CLEGG "83"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 51917District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$641 k
Jan 1993 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition29 bbl$1,890
GasProduction168,330 Mcf$638,934
Total$640,824

18,214 Mcf of this lease's gas, across 37 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4225, -101.4830. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42246, -101.48299 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,030 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,030 ft.

Completions filed
Nov 1970
1 of 1 wells

1 well

42-1053021617,030 ftNov 1970

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202602106.413.05$6
Apr 202601598.932.87$43
Mar 20260089.753.15$0
Feb 20260863.503.75$30
Jan 20260459.138.00$32
Dec 202501356.664.41$57
Nov 202514658.593.93$239
Oct 2025116859.383.30$615
Sep 2025133662.743.08$1,097
Aug 2025334563.933.01$1,232
Jul 2025334366.743.32$1,337
Jun 2025235866.483.13$1,253
May 2025435860.553.23$1,399
Apr 2025434162.363.54$1,458
Mar 2025535967.704.27$1,871
Feb 2025532170.884.34$1,748
Jan 20250074.324.28$0
Dec 2024034268.993.12$1,068
Nov 2024035269.052.20$774
Oct 2024037771.372.28$860
Sep 2024032169.612.36$759
Aug 2024035175.632.06$724
Jul 2024035279.932.15$756
Jun 2024034878.082.63$917
May 2024035978.812.20$789
Apr 2024035184.451.66$582
Mar 2024036980.301.55$570
Feb 2024026876.091.78$478
Jan 2024032173.023.30$1,059
Dec 2023035771.262.61$932
Nov 2023036677.892.81$1,028
Oct 2023038085.443.09$1,173
Sep 2023036689.042.74$1,001
Aug 2023037980.522.67$1,013
Jul 2023038874.852.64$1,025
Jun 2023050168.962.26$1,132
May 2023035770.622.23$795
Apr 2023037278.122.24$832
Mar 2023038572.852.39$921
Feb 2023034275.112.47$843
Jan 2023038976.533.39$1,318
Dec 2022037276.415.73$2,131
Nov 2022037985.005.65$2,140
Oct 2022038287.185.86$2,240
Sep 2022038984.888.16$3,176
Aug 2022039194.529.13$3,569
Jul 20220392101.587.54$2,957
Jun 20220361115.097.98$2,880
May 20220410109.378.43$3,458
Apr 20220392104.226.84$2,680
Mar 20220421108.885.08$2,137
Feb 2022037891.054.86$1,837
Jan 2022041581.844.54$1,883
Dec 2021042471.323.90$1,653
Nov 2021038877.435.24$2,032
Oct 2021039779.795.71$2,268
Sep 2021043069.865.35$2,301
Aug 2021044766.024.22$1,887
Jul 2021044270.783.98$1,760
Jun 2021045469.493.38$1,535
May 2021031263.483.02$942
Apr 2021035360.362.76$974
Mar 2021045661.302.72$1,239
Feb 2021041757.805.55$2,314
Jan 202109150.412.81$256
Dec 2020033044.642.68$883
Nov 2020035538.772.71$961
Oct 2020037736.972.48$934
Sep 2020032237.091.99$641
Aug 2020035539.982.39$847
Jul 2020036038.371.83$657
Jun 2020035934.901.69$607
May 2020037916.921.81$688
Apr 2020042014.751.80$758
Mar 2020045130.341.86$837
Feb 2020038849.881.98$769
Jan 2020050057.252.09$1,047
Dec 2019049259.012.30$1,134
Nov 2019049555.302.75$1,362
Oct 2019048553.472.42$1,173
Sep 2019050955.052.66$1,353
Aug 2019051253.112.30$1,180
Jul 2019048856.272.46$1,201
Jun 2019050452.782.49$1,256
May 2019052358.482.74$1,433
Apr 2019050862.632.75$1,397
Mar 2019053556.803.06$1,638
Feb 2019049650.852.79$1,385
Jan 2019055646.033.23$1,795
Dec 2018056646.594.19$2,369
Nov 2018054452.934.24$2,305
Oct 2018058061.443.40$1,971
Sep 2018061059.543.11$1,896
Aug 2018042859.403.07$1,312
Jul 2018053065.142.93$1,554
Jun 2018052060.183.08$1,600
May 2018054365.382.90$1,575
Apr 2018053563.842.90$1,552
Mar 2018056761.222.79$1,580
Feb 2018055961.782.77$1,546
Jan 2018028762.874.01$1,151
Dec 2017059257.272.92$1,730
Nov 2017059655.423.12$1,859
Oct 2017053549.292.98$1,596
Sep 2017056447.523.09$1,741
Aug 2017058245.373.00$1,749
Jul 2017059143.873.09$1,825
Jun 2017057942.493.09$1,788
May 2017060545.373.26$1,974
Apr 2017057847.933.21$1,856
Mar 2017061346.772.98$1,829
Feb 2017055750.452.95$1,645
Jan 2017060649.413.42$2,072
Dec 2016061648.763.72$2,293
Nov 2016061642.492.64$1,629
Oct 2016063846.193.09$1,972
Sep 2016062541.553.10$1,938
Aug 2016066241.442.92$1,936
Jul 2016071341.622.92$2,085
Jun 2016070945.352.69$1,904
May 2016062342.521.99$1,240
Apr 2016069736.561.99$1,388
Mar 2016075233.011.79$1,349
Feb 2016080126.472.06$1,653
Jan 2016089227.352.36$2,109
Dec 2015086532.362.00$1,731
Nov 2015071738.792.17$1,554
Oct 2015080743.552.43$1,958
Sep 2015053142.992.76$1,465
Aug 2015064740.162.87$1,859
Jul 2015084848.152.95$2,497
Jun 2015085056.152.88$2,450
May 2015092355.212.96$2,728
Apr 2015083049.822.71$2,246
Mar 2015073642.892.93$2,160
Feb 2015065544.662.98$1,949
Jan 2015068043.433.10$2,108
Dec 2014061654.693.59$2,212
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140796.564.18$29
Jun 20140798.164.74$33
May 20140794.734.73$33
Apr 20140795.944.81$34
Mar 20140695.895.06$30
Feb 20140797.406.19$43
Jan 20140890.404.86$39
Dec 20130891.824.35$35
Nov 20130888.853.74$30
Oct 20130897.423.78$30
Sep 201308104.113.72$30
Aug 201308104.253.52$28
Jul 201309102.523.72$33
Jun 20130894.403.93$31
May 20130794.834.15$29
Apr 20130893.964.28$34
Mar 20130693.623.91$23
Feb 20130691.233.42$21
Jan 20130691.603.42$21
Dec 20120486.773.42$14
Nov 20120786.953.62$25
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120885.133.02$24
Jun 201201579.822.52$38
May 201202091.612.49$50
Apr 2012017101.652.00$34
Mar 2012016105.052.22$36
Feb 2012062101.102.57$159
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110283.623.99$8
Aug 20110483.404.15$17
Jul 20110494.144.52$18
Jun 20110492.904.64$19
May 20110698.134.40$26
Apr 201109105.964.33$39
Mar 20110696.364.06$24
Feb 20110585.644.18$21
Jan 20110986.504.59$41
Dec 201001785.734.35$74
Nov 201002280.843.80$84
Oct 201002578.103.51$88
Sep 201001872.633.98$72
Aug 201002473.684.42$106
Jul 201001972.554.74$90
Jun 201002770.364.91$133
May 201001971.124.24$80
Apr 201001481.694.12$58
Mar 201001978.394.39$83
Feb 20100073.585.44$0
Jan 20100574.365.96$30
Dec 20090471.445.48$22
Nov 200901174.593.75$41
Oct 200901972.544.11$78
Sep 20090265.543.06$6
Aug 20090267.423.22$6
Jul 20090361.133.46$10
Jun 20090466.163.90$16
May 20090554.743.93$20
Apr 20090646.773.59$22
Mar 20090342.144.06$12
Feb 20090532.814.63$23
Jan 200901335.865.37$70
Dec 200802037.105.98$120
Nov 200802255.496.86$151
Oct 200802675.246.92$180
Sep 200809101.767.88$71
Aug 2008032114.228.48$271
Jul 2008035131.0811.39$399
Jun 2008024131.3313.03$313
May 2008031123.1711.57$359
Apr 2008030110.3110.45$314
Mar 2008019101.909.66$184
Feb 200804792.538.77$412
Jan 200807590.388.21$615
Dec 200703588.337.30$256
Nov 200703091.677.29$219
Oct 200703182.856.92$215
Sep 200703675.846.24$225
Aug 200704669.066.39$294
Jul 200706270.906.39$396
Jun 200705962.007.55$445
May 200704158.747.85$322
Apr 2007012759.617.81$991
Mar 2007042856.927.30$3,125
Feb 2007064055.108.22$5,258
Jan 2007079450.306.73$5,341
Dec 2006079356.656.92$5,486
Nov 2006073654.207.62$5,606
Oct 2006081954.906.01$4,925
Sep 2006080460.085.04$4,050
Aug 2006082068.717.34$6,019
Jul 2006074369.376.34$4,713
Jun 2006073366.286.38$4,679
May 2006068466.016.42$4,395
Apr 2006069164.397.36$5,086
Mar 2006070256.707.08$4,972
Feb 2006058257.597.75$4,511
Jan 2006064960.598.93$5,798
Dec 2005051954.9413.42$6,963
Nov 2005053954.6910.59$5,707
Oct 2005070858.3413.80$9,767
Sep 2005074161.4512.08$8,951
Aug 2005077361.519.80$7,573
Jul 2005076955.697.84$6,032
Jun 2005078852.337.38$5,816
May 2005075845.226.65$5,042
Apr 2005078149.207.36$5,749
Mar 2005075850.377.15$5,423
Feb 2005066445.226.31$4,191
Jan 2005074543.166.32$4,710
Dec 2004077339.866.75$5,219
Nov 2004075445.286.33$4,773
Oct 2004080249.706.52$5,225
Sep 2004089843.245.28$4,745
Aug 2004094842.375.55$5,262
Jul 2004039638.286.08$2,409
Jun 2004091436.106.43$5,880
May 2004080237.486.49$5,209
Apr 2004092134.475.86$5,396
Mar 2004079334.365.53$4,385
Feb 2004079732.455.51$4,391
Jan 2004085832.036.30$5,405
Dec 2003092930.266.30$5,854
Nov 2003084228.804.60$3,869
Oct 2003083928.174.76$3,993
Sep 2003081026.314.75$3,847
Aug 2003089329.765.13$4,581
Jul 2003089729.415.17$4,638
Jun 2003086128.565.98$5,151
May 2003091826.595.97$5,483
Apr 2003090426.675.41$4,888
Mar 2003098831.146.10$6,023
Feb 2003088133.487.93$6,983
Jan 2003093830.315.58$5,236
Dec 2002087926.914.85$4,266
Nov 2002086524.664.14$3,578
Oct 2002089526.464.23$3,785
Sep 2002083527.443.64$3,035
Aug 2002098425.963.16$3,114
Jul 2002098224.583.06$3,007
Jun 2002091423.733.34$3,051
May 2002099124.663.58$3,552
Apr 2002095723.653.51$3,361
Mar 2002097122.003.10$3,013
Feb 2002082218.222.38$1,953
Jan 2002095017.172.38$2,257
Dec 200101,01716.932.36$2,405
Nov 2001056018.072.41$1,347
Oct 200101,08019.782.53$2,731
Sep 200101,09824.262.25$2,472
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 2001064324.563.82$2,459
May 2001091925.524.31$3,958
Apr 2001079024.685.34$4,215
Mar 2001097624.545.38$5,247
Feb 2001087627.755.77$5,052
Jan 2001096827.478.40$8,130
Dec 2000088226.889.12$8,046
Nov 2000093132.215.66$5,268
Oct 200001,05031.235.15$5,403
Sep 2000091331.875.19$4,735
Aug 200001,10029.644.54$4,995
Jul 200001,04028.534.09$4,253
Jun 200001,05729.304.40$4,648
May 200001,21027.263.68$4,453
Apr 2000069624.513.12$2,169
Mar 200001,17028.422.86$3,346
Feb 200001,14227.622.73$3,114
Jan 200001,25225.272.48$3,106
Dec 199901,22124.282.42$2,959
Nov 199901,28923.192.43$3,137
Oct 199901,28920.982.80$3,614
Sep 199901,26921.752.62$3,323
Aug 199901,40719.262.88$4,046
Jul 199901,38117.892.37$3,276
Jun 199901,30315.942.36$3,078
May 199901,40515.792.32$3,261
Apr 199901,37815.102.21$3,043
Mar 199901,76412.471.84$3,243
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 199601117.07$0
Dec 199505017.19$0
Nov 199505316.00$0
Oct 19950315.43$0
Sep 199503516.18$0
Aug 199501615.92$0
Jul 199506515.24$0
Jun 1995039216.41$0
May 1995026117.56$0
Apr 1995059417.73$0
Mar 199506416.44$0
Feb 199509016.58$0
Jan 1995026215.92$0
Dec 1994081315.03$0
Nov 1994066715.90$0
Oct 1994071815.58$0
Sep 1994073715.29$0
Aug 1994060616.13$0
Jul 1994062517.56$0
Jun 1994096917.09$0
May 199401,02015.88$0
Apr 1994068014.14$0
Mar 1994072712.46$0
Feb 1994081212.50$0
Jan 1994093212.66$0
Dec 1993019012.33$0
Nov 1993043714.49$0
Oct 1993064915.85$0
Sep 1993042715.03$0
Aug 1993072115.66$0
Jul 1993070915.46$0
Jun 1993085316.79$0
May 1993063917.68$0
Apr 1993066818.05$0
Mar 1993066818.14$0
Feb 1993060717.90$0
Jan 1993044416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    2 Mcf  × $  3.05 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/51917 is the state's own key, not one this site invented.