MONTGOMERY, C. C. "12C"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 75179District 7CField 67995200CondensateGasSaveExport
Value, all time
$188 k
Jan 1993 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition36 bbl$951
GasProduction68,080 Mcf$186,563
Total$187,514

21,806 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4886, -101.2986. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.48858, -101.29857 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,700 ft.

Completions filed
Jan 1978
1 of 1 wells

1 well

42-1053168526,700 ftJan 1978

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026054106.413.05$164
Apr 202607298.932.87$207
Mar 20260089.753.15$0
Feb 202604963.503.75$184
Jan 202605659.138.00$448
Dec 202515356.664.41$291
Nov 202505258.593.93$204
Oct 202505259.383.30$172
Sep 202504562.743.08$138
Aug 202504863.933.01$145
Jul 202505366.743.32$176
Jun 202507466.483.13$232
May 202517460.553.23$300
Apr 202517362.363.54$321
Mar 202516067.704.27$324
Feb 2025211170.884.34$624
Jan 20250074.324.28$0
Dec 202406268.993.12$194
Nov 202407569.052.20$165
Oct 202408671.372.28$196
Sep 202406969.612.36$163
Aug 202409575.632.06$196
Jul 202405779.932.15$122
Jun 202408778.082.63$229
May 202408178.812.20$178
Apr 202407384.451.66$121
Mar 202405180.301.55$79
Feb 202406776.091.78$120
Jan 202406773.023.30$221
Dec 202307171.262.61$185
Nov 202306277.892.81$174
Oct 202307185.443.09$219
Sep 202307289.042.74$197
Aug 202306380.522.67$168
Jul 202306474.852.64$169
Jun 202307468.962.26$167
May 202308170.622.23$180
Apr 202306978.122.24$154
Mar 202307772.852.39$184
Feb 202304275.112.47$104
Jan 202306176.533.39$207
Dec 202204076.415.73$229
Nov 202204585.005.65$254
Oct 202203487.185.86$199
Sep 202206084.888.16$490
Aug 202204094.529.13$365
Jul 2022058101.587.54$437
Jun 2022064115.097.98$511
May 2022056109.378.43$472
Apr 2022059104.226.84$403
Mar 2022064108.885.08$325
Feb 202204791.054.86$228
Jan 202206081.844.54$272
Dec 202106671.323.90$257
Nov 202106577.435.24$340
Oct 202106979.795.71$394
Sep 202106569.865.35$348
Aug 202107466.024.22$312
Jul 202107370.783.98$291
Jun 202106869.493.38$230
May 202105563.483.02$166
Apr 202107360.362.76$201
Mar 202107461.302.72$201
Feb 202107157.805.55$394
Jan 202101,00850.412.81$2,833
Dec 2020017644.642.68$471
Nov 2020018938.772.71$512
Oct 2020020136.972.48$498
Sep 2020017137.091.99$340
Aug 2020018939.982.39$451
Jul 2020019138.371.83$349
Jun 2020019134.901.69$323
May 2020020216.921.81$367
Apr 2020022314.751.80$402
Mar 2020037430.341.86$694
Feb 202007249.881.98$143
Jan 202006357.252.09$132
Dec 201906459.012.30$147
Nov 201907055.302.75$193
Oct 201906953.472.42$167
Sep 201906555.052.66$173
Aug 201906853.112.30$157
Jul 201906956.272.46$170
Jun 201907052.782.49$174
May 201906558.482.74$178
Apr 201905862.632.75$160
Mar 201905856.803.06$178
Feb 201906450.852.79$179
Jan 201906946.033.23$223
Dec 201807046.594.19$293
Nov 201806852.934.24$288
Oct 201806661.443.40$224
Sep 201806659.543.11$205
Aug 201806159.403.07$187
Jul 201806765.142.93$196
Jun 201807460.183.08$228
May 201808465.382.90$244
Apr 201802863.842.90$81
Mar 201807561.222.79$209
Feb 201803061.782.77$83
Jan 201803262.874.01$128
Dec 201704957.272.92$143
Nov 201702055.423.12$62
Oct 201704849.292.98$143
Sep 201705147.523.09$157
Aug 201704845.373.00$144
Jul 201706243.873.09$191
Jun 201703442.493.09$105
May 201703545.373.26$114
Apr 201702947.933.21$93
Mar 201703046.772.98$90
Feb 201706550.452.95$192
Jan 2017012149.413.42$414
Dec 201603948.763.72$145
Nov 201603342.492.64$87
Oct 201604046.193.09$124
Sep 201601941.553.10$59
Aug 20160641.442.92$18
Jul 201602741.622.92$79
Jun 201602945.352.69$78
May 201603242.521.99$64
Apr 201603536.561.99$70
Mar 201603733.011.79$66
Feb 201602726.472.06$56
Jan 201603227.352.36$76
Dec 201503432.362.00$68
Nov 201503238.792.17$69
Oct 201504043.552.43$97
Sep 201503042.992.76$83
Aug 201503140.162.87$89
Jul 201503748.152.95$109
Jun 201504056.152.88$115
May 201504755.212.96$139
Apr 201504349.822.71$116
Mar 201504442.892.93$129
Feb 201503544.662.98$104
Jan 201504843.433.10$149
Dec 20140454.693.59$14
Nov 201403070.464.25$128
Oct 201402978.303.90$113
Sep 201402786.164.05$109
Aug 201403389.394.04$133
Jul 201403096.564.18$125
Jun 201403098.164.74$142
May 201403394.734.73$156
Apr 201403595.944.81$168
Mar 201403795.895.06$187
Feb 201403197.406.19$192
Jan 201403490.404.86$165
Dec 201303591.824.35$152
Nov 201303688.853.74$135
Oct 201303697.423.78$136
Sep 2013039104.113.72$145
Aug 2013039104.253.52$137
Jul 2013041102.523.72$152
Jun 201304294.403.93$165
May 201304194.834.15$170
Apr 201304293.964.28$180
Mar 201304193.623.91$160
Feb 201303791.233.42$127
Jan 201304091.603.42$137
Dec 201204186.773.42$140
Nov 201204486.953.62$160
Oct 201203689.383.40$122
Sep 201203894.672.92$111
Aug 201204492.662.91$128
Jul 201203885.133.02$115
Jun 201204079.822.52$101
May 201203591.612.49$87
Apr 2012039101.652.00$78
Mar 2012041105.052.22$91
Feb 2012036101.102.57$93
Jan 201204098.092.73$109
Dec 201104396.873.24$139
Nov 201104495.723.31$146
Oct 201105084.983.65$182
Sep 201104683.623.99$183
Aug 201104683.404.15$191
Jul 201104794.144.52$212
Jun 201104992.904.64$227
May 201105198.134.40$225
Apr 2011051105.964.33$221
Mar 201105596.364.06$223
Feb 201104585.644.18$188
Jan 201105486.504.59$248
Dec 201005485.734.35$235
Nov 201005680.843.80$213
Oct 201005878.103.51$204
Sep 201004872.633.98$191
Aug 201005573.684.42$243
Jul 201005572.554.74$261
Jun 201005270.364.91$255
May 201005671.124.24$237
Apr 201005281.694.12$214
Mar 201005678.394.39$246
Feb 201005373.585.44$288
Jan 201005874.365.96$346
Dec 200906171.445.48$335
Nov 200906274.593.75$233
Oct 200906172.544.11$251
Sep 200905965.543.06$181
Aug 200906067.423.22$193
Jul 200906461.133.46$222
Jun 200906666.163.90$257
May 200907154.743.93$279
Apr 200906446.773.59$230
Mar 200906942.144.06$280
Feb 200906732.814.63$310
Jan 200909235.865.37$494
Dec 200806537.105.98$389
Nov 200806255.496.86$425
Oct 200806875.246.92$471
Sep 2008057101.767.88$449
Aug 2008067114.228.48$568
Jul 2008029131.0811.39$330
Jun 2008022131.3313.03$287
May 2008061123.1711.57$706
Apr 2008061110.3110.45$638
Mar 2008062101.909.66$599
Feb 200805892.538.77$509
Jan 200806290.388.21$509
Dec 200709488.337.30$686
Nov 200709491.677.29$685
Oct 2007010982.856.92$755
Sep 200709275.846.24$574
Aug 200708869.066.39$562
Jul 2007010170.906.39$645
Jun 2007013362.007.55$1,004
May 2007010158.747.85$792
Apr 2007010559.617.81$820
Mar 2007012956.927.30$942
Feb 2007013455.108.22$1,101
Jan 2007013450.306.73$901
Dec 2006016456.656.92$1,135
Nov 2006016454.207.62$1,249
Oct 2006014854.906.01$890
Sep 2006015160.085.04$761
Aug 2006017068.717.34$1,248
Jul 2006016869.376.34$1,066
Jun 2006014166.286.38$900
May 2006014966.016.42$957
Apr 2006017264.397.36$1,266
Mar 2006015656.707.08$1,105
Feb 200608757.597.75$674
Jan 2006016560.598.93$1,474
Dec 2005020054.9413.42$2,683
Nov 2005017754.6910.59$1,874
Oct 2005024158.3413.80$3,325
Sep 2005020861.4512.08$2,512
Aug 2005017861.519.80$1,744
Jul 2005026055.697.84$2,039
Jun 2005025152.337.38$1,853
May 2005013545.226.65$898
Apr 2005010749.207.36$788
Mar 2005018250.377.15$1,302
Feb 2005011545.226.31$726
Jan 2005011243.166.32$708
Dec 2004017239.866.75$1,161
Nov 2004014945.286.33$943
Oct 2004014149.706.52$919
Sep 2004015043.245.28$793
Aug 2004015742.375.55$871
Jul 2004024638.286.08$1,497
Jun 2004028336.106.43$1,821
May 2004022237.486.49$1,442
Apr 2004023634.475.86$1,383
Mar 2004025934.365.53$1,432
Feb 2004027932.455.51$1,537
Jan 2004035132.036.30$2,211
Dec 2003024030.266.30$1,512
Nov 2003033528.804.60$1,539
Oct 2003025028.174.76$1,190
Sep 2003030226.314.75$1,434
Aug 2003019829.765.13$1,016
Jul 2003022829.415.17$1,179
Jun 2003024628.565.98$1,472
May 2003025126.595.97$1,499
Apr 2003021526.675.41$1,163
Mar 2003020431.146.10$1,244
Feb 2003019133.487.93$1,514
Jan 2003022030.315.58$1,228
Dec 2002020426.914.85$990
Nov 2002020724.664.14$856
Oct 2002022426.464.23$947
Sep 2002017927.443.64$651
Aug 2002022825.963.16$721
Jul 2002022324.583.06$683
Jun 2002022723.733.34$758
May 2002022624.663.58$810
Apr 2002026623.653.51$934
Mar 2002017122.003.10$531
Feb 2002020918.222.38$497
Jan 2002022217.172.38$527
Dec 2001022916.932.36$541
Nov 2001026018.072.41$625
Oct 2001025319.782.53$640
Sep 2001022524.262.25$507
Aug 2001021324.873.05$650
Jul 2001023423.933.20$748
Jun 2001018324.563.82$700
May 2001023925.524.31$1,029
Apr 2001020824.685.34$1,110
Mar 2001019624.545.38$1,054
Feb 2001013427.755.77$773
Jan 2001010427.478.40$873
Dec 2000018426.889.12$1,679
Nov 2000026632.215.66$1,505
Oct 2000022131.235.15$1,137
Sep 2000018431.875.19$954
Aug 2000020729.644.54$940
Jul 2000021128.534.09$863
Jun 2000021429.304.40$941
May 2000030127.263.68$1,108
Apr 2000027424.513.12$854
Mar 2000023528.422.86$672
Feb 2000026927.622.73$733
Jan 2000030725.272.48$762
Dec 1999034324.282.42$831
Nov 1999033823.192.43$823
Oct 1999036520.982.80$1,023
Sep 1999033621.752.62$880
Aug 1999039119.262.88$1,124
Jul 1999029817.892.37$707
Jun 1999039315.942.36$928
May 1999029615.792.32$687
Apr 1999025915.102.21$572
Mar 1999034612.471.84$636
Feb 199903539.981.82$642
Jan 1999034010.381.90$646
Dec 199804389.201.77$777
Nov 1998031810.892.19$695
Oct 1998031312.421.97$616
Sep 1998031312.592.08$652
Aug 1998033211.301.91$633
Jul 1998034811.742.24$779
Jun 1998029711.242.24$664
May 1998035612.622.21$785
Apr 1998033613.042.51$842
Mar 1998034812.802.31$804
Feb 1998034613.952.30$796
Jan 1998041114.702.15$886
Dec 1997041816.322.41$1,008
Nov 1997041018.193.09$1,266
Oct 1997033719.253.15$1,061
Sep 1997035717.742.95$1,055
Aug 1997043617.862.55$1,114
Jul 1997044917.582.25$1,009
Jun 1997443217.242.26$1,044
May 19972642718.972.31$1,479
Apr 1997046417.882.08$966
Mar 1997051718.951.94$1,003
Feb 1997044020.492.21$971
Jan 1997044623.483.54$1,579
Dec 1996048723.32$0
Nov 1996011921.97$0
Oct 1996039723.31$0
Sep 1996042722.22$0
Aug 1996042220.26$0
Jul 1996038319.55$0
Jun 1996029818.73$0
May 1996023419.43$0
Apr 1996028221.51$0
Mar 1996024719.38$0
Feb 1996033116.98$0
Jan 1996040617.07$0
Dec 1995050017.19$0
Nov 1995024916.00$0
Oct 1995065615.43$0
Sep 1995051116.18$0
Aug 1995039015.92$0
Jul 1995044815.24$0
Jun 1995034216.41$0
May 1995047617.56$0
Apr 1995041117.73$0
Mar 1995037116.44$0
Feb 1995050516.58$0
Jan 1995053915.92$0
Dec 1994041615.03$0
Nov 1994053115.90$0
Oct 1994066915.58$0
Sep 1994068315.29$0
Aug 1994058016.13$0
Jul 1994065717.56$0
Jun 1994074817.09$0
May 1994060615.88$0
Apr 1994061314.14$0
Mar 1994070912.46$0
Feb 1994054712.50$0
Jan 1994057012.66$0
Dec 1993050112.33$0
Nov 1993035214.49$0
Oct 1993028215.85$0
Sep 1993032515.03$0
Aug 1993042415.66$0
Jul 1993033415.46$0
Jun 1993043216.79$0
May 1993032417.68$0
Apr 1993060318.05$0
Mar 1993056418.14$0
Feb 1993048117.90$0
Jan 1993042416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   54 Mcf  × $  3.05 =       $164

────────────────────────────────────────────────────
Month total                                     $164

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/75179 is the state's own key, not one this site invented.