RANDALS, D. C.

Operated by AGROIL, INC. (P-5 8735) in the LOJON (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 54900District 7CField 54429500GasSave
Value, all time
$2 k
Jan 1993 – Aug 1999
Value, last 12 filed months
$0
at the published price for each month
Months reported
80
no gaps in the span
Streams
1
gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction2,437 Mcf$1,750
Total$1,750

1,726 Mcf of this lease's gas, across 18 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4359, -99.4229. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.43594, -99.42292 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
1,400 ft
1 wells filed one
Completion to plug
26.4 years
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 1,400 ft.

Completions filed
Mar 1973
1 of 1 wells
Plug dates filed
Aug 1999
1 of 1 wells

Last completion to plug: a median of 26.4 years across the 1 well that filed both dates, with the middle half between 26.4 years and 26.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3073005821,400 ftMar 1973Aug 1999Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (80)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

80 months

Aug 1999019.262.88$0
Jul 1999017.892.37$0
Jun 1999015.942.36$0
May 1999015.792.32$0
Apr 1999015.102.21$0
Mar 1999012.471.84$0
Feb 199909.981.82$0
Jan 1999010.381.90$0
Dec 199809.201.77$0
Nov 1998010.892.19$0
Oct 1998012.421.97$0
Sep 1998012.592.08$0
Aug 1998011.301.91$0
Jul 1998011.742.24$0
Jun 1998011.242.24$0
May 1998012.622.21$0
Apr 1998013.042.51$0
Mar 1998012.802.31$0
Feb 1998013.952.30$0
Jan 1998014.702.15$0
Dec 1997016.322.41$0
Nov 1997018.193.09$0
Oct 1997019.253.15$0
Sep 1997017.742.95$0
Aug 1997617.862.55$15
Jul 19971517.582.25$34
Jun 19971717.242.26$38
May 19973518.972.31$81
Apr 199714717.882.08$306
Mar 199715918.951.94$308
Feb 199715620.492.21$344
Jan 199717623.483.54$623
Dec 19967523.32$0
Nov 199611721.97$0
Oct 199614123.31$0
Sep 19962222.22$0
Aug 19965220.26$0
Jul 19966319.55$0
Jun 19967818.73$0
May 199611119.43$0
Apr 19963721.51$0
Mar 199613719.38$0
Feb 199610116.98$0
Jan 199611617.07$0
Dec 199515717.19$0
Nov 199515016.00$0
Oct 199513915.43$0
Sep 199511416.18$0
Aug 19959515.92$0
Jul 19952115.24$0
Jun 1995016.41$0
May 1995017.56$0
Apr 1995017.73$0
Mar 1995016.44$0
Feb 1995016.58$0
Jan 1995015.92$0
Dec 1994015.03$0
Nov 1994015.90$0
Oct 1994015.58$0
Sep 1994015.29$0
Aug 1994016.13$0
Jul 1994017.56$0
Jun 1994017.09$0
May 1994015.88$0
Apr 1994014.14$0
Mar 1994012.46$0
Feb 1994012.50$0
Jan 1994012.66$0
Dec 1993012.33$0
Nov 1993014.49$0
Oct 1993015.85$0
Sep 1993015.03$0
Aug 1993015.66$0
Jul 1993015.46$0
Jun 1993016.79$0
May 1993017.68$0
Apr 1993018.05$0
Mar 1993018.14$0
Feb 1993017.90$0
Jan 1993016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 1997 — as filed, then multipliedworked
Gas                    6 Mcf  × $  2.55 =        $15

────────────────────────────────────────────────────
Month total                                      $15

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/54900 is the state's own key, not one this site invented.