THOMSON

Operated by DOMINION OKLAHOMA TEXAS E&P, INC (P-5 222282) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 56704District 7CField 84646500NGPA filingCondensateGasSaveExport
Value, all time
$26 k
Jan 1993 – Oct 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
166
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition28 bbl$530
GasProduction22,283 Mcf$25,315
Total$25,845

12,661 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6631, -100.5997. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66311, -100.59966 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,805 ft
1 wells filed one
Completion to plug
33.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,805 ft.

Completions filed
Oct 1973
1 of 1 wells
Plug dates filed
Oct 2006
1 of 1 wells

Last completion to plug: a median of 33.0 years across the 1 well that filed both dates, with the middle half between 33.0 years and 33.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4353040735,805 ftOct 1973Oct 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (166)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

166 months

Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 200107416.932.36$175
Nov 200107918.072.41$190
Oct 200108719.782.53$220
Sep 2001011624.262.25$261
Aug 200108224.873.05$250
Jul 200105223.933.20$166
Jun 200106624.563.82$252
May 200109825.524.31$422
Apr 200107624.685.34$405
Mar 200108824.545.38$473
Feb 200108127.755.77$467
Jan 2001010527.478.40$882
Dec 200007926.889.12$721
Nov 20000032.215.66$0
Oct 200009331.235.15$479
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 199906720.982.80$188
Sep 1999023021.752.62$602
Aug 1999025819.262.88$742
Jul 1999023717.892.37$562
Jun 1999024715.942.36$583
May 1999025115.792.32$583
Apr 1999019115.102.21$422
Mar 1999026312.471.84$483
Feb 199902269.981.82$411
Jan 1999024710.381.90$469
Dec 199802789.201.77$493
Nov 1998026710.892.19$584
Oct 1998023512.421.97$463
Sep 1998020212.592.08$421
Aug 1998021911.301.91$418
Jul 1998019011.742.24$425
Jun 1998021711.242.24$485
May 1998025212.622.21$556
Apr 1998023313.042.51$584
Mar 1998022412.802.31$517
Feb 1998028813.952.30$662
Jan 1998030414.702.15$655
Dec 1997034916.322.41$841
Nov 1997034718.193.09$1,072
Oct 1997033819.253.15$1,065
Sep 1997025017.742.95$739
Aug 1997019717.862.55$503
Jul 1997020717.582.25$465
Jun 1997023217.242.26$524
May 1997024118.972.31$556
Apr 1997028417.882.08$592
Mar 1997024118.951.94$467
Feb 1997031920.492.21$704
Jan 1997031523.483.54$1,115
Dec 1996030723.32$0
Nov 1996029221.97$0
Oct 1996030423.31$0
Sep 1996026522.22$0
Aug 19962129820.26$425
Jul 1996017819.55$0
Jun 1996026718.73$0
May 1996031819.43$0
Apr 1996019921.51$0
Mar 1996027619.38$0
Feb 1996024116.98$0
Jan 1996029017.07$0
Dec 1995028917.19$0
Nov 1995035616.00$0
Oct 1995030215.43$0
Sep 1995038816.18$0
Aug 1995040515.92$0
Jul 1995023115.24$0
Jun 1995025016.41$0
May 1995034317.56$0
Apr 1995026817.73$0
Mar 1995028616.44$0
Feb 1995020316.58$0
Jan 1995029815.92$0
Dec 1994034615.03$0
Nov 1994126515.90$16
Oct 1994029215.58$0
Sep 1994038215.29$0
Aug 1994025916.13$0
Jul 199408017.56$0
Jun 1994218717.09$34
May 1994119815.88$16
Apr 1994134014.14$14
Mar 1994030112.46$0
Feb 1994024212.50$0
Jan 1994030112.66$0
Dec 1993229812.33$25
Nov 1993015214.49$0
Oct 1993019115.85$0
Sep 1993019215.03$0
Aug 1993023715.66$0
Jul 1993018615.46$0
Jun 1993014916.79$0
May 1993017917.68$0
Apr 1993022218.05$0
Mar 1993024318.14$0
Feb 1993026817.90$0
Jan 1993029716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2001 — as filed, then multipliedworked
Condensate             0 bbl  × $ 16.93 =         $0
Gas                   74 Mcf  × $  2.36 =       $175

────────────────────────────────────────────────────
Month total                                     $175

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/56704 is the state's own key, not one this site invented.