Operated by THOMAS OIL AND GAS INC. (P-5 852145) in the ADAMS-BAGGETT RANCH (CANYON SD.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 77445District 7CField 00636500GasSaveExport
Value, all time
$70 k
Jan 1993 – Dec 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
192
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 615 leases and 615 wells, and the rule below applies to all of them.

Discovered
1969-02-01
as the register files it
Field class
Gas
the register's own label
Between wells
330 ft
minimum
From a lease line
165 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 2007-10-09.

The Commission's schedule remark for this field reads: THE ALLOCATION FORMULA.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction16,307 Mcf$70,312
Total$70,312

616 Mcf of this lease's gas, across 26 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4581, -101.0270. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.45807, -101.02704 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,350 ft
1 wells filed one
Completion to plug
30.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,350 ft.

Completions filed
Feb 1978
1 of 1 wells
Plug dates filed
Dec 2008
1 of 1 wells

Last completion to plug: a median of 30.8 years across the 1 well that filed both dates, with the middle half between 30.8 years and 30.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-105318481J5,350 ftFeb 1978Dec 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (192)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

192 months

Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 200623560.085.04$1,184
Aug 20061,15868.717.34$8,500
Jul 20063169.376.34$197
Jun 20068766.286.38$555
May 20064766.016.42$302
Apr 2006064.397.36$0
Mar 2006556.707.08$35
Feb 20064657.597.75$357
Jan 2006460.598.93$36
Dec 2005454.9413.42$54
Nov 2005054.6910.59$0
Oct 20051458.3413.80$193
Sep 20053861.4512.08$459
Aug 20053861.519.80$372
Jul 20052955.697.84$227
Jun 2005452.337.38$30
May 20054645.226.65$306
Apr 20052349.207.36$169
Mar 20052250.377.15$157
Feb 20053645.226.31$227
Jan 20053843.166.32$240
Dec 20048339.866.75$560
Nov 200423045.286.33$1,456
Oct 200452049.706.52$3,388
Sep 200439043.245.28$2,061
Aug 200413142.375.55$727
Jul 200411138.286.08$675
Jun 20047136.106.43$457
May 200480037.486.49$5,196
Apr 200436834.475.86$2,156
Mar 200414434.365.53$796
Feb 20041,51532.455.51$8,347
Jan 200430032.036.30$1,890
Dec 200369130.266.30$4,354
Nov 20032828.804.60$129
Oct 20037528.174.76$357
Sep 200333126.314.75$1,572
Aug 200320629.765.13$1,057
Jul 2003029.415.17$0
Jun 2003128.565.98$6
May 2003026.595.97$0
Apr 200351226.675.41$2,769
Mar 200313631.146.10$829
Feb 2003033.487.93$0
Jan 2003030.315.58$0
Dec 2002026.914.85$0
Nov 2002024.664.14$0
Oct 2002026.464.23$0
Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 200226724.583.06$817
Jun 200240123.733.34$1,339
May 200222324.663.58$799
Apr 2002223.653.51$7
Mar 2002222.003.10$6
Feb 200221418.222.38$508
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001718.072.41$17
Oct 200140619.782.53$1,027
Sep 200137324.262.25$840
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 2001027.478.40$0
Dec 2000026.889.12$0
Nov 2000032.215.66$0
Oct 2000031.235.15$0
Sep 2000031.875.19$0
Aug 2000029.644.54$0
Jul 2000028.534.09$0
Jun 2000029.304.40$0
May 2000027.263.68$0
Apr 2000324.513.12$9
Mar 20005928.422.86$169
Feb 2000027.622.73$0
Jan 2000025.272.48$0
Dec 199912724.282.42$308
Nov 1999023.192.43$0
Oct 1999220.982.80$6
Sep 19992321.752.62$60
Aug 1999019.262.88$0
Jul 1999717.892.37$17
Jun 199912715.942.36$300
May 199911215.792.32$260
Apr 19993915.102.21$86
Mar 1999012.471.84$0
Feb 19991019.981.82$184
Jan 19999610.381.90$182
Dec 1998759.201.77$133
Nov 19988610.892.19$188
Oct 199811412.421.97$224
Sep 199810212.592.08$212
Aug 199810911.301.91$208
Jul 199811911.742.24$266
Jun 199811511.242.24$257
May 199810312.622.21$227
Apr 199810113.042.51$253
Mar 19989012.802.31$208
Feb 199812313.952.30$283
Jan 199880914.702.15$1,743
Dec 19971,02916.322.41$2,481
Nov 199737018.193.09$1,143
Oct 199733119.253.15$1,043
Sep 199714117.742.95$417
Aug 199711217.862.55$286
Jul 19979317.582.25$209
Jun 199730717.242.26$693
May 199722318.972.31$515
Apr 1997017.882.08$0
Mar 1997018.951.94$0
Feb 1997020.492.21$0
Jan 1997023.483.54$0
Dec 1996023.32$0
Nov 1996021.97$0
Oct 1996023.31$0
Sep 1996022.22$0
Aug 19963020.26$0
Jul 1996019.55$0
Jun 1996018.73$0
May 19961719.43$0
Apr 1996021.51$0
Mar 19961419.38$0
Feb 1996816.98$0
Jan 1996017.07$0
Dec 1995017.19$0
Nov 19952816.00$0
Oct 19951215.43$0
Sep 1995016.18$0
Aug 1995815.92$0
Jul 19951515.24$0
Jun 19951016.41$0
May 19951217.56$0
Apr 19951917.73$0
Mar 19951416.44$0
Feb 19951116.58$0
Jan 1995015.92$0
Dec 1994315.03$0
Nov 1994415.90$0
Oct 19942115.58$0
Sep 199411315.29$0
Aug 19945016.13$0
Jul 19941617.56$0
Jun 1994017.09$0
May 1994015.88$0
Apr 1994014.14$0
Mar 1994012.46$0
Feb 1994012.50$0
Jan 19941212.66$0
Dec 1993012.33$0
Nov 1993014.49$0
Oct 1993015.85$0
Sep 19939815.03$0
Aug 1993015.66$0
Jul 1993015.46$0
Jun 1993016.79$0
May 1993117.68$0
Apr 19931018.05$0
Mar 19932218.14$0
Feb 19932117.90$0
Jan 19934716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2006 — as filed, then multipliedworked
Gas                  235 Mcf  × $  5.04 =     $1,184

────────────────────────────────────────────────────
Month total                                   $1,184

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/77445 is the state's own key, not one this site invented.