MOORE, MAGGIE "F"

Operated by DISCOVERY NATURAL RESOURCES LLC (P-5 220855) in the ADAMS-BAGGETT RANCH (CANYON SD.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 76208District 7CField 00636500CondensateGasSaveExport
Value, all time
$162 k
Jan 1993 – May 2017
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
293
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 615 leases and 615 wells, and the rule below applies to all of them.

Discovered
1969-02-01
as the register files it
Field class
Gas
the register's own label
Between wells
330 ft
minimum
From a lease line
165 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 2007-10-09.

The Commission's schedule remark for this field reads: THE ALLOCATION FORMULA.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14 bbl$454
GasProduction46,416 Mcf$162,029
Total$162,484

11,971 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4437, -101.0199. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.44367, -101.01989 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,313 ft
1 wells filed one
Completion to plug
39.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,313 ft.

Completions filed
Jan 1978
1 of 1 wells
Plug dates filed
May 2017
1 of 1 wells

Last completion to plug: a median of 39.3 years across the 1 well that filed both dates, with the middle half between 39.3 years and 39.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1053180825,313 ftJan 1978May 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (293)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

293 months

May 20170045.373.26$0
Apr 2017011347.933.21$363
Mar 2017016446.772.98$489
Feb 2017011350.452.95$334
Jan 2017010349.413.42$352
Dec 2016011148.763.72$413
Nov 201606342.492.64$167
Oct 2016011946.193.09$368
Sep 2016012841.553.10$397
Aug 2016016741.442.92$488
Jul 2016015641.622.92$456
Jun 201607945.352.69$212
May 2016014342.521.99$285
Apr 2016011836.561.99$235
Mar 201608733.011.79$156
Feb 2016011326.472.06$233
Jan 2016011827.352.36$279
Dec 2015010632.362.00$212
Nov 201509938.792.17$215
Oct 201508743.552.43$211
Sep 2015011142.992.76$306
Aug 201505040.162.87$144
Jul 201508648.152.95$253
Jun 201507756.152.88$222
May 201507655.212.96$225
Apr 201507149.822.71$192
Mar 201508842.892.93$258
Feb 201505844.662.98$173
Jan 201508143.433.10$251
Dec 201407054.693.59$251
Nov 201402170.464.25$89
Oct 2014010678.303.90$414
Sep 2014012486.164.05$502
Aug 201402289.394.04$89
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140595.895.06$25
Feb 201402597.406.19$155
Jan 201403890.404.86$185
Dec 201303891.824.35$165
Nov 201304088.853.74$150
Oct 201305697.423.78$212
Sep 2013072104.113.72$268
Aug 20130100104.253.52$352
Jul 2013064102.523.72$238
Jun 201308694.403.93$338
May 2013011794.834.15$485
Apr 2013010393.964.28$441
Mar 201308593.623.91$333
Feb 201306691.233.42$226
Jan 2013011991.603.42$407
Dec 201207586.773.42$257
Nov 201209986.953.62$359
Oct 201208889.383.40$299
Sep 201208594.672.92$248
Aug 201209592.662.91$276
Jul 201207185.133.02$214
Jun 2012015779.822.52$395
May 2012019691.612.49$488
Apr 20120133101.652.00$266
Mar 2012074105.052.22$164
Feb 2012083101.102.57$213
Jan 2012013398.092.73$364
Dec 201108296.873.24$266
Nov 2011011095.723.31$364
Oct 2011010184.983.65$369
Sep 2011010483.623.99$415
Aug 2011019583.404.15$809
Jul 2011012994.144.52$583
Jun 2011015092.904.64$696
May 2011017798.134.40$780
Apr 20110166105.964.33$719
Mar 201107896.364.06$316
Feb 201108185.644.18$339
Jan 2011010286.504.59$468
Dec 201009885.734.35$426
Nov 2010017680.843.80$668
Oct 2010017678.103.51$618
Sep 2010018572.633.98$736
Aug 201007573.684.42$331
Jul 2010010172.554.74$478
Jun 2010014670.364.91$717
May 2010028771.124.24$1,216
Apr 2010027681.694.12$1,138
Mar 2010010178.394.39$443
Feb 2010010873.585.44$588
Jan 2010015474.365.96$918
Dec 2009016671.445.48$910
Nov 2009016674.593.75$623
Oct 2009013772.544.11$563
Sep 2009011265.543.06$343
Aug 2009012167.423.22$389
Jul 2009013061.133.46$450
Jun 2009012266.163.90$475
May 2009014954.743.93$585
Apr 200909546.773.59$341
Mar 2009011342.144.06$459
Feb 200909332.814.63$431
Jan 2009010835.865.37$580
Dec 2008019137.105.98$1,142
Nov 2008014855.496.86$1,015
Oct 2008013175.246.92$907
Sep 20080164101.767.88$1,292
Aug 20080190114.228.48$1,612
Jul 20080104131.0811.39$1,185
Jun 20080148131.3313.03$1,929
May 20080179123.1711.57$2,072
Apr 20080147110.3110.45$1,537
Mar 20080152101.909.66$1,469
Feb 2008014092.538.77$1,228
Jan 2008025490.388.21$2,084
Dec 2007016888.337.30$1,227
Nov 2007019991.677.29$1,451
Oct 2007035782.856.92$2,471
Sep 2007015775.846.24$980
Aug 2007050169.066.39$3,200
Jul 2007015570.906.39$990
Jun 2007016362.007.55$1,230
May 2007027858.747.85$2,181
Apr 2007024059.617.81$1,873
Mar 2007017556.927.30$1,278
Feb 2007013855.108.22$1,134
Jan 2007013050.306.73$874
Dec 200603956.656.92$270
Nov 200604454.207.62$335
Oct 200608354.906.01$499
Sep 2006020060.085.04$1,007
Aug 2006019768.717.34$1,446
Jul 2006021669.376.34$1,370
Jun 2006020666.286.38$1,315
May 2006033966.016.42$2,178
Apr 2006013864.397.36$1,016
Mar 200609456.707.08$666
Feb 2006020557.597.75$1,589
Jan 2006014060.598.93$1,251
Dec 2005012454.9413.42$1,664
Nov 2005010054.6910.59$1,059
Oct 2005014758.3413.80$2,028
Sep 2005017561.4512.08$2,114
Aug 2005020161.519.80$1,969
Jul 2005019155.697.84$1,498
Jun 200508952.337.38$657
May 2005010645.226.65$705
Apr 2005016249.207.36$1,192
Mar 2005020550.377.15$1,467
Feb 2005026345.226.31$1,660
Jan 2005018243.166.32$1,151
Dec 2004017039.866.75$1,148
Nov 2004014645.286.33$924
Oct 2004014149.706.52$919
Sep 2004017643.245.28$930
Aug 2004023042.375.55$1,277
Jul 2004012638.286.08$767
Jun 2004016536.106.43$1,061
May 2004020537.486.49$1,331
Apr 2004022434.475.86$1,312
Mar 2004022034.365.53$1,217
Feb 20041419732.455.51$1,540
Jan 2004015932.036.30$1,002
Dec 2003016130.266.30$1,015
Nov 200307428.804.60$340
Oct 200304328.174.76$205
Sep 200307426.314.75$351
Aug 2003011329.765.13$580
Jul 2003010329.415.17$533
Jun 2003013828.565.98$826
May 200309926.595.97$591
Apr 2003010626.675.41$573
Mar 2003012631.146.10$768
Feb 200307033.487.93$555
Jan 2003012230.315.58$681
Dec 2002017326.914.85$840
Nov 2002012324.664.14$509
Oct 2002015526.464.23$656
Sep 2002020627.443.64$749
Aug 2002017625.963.16$557
Jul 2002026224.583.06$802
Jun 2002023623.733.34$788
May 2002029424.663.58$1,054
Apr 2002017923.653.51$629
Mar 2002023622.003.10$732
Feb 2002020718.222.38$492
Jan 2002015517.172.38$368
Dec 2001026516.932.36$627
Nov 2001018618.072.41$447
Oct 2001010419.782.53$263
Sep 2001017624.262.25$396
Aug 2001021724.873.05$663
Jul 2001022223.933.20$710
Jun 2001012324.563.82$470
May 2001016925.524.31$728
Apr 2001010924.685.34$582
Mar 2001028024.545.38$1,505
Feb 2001018927.755.77$1,090
Jan 2001011827.478.40$991
Dec 2000018226.889.12$1,660
Nov 200009032.215.66$509
Oct 2000013631.235.15$700
Sep 2000015131.875.19$783
Aug 2000015429.644.54$699
Jul 2000016028.534.09$654
Jun 2000015229.304.40$668
May 2000014427.263.68$530
Apr 2000015224.513.12$474
Mar 2000021628.422.86$618
Feb 2000021027.622.73$573
Jan 2000012725.272.48$315
Dec 1999015824.282.42$383
Nov 1999013723.192.43$333
Oct 1999012920.982.80$362
Sep 1999015221.752.62$398
Aug 1999014919.262.88$428
Jul 1999015217.892.37$361
Jun 1999020315.942.36$480
May 1999016115.792.32$374
Apr 1999022115.102.21$488
Mar 1999011312.471.84$208
Feb 199901589.981.82$287
Jan 1999024810.381.90$471
Dec 199801909.201.77$337
Nov 1998013910.892.19$304
Oct 1998012712.421.97$250
Sep 1998022512.592.08$469
Aug 1998022511.301.91$429
Jul 1998019111.742.24$427
Jun 1998013111.242.24$293
May 1998010312.622.21$227
Apr 1998012513.042.51$313
Mar 19980012.802.31$0
Feb 1998011313.952.30$260
Jan 1998013614.702.15$293
Dec 1997014316.322.41$345
Nov 1997012818.193.09$395
Oct 1997013619.253.15$428
Sep 1997010217.742.95$301
Aug 19970017.862.55$0
Jul 1997022717.582.25$510
Jun 1997025317.242.26$571
May 1997022818.972.31$526
Apr 1997017317.882.08$360
Mar 1997021318.951.94$413
Feb 1997021020.492.21$463
Jan 1997026823.483.54$949
Dec 1996021523.32$0
Nov 1996013821.97$0
Oct 1996021623.31$0
Sep 1996021522.22$0
Aug 1996013120.26$0
Jul 1996020419.55$0
Jun 1996029418.73$0
May 1996023619.43$0
Apr 1996011421.51$0
Mar 1996021519.38$0
Feb 1996016716.98$0
Jan 1996016917.07$0
Dec 1995022017.19$0
Nov 1995012516.00$0
Oct 1995016215.43$0
Sep 1995010316.18$0
Aug 1995029315.92$0
Jul 1995029315.24$0
Jun 1995024916.41$0
May 1995016417.56$0
Apr 1995017017.73$0
Mar 1995020916.44$0
Feb 1995019916.58$0
Jan 1995020015.92$0
Dec 1994023515.03$0
Nov 1994020215.90$0
Oct 1994020915.58$0
Sep 1994018215.29$0
Aug 1994023916.13$0
Jul 1994052917.56$0
Jun 1994041917.09$0
May 1994055515.88$0
Apr 1994048014.14$0
Mar 1994059712.46$0
Feb 1994036612.50$0
Jan 1994018512.66$0
Dec 1993020712.33$0
Nov 1993022014.49$0
Oct 1993021515.85$0
Sep 1993022915.03$0
Aug 1993033915.66$0
Jul 1993026315.46$0
Jun 1993023516.79$0
May 1993029417.68$0
Apr 1993026618.05$0
Mar 1993037818.14$0
Feb 1993015117.90$0
Jan 1993027516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 47.93 =         $0
Gas                  113 Mcf  × $  3.21 =       $363

────────────────────────────────────────────────────
Month total                                     $363

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/76208 is the state's own key, not one this site invented.