -101.43284 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,200 ft.

Completions filed
May 1969
1 of 1 wells

1 well

42-1053002337,200 ftMay 1969

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026050106.413.05$152
Apr 202614398.932.87$222
Mar 20260089.753.15$0
Feb 202625163.503.75$318
Jan 202604159.138.00$328
Dec 2025110656.664.41$524
Nov 2025114258.593.93$616
Oct 2025111559.383.30$439
Sep 2025114762.743.08$515
Aug 2025116263.933.01$552
Jul 2025115966.743.32$594
Jun 2025113766.483.13$495
May 2025213760.553.23$564
Apr 2025213962.363.54$617
Mar 2025213967.704.27$729
Feb 2025211670.884.34$645
Jan 20250074.324.28$0
Dec 2024013068.993.12$406
Nov 2024012969.052.20$284
Oct 2024013471.372.28$306
Sep 2024012669.612.36$298
Aug 2024014375.632.06$295
Jul 2024015279.932.15$326
Jun 2024014278.082.63$374
May 2024011778.812.20$257
Apr 202408884.451.66$146
Mar 202402680.301.55$40
Feb 2024011176.091.78$198
Jan 202405673.023.30$185
Dec 202302971.262.61$76
Nov 2023010177.892.81$284
Oct 2023012285.443.09$377
Sep 2023012489.042.74$339
Aug 2023013080.522.67$347
Jul 2023013674.852.64$359
Jun 2023011868.962.26$267
May 2023012370.622.23$274
Apr 2023012078.122.24$269
Mar 2023013172.852.39$314
Feb 202309575.112.47$234
Jan 2023013376.533.39$451
Dec 2022015476.415.73$882
Nov 20220185.005.65$6
Oct 202202687.185.86$152
Sep 202202484.888.16$196
Aug 202202394.529.13$210
Jul 2022013101.587.54$98
Jun 2022017115.097.98$136
May 2022030109.378.43$253
Apr 2022026104.226.84$178
Mar 202207108.885.08$36
Feb 20220991.054.86$44
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 2021015177.435.24$791
Oct 202103679.795.71$206
Sep 202103669.865.35$193
Aug 202103466.024.22$144
Jul 202103470.783.98$135
Jun 202103969.493.38$132
May 202103063.483.02$91
Apr 202102460.362.76$66
Mar 202104661.302.72$125
Feb 202101657.805.55$89
Jan 202102050.412.81$56
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190552.782.49$12
May 20190058.482.74$0
Apr 20190462.632.75$11
Mar 20190256.803.06$6
Feb 20190450.852.79$11
Jan 20190246.033.23$6
Dec 20180046.594.19$0
Nov 2018013652.934.24$576
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 201801065.142.93$29
Jun 20180060.183.08$0
May 20180465.382.90$12
Apr 20180563.842.90$15
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170949.292.98$27
Sep 20170347.523.09$9
Aug 201701145.373.00$33
Jul 20170643.873.09$19
Jun 20170842.493.09$25
May 20170545.373.26$16
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170950.452.95$27
Jan 20170949.413.42$31
Dec 20160248.763.72$7
Nov 201601242.492.64$32
Oct 20160846.193.09$25
Sep 20160941.553.10$28
Aug 20160341.442.92$9
Jul 20160141.622.92$3
Jun 20160245.352.69$5
May 2016022542.521.99$448
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160126.472.06$2
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150342.992.76$8
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 201401170.464.25$47
Oct 20140978.303.90$35
Sep 20140986.164.05$36
Aug 201401389.394.04$52
Jul 201401096.564.18$42
Jun 201401098.164.74$47
May 20140894.734.73$38
Apr 20140595.944.81$24
Mar 20140995.895.06$46
Feb 201401097.406.19$62
Jan 201401290.404.86$58
Dec 201301291.824.35$52
Nov 201301088.853.74$37
Oct 201301297.423.78$45
Sep 2013012104.113.72$45
Aug 2013012104.253.52$42
Jul 2013012102.523.72$45
Jun 201301294.403.93$47
May 201301094.834.15$41
Apr 201301393.964.28$56
Mar 201301193.623.91$43
Feb 201301391.233.42$44
Jan 201301591.603.42$51
Dec 201201586.773.42$51
Nov 201201386.953.62$47
Oct 201201689.383.40$54
Sep 201201594.672.92$44
Aug 201201292.662.91$35
Jul 201201485.133.02$42
Jun 201201279.822.52$30
May 201201491.612.49$35
Apr 2012012101.652.00$24
Mar 2012015105.052.22$33
Feb 2012014101.102.57$36
Jan 201201498.092.73$38
Dec 20110796.873.24$23
Nov 201101495.723.31$46
Oct 201101384.983.65$47
Sep 201101583.623.99$60
Aug 201101583.404.15$62
Jul 201101894.144.52$81
Jun 201101992.904.64$88
May 201101898.134.40$79
Apr 2011016105.964.33$69
Mar 201101096.364.06$41
Feb 20110485.644.18$17
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100272.633.98$8
Aug 20100373.684.42$13
Jul 20100372.554.74$14
Jun 20100470.364.91$20
May 20100471.124.24$17
Apr 20100281.694.12$8
Mar 20100778.394.39$31
Feb 20100973.585.44$49
Jan 201001274.365.96$72
Dec 200901071.445.48$55
Nov 20090974.593.75$34
Oct 200901172.544.11$45
Sep 20090865.543.06$25
Aug 200901767.423.22$55
Jul 200901961.133.46$66
Jun 200901966.163.90$74
May 2009015954.743.93$624
Apr 2009022146.773.59$793
Mar 2009026042.144.06$1,055
Feb 2009022932.814.63$1,061
Jan 2009026535.865.37$1,423
Dec 2008026237.105.98$1,566
Nov 2008025955.496.86$1,777
Oct 2008027475.246.92$1,897
Sep 20080194101.767.88$1,528
Aug 20080258114.228.48$2,189
Jul 20080266131.0811.39$3,030
Jun 20080250131.3313.03$3,258
May 20080262123.1711.57$3,032
Apr 20080256110.3110.45$2,676
Mar 20080263101.909.66$2,542
Feb 2008025092.538.77$2,193
Jan 2008026790.388.21$2,191
Dec 2007026588.337.30$1,935
Nov 2007025691.677.29$1,867
Oct 2007026182.856.92$1,807
Sep 2007026175.846.24$1,630
Aug 2007027669.066.39$1,763
Jul 2007023870.906.39$1,520
Jun 2007022662.007.55$1,706
May 2007017758.747.85$1,389
Apr 2007021359.617.81$1,663
Mar 2007021456.927.30$1,563
Feb 2007022355.108.22$1,832
Jan 2007029450.306.73$1,978
Dec 2006029056.656.92$2,006
Nov 2006022854.207.62$1,737
Oct 2006032854.906.01$1,973
Sep 2006029860.085.04$1,501
Aug 2006029368.717.34$2,151
Jul 2006028569.376.34$1,808
Jun 2006025766.286.38$1,641
May 2006028866.016.42$1,850
Apr 200607364.397.36$537
Mar 200607356.707.08$517
Feb 2006018057.597.75$1,395
Jan 2006020060.598.93$1,787
Dec 2005020254.9413.42$2,710
Nov 2005018854.6910.59$1,991
Oct 2005026458.3413.80$3,642
Sep 2005025861.4512.08$3,116
Aug 2005028761.519.80$2,812
Jul 2005027655.697.84$2,165
Jun 2005026052.337.38$1,919
May 2005021145.226.65$1,403
Apr 2005021449.207.36$1,575
Mar 2005025250.377.15$1,803
Feb 2005022745.226.31$1,433
Jan 2005025743.166.32$1,625
Dec 2004027939.866.75$1,884
Nov 2004025245.286.33$1,595
Oct 2004027449.706.52$1,785
Sep 2004028643.245.28$1,511
Aug 2004025242.375.55$1,399
Jul 2004024038.286.08$1,460
Jun 2004023036.106.43$1,480
May 2004021237.486.49$1,377
Apr 2004031734.475.86$1,857
Mar 2004033834.365.53$1,869
Feb 2004030132.455.51$1,658
Jan 2004032432.036.30$2,041
Dec 2003029930.266.30$1,884
Nov 2003030028.804.60$1,379
Oct 2003039328.174.76$1,871
Sep 2003034926.314.75$1,658
Aug 2003036829.765.13$1,888
Jul 2003032229.415.17$1,665
Jun 2003034128.565.98$2,040
May 2003039926.595.97$2,383
Apr 2003039626.675.41$2,141
Mar 2003042831.146.10$2,609
Feb 2003031633.487.93$2,505
Jan 2003042630.315.58$2,378
Dec 2002034326.914.85$1,665
Nov 2002031724.664.14$1,311
Oct 2002034026.464.23$1,438
Sep 2002036127.443.64$1,312
Aug 2002032325.963.16$1,022
Jul 2002035524.583.06$1,087
Jun 2002032423.733.34$1,082
May 2002034424.663.58$1,233
Apr 2002033523.653.51$1,177
Mar 2002040422.003.10$1,254
Feb 2002030418.222.38$722
Jan 2002034217.172.38$812
Dec 2001023316.932.36$551
Nov 2001032118.072.41$772
Oct 2001033319.782.53$842
Sep 2001033024.262.25$743
Aug 2001030024.873.05$916
Jul 2001026823.933.20$857
Jun 2001026324.563.82$1,006
May 2001031725.524.31$1,365
Apr 2001033924.685.34$1,809
Mar 2001036224.545.38$1,946
Feb 2001024827.755.77$1,430
Jan 2001032827.478.40$2,755
Dec 2000031726.889.12$2,892
Nov 2000028632.215.66$1,618
Oct 2000030831.235.15$1,585
Sep 2000032031.875.19$1,660
Aug 2000036429.644.54$1,653
Jul 2000032928.534.09$1,346
Jun 2000028529.304.40$1,253
May 2000032027.263.68$1,178
Apr 2000032824.513.12$1,022
Mar 2000033128.422.86$947
Feb 2000028427.622.73$774
Jan 2000035325.272.48$876
Dec 1999027624.282.42$669
Nov 1999030123.192.43$733
Oct 1999031620.982.80$886
Sep 1999030921.752.62$809
Aug 1999028519.262.88$820
Jul 1999033717.892.37$799
Jun 1999027215.942.36$642
May 1999036915.792.32$856
Apr 1999024015.102.21$530
Mar 1999042412.471.84$779
Feb 199902329.981.82$422
Jan 1999027710.381.90$526
Dec 199802399.201.77$424
Nov 1998033710.892.19$737
Oct 1998035412.421.97$697
Sep 1998033112.592.08$689
Aug 1998044711.301.91$853
Jul 1998041111.742.24$920
Jun 1998039511.242.24$884
May 1998037312.622.21$823
Apr 1998035013.042.51$877
Mar 1998035312.802.31$815
Feb 1998033513.952.30$770
Jan 1998043114.702.15$929
Dec 1997039716.322.41$957
Nov 1997035918.193.09$1,109
Oct 1997039519.253.15$1,244
Sep 1997042117.742.95$1,244
Aug 1997048517.862.55$1,239
Jul 1997050117.582.25$1,126
Jun 1997038217.242.26$862
May 1997040718.972.31$940
Apr 1997043617.882.08$908
Mar 1997038118.951.94$739
Feb 1997035220.492.21$776
Jan 1997038823.483.54$1,373
Dec 1996038823.32$0
Nov 1996043721.97$0
Oct 1996036123.31$0
Sep 1996042922.22$0
Aug 1996034520.26$0
Jul 1996035919.55$0
Jun 1996047418.73$0
May 1996050219.43$0
Apr 1996055821.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 1996031617.07$0
Dec 1995037317.19$0
Nov 1995037816.00$0
Oct 1995035115.43$0
Sep 1995036116.18$0
Aug 1995041015.92$0
Jul 1995046815.24$0
Jun 1995040716.41$0
May 1995046817.56$0
Apr 1995043417.73$0
Mar 1995047216.44$0
Feb 1995034816.58$0
Jan 1995042015.92$0
Dec 1994048715.03$0
Nov 1994024415.90$0
Oct 1994047915.58$0
Sep 1994041115.29$0
Aug 1994040616.13$0
Jul 1994042717.56$0
Jun 1994041417.09$0
May 1994039115.88$0
Apr 1994038914.14$0
Mar 1994041612.46$0
Feb 1994031812.50$0
Jan 1994036912.66$0
Dec 1993036612.33$0
Nov 1993033114.49$0
Oct 1993034815.85$0
Sep 1993026415.03$0
Aug 1993036415.66$0
Jul 1993039115.46$0
Jun 1993036716.79$0
May 1993029217.68$0
Apr 1993036018.05$0
Mar 1993031418.14$0
Feb 1993040217.90$0
Jan 1993039716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   50 Mcf  × $  3.05 =       $152

────────────────────────────────────────────────────
Month total                                     $152

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/46415 is the state's own key, not one this site invented.