CARSON, IRA 2D

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 75173District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$255 k
Jan 1993 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition21 bbl$1,359
GasProduction88,115 Mcf$253,676
Total$255,035

30,098 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4566, -101.4732. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45655, -101.47317 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,100 ft.

Completions filed
Nov 1977
1 of 1 wells

1 well

42-105316881027,100 ftNov 1977

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 2026117698.932.87$604
Mar 20260089.753.15$0
Feb 2026115963.503.75$660
Jan 2026218659.138.00$1,606
Dec 2025218356.664.41$921
Nov 2025114258.593.93$616
Oct 2025117159.383.30$625
Sep 2025116762.743.08$577
Aug 2025217263.933.01$646
Jul 2025117866.743.32$657
Jun 2025116066.483.13$567
May 2025216060.553.23$638
Apr 2025214962.363.54$653
Mar 2025215767.704.27$806
Feb 2025214470.884.34$767
Jan 20250074.324.28$0
Dec 2024014868.993.12$462
Nov 2024014669.052.20$321
Oct 2024014971.372.28$340
Sep 2024014569.612.36$343
Aug 2024016275.632.06$334
Jul 2024015679.932.15$335
Jun 2024015878.082.63$416
May 2024015778.812.20$345
Apr 2024015984.451.66$264
Mar 2024016080.301.55$247
Feb 2024013976.091.78$248
Jan 2024014973.023.30$491
Dec 2023015271.262.61$397
Nov 2023016277.892.81$455
Oct 2023016385.443.09$503
Sep 2023017489.042.74$476
Aug 2023016580.522.67$441
Jul 2023018074.852.64$476
Jun 2023016468.962.26$370
May 2023018570.622.23$412
Apr 2023015578.122.24$347
Mar 2023015972.852.39$381
Feb 2023014975.112.47$367
Jan 2023012376.533.39$417
Dec 2022011676.415.73$665
Nov 202209085.005.65$508
Oct 202204987.185.86$287
Sep 202203084.888.16$245
Aug 202206094.529.13$548
Jul 2022069101.587.54$520
Jun 2022095115.097.98$758
May 2022039109.378.43$329
Apr 2022064104.226.84$438
Mar 20220108108.885.08$548
Feb 2022013891.054.86$671
Jan 2022011481.844.54$517
Dec 202101571.323.90$58
Nov 202107677.435.24$398
Oct 202107279.795.71$411
Sep 2021014369.865.35$765
Aug 2021017866.024.22$751
Jul 2021014470.783.98$573
Jun 2021012369.493.38$416
May 2021065063.483.02$1,961
Apr 202101,48660.362.76$4,099
Mar 2021042061.302.72$1,141
Feb 202102457.805.55$133
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 201905153.112.30$118
Jul 20190256.272.46$5
Jun 201904352.782.49$107
May 201903958.482.74$107
Apr 2019014262.632.75$391
Mar 2019014356.803.06$438
Feb 2019013850.852.79$385
Jan 2019011446.033.23$368
Dec 2018013546.594.19$565
Nov 2018012952.934.24$547
Oct 2018010461.443.40$353
Sep 201809159.543.11$283
Aug 201808659.403.07$264
Jul 201808865.142.93$258
Jun 2018012660.183.08$388
May 2018018365.382.90$531
Apr 2018026463.842.90$766
Mar 2018036661.222.79$1,020
Feb 201809661.782.77$266
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170243.873.09$6
Jun 20170642.493.09$19
May 20170745.373.26$23
Apr 20170847.933.21$26
Mar 20170446.772.98$12
Feb 20170050.452.95$0
Jan 20170249.413.42$7
Dec 20160248.763.72$7
Nov 20160642.492.64$16
Oct 201601146.193.09$34
Sep 201601141.553.10$34
Aug 201601741.442.92$50
Jul 2016011441.622.92$333
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 201601926.472.06$39
Jan 201607427.352.36$175
Dec 2015015532.362.00$310
Nov 2015015138.792.17$327
Oct 2015015543.552.43$376
Sep 2015013842.992.76$381
Aug 2015012440.162.87$356
Jul 2015014948.152.95$439
Jun 2015013256.152.88$381
May 2015015755.212.96$464
Apr 2015014849.822.71$401
Mar 2015014942.892.93$437
Feb 2015012944.662.98$384
Jan 2015013143.433.10$406
Dec 2014014854.693.59$532
Nov 2014015370.464.25$651
Oct 2014015178.303.90$589
Sep 2014016686.164.05$672
Aug 2014016789.394.04$674
Jul 2014016596.564.18$690
Jun 2014017098.164.74$805
May 2014017294.734.73$813
Apr 2014016095.944.81$769
Mar 2014017495.895.06$880
Feb 2014015297.406.19$941
Jan 2014017190.404.86$831
Dec 2013016891.824.35$732
Nov 2013016688.853.74$621
Oct 2013017597.423.78$661
Sep 20130165104.113.72$613
Aug 20130174104.253.52$613
Jul 20130170102.523.72$632
Jun 2013018094.403.93$708
May 2013015794.834.15$651
Apr 2013017793.964.28$758
Mar 2013015393.623.91$599
Feb 2013015491.233.42$527
Jan 2013016691.603.42$568
Dec 2012018286.773.42$622
Nov 2012018386.953.62$663
Oct 2012019289.383.40$653
Sep 2012017994.672.92$522
Aug 2012016692.662.91$483
Jul 2012017785.133.02$535
Jun 2012016979.822.52$426
May 2012018891.612.49$468
Apr 20120195101.652.00$389
Mar 20120163105.052.22$362
Feb 20120167101.102.57$429
Jan 2012016998.092.73$462
Dec 2011016896.873.24$544
Nov 2011016895.723.31$556
Oct 2011017284.983.65$628
Sep 2011018583.623.99$737
Aug 2011017983.404.15$743
Jul 2011019394.144.52$872
Jun 2011017392.904.64$803
May 2011019298.134.40$846
Apr 20110179105.964.33$776
Mar 2011018296.364.06$738
Feb 2011017985.644.18$748
Jan 2011018386.504.59$840
Dec 2010020685.734.35$896
Nov 2010017580.843.80$664
Oct 2010018678.103.51$653
Sep 2010017472.633.98$692
Aug 2010017773.684.42$782
Jul 2010017372.554.74$819
Jun 2010017270.364.91$845
May 2010020871.124.24$881
Apr 2010016681.694.12$684
Mar 2010018678.394.39$816
Feb 2010016573.585.44$898
Jan 2010018874.365.96$1,121
Dec 2009016471.445.48$899
Nov 2009016574.593.75$619
Oct 2009017772.544.11$728
Sep 2009016665.543.06$509
Aug 2009017567.423.22$563
Jul 2009017561.133.46$606
Jun 2009017466.163.90$678
May 2009019654.743.93$769
Apr 2009019146.773.59$685
Mar 2009019742.144.06$800
Feb 2009017432.814.63$806
Jan 2009020135.865.37$1,080
Dec 2008018537.105.98$1,106
Nov 2008019355.496.86$1,324
Oct 2008021175.246.92$1,461
Sep 20080164101.767.88$1,292
Aug 20080193114.228.48$1,637
Jul 20080198131.0811.39$2,255
Jun 20080189131.3313.03$2,463
May 20080196123.1711.57$2,269
Apr 20080195110.3110.45$2,039
Mar 20080188101.909.66$1,817
Feb 2008018992.538.77$1,658
Jan 2008019990.388.21$1,633
Dec 2007037988.337.30$2,767
Nov 2007017791.677.29$1,291
Oct 2007020982.856.92$1,447
Sep 2007019875.846.24$1,236
Aug 2007020069.066.39$1,278
Jul 2007019970.906.39$1,271
Jun 2007019862.007.55$1,495
May 2007014758.747.85$1,153
Apr 2007021059.617.81$1,639
Mar 2007012956.927.30$942
Feb 2007017655.108.22$1,446
Jan 2007021550.306.73$1,446
Dec 2006021656.656.92$1,494
Nov 2006019354.207.62$1,470
Oct 2006035654.906.01$2,141
Sep 2006019360.085.04$972
Aug 2006019268.717.34$1,409
Jul 2006022469.376.34$1,421
Jun 2006021366.286.38$1,360
May 2006014066.016.42$900
Apr 200609064.397.36$662
Mar 2006022156.707.08$1,565
Feb 2006013657.597.75$1,054
Jan 2006018060.598.93$1,608
Dec 2005021654.9413.42$2,898
Nov 2005017254.6910.59$1,821
Oct 2005020958.3413.80$2,883
Sep 2005018061.4512.08$2,174
Aug 2005018861.519.80$1,842
Jul 2005021755.697.84$1,702
Jun 2005023052.337.38$1,698
May 2005017645.226.65$1,171
Apr 2005020149.207.36$1,479
Mar 2005020850.377.15$1,488
Feb 2005021445.226.31$1,351
Jan 2005019243.166.32$1,214
Dec 2004025139.866.75$1,695
Nov 2004020845.286.33$1,317
Oct 2004023349.706.52$1,518
Sep 2004025143.245.28$1,326
Aug 200406242.375.55$344
Jul 2004011138.286.08$675
Jun 2004024536.106.43$1,576
May 2004027537.486.49$1,786
Apr 2004024534.475.86$1,435
Mar 2004024334.365.53$1,344
Feb 2004025432.455.51$1,399
Jan 2004025232.036.30$1,588
Dec 2003023630.266.30$1,487
Nov 2003023328.804.60$1,071
Oct 2003024128.174.76$1,147
Sep 2003025926.314.75$1,230
Aug 2003028629.765.13$1,467
Jul 2003015329.415.17$791
Jun 2003019128.565.98$1,143
May 2003020726.595.97$1,236
Apr 2003017026.675.41$919
Mar 2003019431.146.10$1,183
Feb 2003018233.487.93$1,443
Jan 2003019130.315.58$1,066
Dec 2002021426.914.85$1,039
Nov 2002019824.664.14$819
Oct 2002021526.464.23$909
Sep 2002020527.443.64$745
Aug 2002021425.963.16$677
Jul 2002025924.583.06$793
Jun 2002023123.733.34$771
May 200201424.663.58$50
Apr 200206323.653.51$221
Mar 2002015022.003.10$465
Feb 2002020418.222.38$485
Jan 2002014317.172.38$340
Dec 2001023416.932.36$553
Nov 2001025618.072.41$616
Oct 2001025719.782.53$650
Sep 2001024124.262.25$543
Aug 2001027324.873.05$834
Jul 2001025723.933.20$822
Jun 2001026024.563.82$994
May 2001026525.524.31$1,141
Apr 2001025424.685.34$1,355
Mar 2001026724.545.38$1,436
Feb 2001025827.755.77$1,488
Jan 2001029327.478.40$2,461
Dec 200004126.889.12$374
Nov 2000022532.215.66$1,273
Oct 2000023731.235.15$1,219
Sep 2000025031.875.19$1,297
Aug 2000025929.644.54$1,176
Jul 200006428.534.09$262
Jun 2000019529.304.40$857
May 2000024627.263.68$905
Apr 2000021824.513.12$679
Mar 2000023328.422.86$666
Feb 2000020927.622.73$570
Jan 2000023525.272.48$583
Dec 1999024024.282.42$582
Nov 1999021423.192.43$521
Oct 1999026320.982.80$737
Sep 1999021921.752.62$574
Aug 1999025819.262.88$742
Jul 1999013717.892.37$325
Jun 1999017915.942.36$423
May 1999025715.792.32$597
Apr 1999018415.102.21$406
Mar 1999021412.471.84$393
Feb 199901619.981.82$293
Jan 1999019010.381.90$361
Dec 199802149.201.77$379
Nov 1998021010.892.19$459
Oct 1998023312.421.97$459
Sep 1998024312.592.08$506
Aug 1998026711.301.91$509
Jul 1998028311.742.24$633
Jun 1998029511.242.24$660
May 1998026012.622.21$574
Apr 1998025213.042.51$631
Mar 1998027112.802.31$626
Feb 1998025513.952.30$586
Jan 1998027114.702.15$584
Dec 1997030116.322.41$726
Nov 1997020118.193.09$621
Oct 1997024819.253.15$781
Sep 1997023517.742.95$694
Aug 1997032217.862.55$823
Jul 1997017217.582.25$386
Jun 1997014217.242.26$321
May 1997022518.972.31$519
Apr 1997026717.882.08$556
Mar 1997027818.951.94$539
Feb 1997023620.492.21$521
Jan 1997024123.483.54$853
Dec 1996017823.32$0
Nov 1996024821.97$0
Oct 1996023423.31$0
Sep 1996029322.22$0
Aug 1996027520.26$0
Jul 1996018519.55$0
Jun 1996026818.73$0
May 1996015319.43$0
Apr 1996026121.51$0
Mar 1996021119.38$0
Feb 1996020416.98$0
Jan 1996024417.07$0
Dec 1995023217.19$0
Nov 1995025916.00$0
Oct 1995025415.43$0
Sep 1995026816.18$0
Aug 1995028415.92$0
Jul 1995025115.24$0
Jun 1995096716.41$0
May 199501,33817.56$0
Apr 199501,16617.73$0
Mar 199501,06416.44$0
Feb 199501,03216.58$0
Jan 199501,14515.92$0
Dec 199401,10415.03$0
Nov 199401,17215.90$0
Oct 199401,34815.58$0
Sep 199401,20215.29$0
Aug 199401,26716.13$0
Jul 199401,17617.56$0
Jun 199401,10717.09$0
May 199401,04115.88$0
Apr 199401,12814.14$0
Mar 199401,14312.46$0
Feb 199401,18012.50$0
Jan 199401,31712.66$0
Dec 1993080212.33$0
Nov 199301,23114.49$0
Oct 1993030915.85$0
Sep 1993020515.03$0
Aug 1993023315.66$0
Jul 1993028815.46$0
Jun 1993031316.79$0
May 1993025917.68$0
Apr 1993027818.05$0
Mar 1993044918.14$0
Feb 1993029917.90$0
Jan 1993023316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $ 98.93 =        $99
Gas                  176 Mcf  × $  2.87 =       $505

────────────────────────────────────────────────────
Month total                                     $604

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/75173 is the state's own key, not one this site invented.