CUSENBARY, W. R. "B"

Operated by HIGHMOUNT EXPL & PROD TEXAS LLC (P-5 385842) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 60261District 7CField 81267333CondensateGasSaveExport
Value, all time
$179 k
Jan 1993 – Aug 2014
Value, last 12 filed months
$0
at the published price for each month
Months reported
260
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition13 bbl$412
GasProduction46,495 Mcf$178,515
Total$178,927

5,558 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3448, -100.5720. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.34477, -100.57203 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,500 ft
1 wells filed one
Completion to plug
39.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,500 ft.

Completions filed
Oct 1974
1 of 1 wells
Plug dates filed
Aug 2014
1 of 1 wells

Last completion to plug: a median of 39.8 years across the 1 well that filed both dates, with the middle half between 39.8 years and 39.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4353072126,500 ftOct 1974Aug 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (260)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

260 months

Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20073062.007.55$186
May 200707658.747.85$596
Apr 2007030959.617.81$2,412
Mar 2007032456.927.30$2,366
Feb 2007034855.108.22$2,859
Jan 2007034150.306.73$2,294
Dec 2006032756.656.92$2,262
Nov 2006030654.207.62$2,331
Oct 2006037054.906.01$2,225
Sep 2006036160.085.04$1,818
Aug 2006035768.717.34$2,620
Jul 2006036269.376.34$2,296
Jun 2006031666.286.38$2,017
May 2006030766.016.42$1,972
Apr 2006129464.397.36$2,228
Mar 2006030756.707.08$2,174
Feb 2006027557.597.75$2,132
Jan 2006032660.598.93$2,912
Dec 2005037054.9413.42$4,964
Nov 2005029254.6910.59$3,092
Oct 2005030158.3413.80$4,153
Sep 2005032461.4512.08$3,914
Aug 2005033961.519.80$3,321
Jul 2005030955.697.84$2,424
Jun 2005029752.337.38$2,192
May 2005030345.226.65$2,015
Apr 2005019549.207.36$1,435
Mar 2005017750.377.15$1,266
Feb 2005016645.226.31$1,048
Jan 2005019343.166.32$1,220
Dec 2004010839.866.75$729
Nov 200408045.286.33$506
Oct 2004016549.706.52$1,075
Sep 2004024243.245.28$1,279
Aug 2004020642.375.55$1,143
Jul 2004012438.286.08$754
Jun 2004013536.106.43$868
May 2004014637.486.49$948
Apr 2004018034.475.86$1,055
Mar 2004020334.365.53$1,123
Feb 2004020332.455.51$1,118
Jan 2004011732.036.30$737
Dec 2003028830.266.30$1,815
Nov 2003021728.804.60$997
Oct 2003027628.174.76$1,314
Sep 2003024726.314.75$1,173
Aug 2003027329.765.13$1,400
Jul 2003031729.415.17$1,639
Jun 2003029628.565.98$1,771
May 2003031126.595.97$1,858
Apr 2003028926.675.41$1,563
Mar 2003028131.146.10$1,713
Feb 2003025433.487.93$2,013
Jan 2003026130.315.58$1,457
Dec 2002027126.914.85$1,315
Nov 200202,22124.664.14$9,188
Oct 2002023526.464.23$994
Sep 2002024527.443.64$891
Aug 2002024025.963.16$759
Jul 2002020324.583.06$622
Jun 2002017923.733.34$598
May 2002019024.663.58$681
Apr 2002017823.653.51$625
Mar 2002017422.003.10$540
Feb 2002014018.222.38$333
Jan 2002016017.172.38$380
Dec 2001020916.932.36$494
Nov 2001020418.072.41$491
Oct 2001023419.782.53$592
Sep 2001021324.262.25$480
Aug 2001021424.873.05$653
Jul 2001010523.933.20$336
Jun 2001020224.563.82$772
May 2001047925.524.31$2,063
Apr 2001023924.685.34$1,275
Mar 2001038024.545.38$2,043
Feb 2001023627.755.77$1,361
Jan 200108827.478.40$739
Dec 200007726.889.12$702
Nov 2000057732.215.66$3,265
Oct 2000041131.235.15$2,115
Sep 200006031.875.19$311
Aug 2000029129.644.54$1,321
Jul 2000021028.534.09$859
Jun 20000029.304.40$0
May 2000046127.263.68$1,696
Apr 2000024324.513.12$757
Mar 2000047528.422.86$1,358
Feb 20000027.622.73$0
Jan 2000049225.272.48$1,220
Dec 1999042324.282.42$1,025
Nov 1999046123.192.43$1,122
Oct 1999019320.982.80$541
Sep 1999066221.752.62$1,734
Aug 1999047419.262.88$1,363
Jul 1999065917.892.37$1,563
Jun 1999035615.942.36$841
May 1999046015.792.32$1,068
Apr 199901,01915.102.21$2,250
Mar 1999036012.471.84$662
Feb 199906209.981.82$1,127
Jan 1999081710.381.90$1,552
Dec 199805199.201.77$920
Nov 1998062110.892.19$1,357
Oct 1998073312.421.97$1,443
Sep 1998090512.592.08$1,885
Aug 1998072311.301.91$1,379
Jul 1998044211.742.24$989
Jun 1998032011.242.24$716
May 1998036712.622.21$810
Apr 1998055813.042.51$1,398
Mar 1998041612.802.31$961
Feb 1998057913.952.30$1,331
Jan 1998045914.702.15$989
Dec 1997033316.322.41$803
Nov 1997048418.193.09$1,495
Oct 1997029419.253.15$926
Sep 1997045617.742.95$1,347
Aug 1997022217.862.55$567
Jul 1997029617.582.25$665
Jun 1997017617.242.26$397
May 1997448918.972.31$1,205
Apr 1997030017.882.08$625
Mar 1997011318.951.94$219
Feb 199709420.492.21$207
Jan 1997020723.483.54$733
Dec 1996010023.32$0
Nov 1996051821.97$0
Oct 1996047823.31$0
Sep 199605922.22$0
Aug 1996045620.26$0
Jul 1996012619.55$0
Jun 199602318.73$0
May 1996010219.43$0
Apr 199619921.51$22
Mar 1996011319.38$0
Feb 1996011116.98$0
Jan 199608817.07$0
Dec 1995012517.19$0
Nov 199509416.00$0
Oct 1995012415.43$0
Sep 1995013316.18$0
Aug 199509115.92$0
Jul 1995012915.24$0
Jun 199507816.41$0
May 199508417.56$0
Apr 199505317.73$0
Mar 199508716.44$0
Feb 199506116.58$0
Jan 1995011915.92$0
Dec 1994015315.03$0
Nov 199418215.90$16
Oct 1994010815.58$0
Sep 1994011815.29$0
Aug 199409016.13$0
Jul 199408117.56$0
Jun 199407817.09$0
May 199407415.88$0
Apr 199408114.14$0
Mar 199409212.46$0
Feb 199408712.50$0
Jan 1994013912.66$0
Dec 199313912.33$12
Nov 199302314.49$0
Oct 199301215.85$0
Sep 199307815.03$0
Aug 199306215.66$0
Jul 1993011515.46$0
Jun 199304116.79$0
May 19930917.68$0
Apr 1993037018.05$0
Mar 199316518.14$18
Feb 199314317.90$18
Jan 199306716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2007 — as filed, then multipliedworked
Condensate             3 bbl  × $ 62.00 =       $186
Gas                    0 Mcf  × $  7.55 =         $0

────────────────────────────────────────────────────
Month total                                     $186

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/60261 is the state's own key, not one this site invented.