HOOVER 44

Operated by EXTEX OPERATING COMPANY (P-5 257062) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 80025District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$605 k
Jan 1993 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition561 bbl$9,431
GasProduction183,272 Mcf$595,134
Total$604,565

40,114 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4697, -101.5187. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46966, -101.51874 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,450 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,450 ft.

Completions filed
Nov 1978
1 of 1 wells

1 well

42-1053205237,450 ftNov 1978

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 202602989.753.15$91
Feb 2026040263.503.75$1,508
Jan 2026048059.138.00$3,839
Dec 2025074756.664.41$3,297
Nov 2025010258.593.93$401
Oct 202501859.383.30$59
Sep 2025069262.743.08$2,129
Aug 2025012563.933.01$377
Jul 2025017066.743.32$564
Jun 2025012566.483.13$391
May 2025021960.553.23$708
Apr 2025024562.363.54$868
Mar 2025021167.704.27$901
Feb 2025023770.884.34$1,029
Jan 2025020774.324.28$886
Dec 2024016168.993.12$503
Nov 2024029769.052.20$653
Oct 20240071.372.28$0
Sep 2024033369.612.36$787
Aug 2024036275.632.06$747
Jul 202406079.932.15$129
Jun 202405178.082.63$134
May 202404878.812.20$106
Apr 202407784.451.66$128
Mar 2024023780.301.55$366
Feb 2024019876.091.78$353
Jan 2024022173.023.30$729
Dec 2023020971.262.61$546
Nov 2023024977.892.81$699
Oct 2023020985.443.09$645
Sep 2023020989.042.74$572
Aug 2023021180.522.67$564
Jul 2023020474.852.64$539
Jun 2023019668.962.26$443
May 2023030170.622.23$670
Apr 2023029378.122.24$656
Mar 2023031972.852.39$763
Feb 2023032075.112.47$789
Jan 2023034576.533.39$1,169
Dec 2022013676.415.73$779
Nov 2022020985.005.65$1,180
Oct 2022018787.185.86$1,097
Sep 2022020384.888.16$1,657
Aug 2022022194.529.13$2,017
Jul 20220210101.587.54$1,584
Jun 20220227115.097.98$1,811
May 20220245109.378.43$2,066
Apr 20220238104.226.84$1,627
Mar 20220281108.885.08$1,426
Feb 2022025291.054.86$1,224
Jan 2022025281.844.54$1,144
Dec 2021020271.323.90$788
Nov 20210577.435.24$26
Oct 2021010679.795.71$606
Sep 20210069.865.35$0
Aug 202105266.024.22$219
Jul 2021023070.783.98$916
Jun 2021031269.493.38$1,055
May 2021024863.483.02$748
Apr 2021029560.362.76$814
Mar 2021020161.302.72$546
Feb 2021013157.805.55$727
Jan 2021028250.412.81$793
Dec 2020023744.642.68$634
Nov 2020023038.772.71$623
Oct 20200036.972.48$0
Sep 2020075937.091.99$1,511
Aug 2020031339.982.39$747
Jul 2020012938.371.83$235
Jun 2020029634.901.69$500
May 2020034616.921.81$628
Apr 2020035214.751.80$635
Mar 2020038330.341.86$711
Feb 2020038549.881.98$763
Jan 2020040757.252.09$853
Dec 2019041259.012.30$949
Nov 2019037555.302.75$1,032
Oct 2019036453.472.42$880
Sep 2019039755.052.66$1,055
Aug 2019039553.112.30$910
Jul 2019040056.272.46$984
Jun 2019038352.782.49$954
May 2019041358.482.74$1,132
Apr 2019040062.632.75$1,100
Mar 2019043056.803.06$1,317
Feb 2019041350.852.79$1,153
Jan 2019038446.033.23$1,240
Dec 2018035446.594.19$1,482
Nov 2018032252.934.24$1,364
Oct 2018034961.443.40$1,186
Sep 2018038459.543.11$1,193
Aug 2018029559.403.07$905
Jul 2018037765.142.93$1,105
Jun 2018036560.183.08$1,123
May 2018036665.382.90$1,062
Apr 2018035463.842.90$1,027
Mar 2018037061.222.79$1,031
Feb 2018033761.782.77$932
Jan 2018037462.874.01$1,499
Dec 2017037257.272.92$1,087
Nov 2017037655.423.12$1,173
Oct 2017053349.292.98$1,590
Sep 201709747.523.09$299
Aug 2017037845.373.00$1,136
Jul 2017037943.873.09$1,170
Jun 2017033942.493.09$1,047
May 2017035545.373.26$1,159
Apr 2017034647.933.21$1,111
Mar 2017036546.772.98$1,089
Feb 2017033150.452.95$977
Jan 2017027249.413.42$930
Dec 2016033148.763.72$1,232
Nov 2016029842.492.64$788
Oct 2016034146.193.09$1,054
Sep 2016034241.553.10$1,060
Aug 2016034041.442.92$994
Jul 2016034741.622.92$1,015
Jun 2016032345.352.69$868
May 2016035542.521.99$707
Apr 2016033036.561.99$657
Mar 2016036733.011.79$658
Feb 2016034826.472.06$718
Jan 2016037727.352.36$891
Dec 2015037632.362.00$753
Nov 2015037238.792.17$806
Oct 2015037643.552.43$912
Sep 2015038042.992.76$1,048
Aug 2015034940.162.87$1,003
Jul 2015039148.152.95$1,152
Jun 2015036456.152.88$1,049
May 2015037755.212.96$1,114
Apr 2015039149.822.71$1,058
Mar 2015037442.892.93$1,098
Feb 2015034944.662.98$1,039
Jan 2015040543.433.10$1,256
Dec 2014041454.693.59$1,487
Nov 2014037570.464.25$1,594
Oct 2014034078.303.90$1,326
Sep 2014032586.164.05$1,315
Aug 2014032589.394.04$1,311
Jul 2014032296.564.18$1,346
Jun 2014039098.164.74$1,847
May 2014038394.734.73$1,810
Apr 2014037795.944.81$1,813
Mar 2014036995.895.06$1,866
Feb 2014033797.406.19$2,087
Jan 2014034090.404.86$1,653
Dec 2013034791.824.35$1,511
Nov 2013033188.853.74$1,237
Oct 2013029197.423.78$1,100
Sep 20130374104.113.72$1,390
Aug 20130370104.253.52$1,303
Jul 20130383102.523.72$1,424
Jun 2013038494.403.93$1,510
May 2013034694.834.15$1,436
Apr 2013037393.964.28$1,597
Mar 2013035993.623.91$1,405
Feb 2013034291.233.42$1,170
Jan 2013037891.603.42$1,293
Dec 2012033686.773.42$1,149
Nov 2012033186.953.62$1,200
Oct 2012036389.383.40$1,234
Sep 2012033194.672.92$966
Aug 2012037892.662.91$1,099
Jul 2012038385.133.02$1,157
Jun 2012034579.822.52$869
May 2012040991.612.49$1,018
Apr 20120395101.652.00$789
Mar 20120396105.052.22$880
Feb 20120344101.102.57$884
Jan 2012037698.092.73$1,028
Dec 2011033696.873.24$1,089
Nov 2011034595.723.31$1,142
Oct 2011040884.983.65$1,489
Sep 2011039683.623.99$1,578
Aug 2011043483.404.15$1,801
Jul 2011035594.144.52$1,604
Jun 2011039692.904.64$1,837
May 2011041098.134.40$1,806
Apr 20110380105.964.33$1,647
Mar 2011040696.364.06$1,647
Feb 2011035185.644.18$1,467
Jan 2011040386.504.59$1,849
Dec 2010040085.734.35$1,739
Nov 2010039080.843.80$1,480
Oct 2010041078.103.51$1,439
Sep 2010040272.633.98$1,600
Aug 2010041373.684.42$1,825
Jul 2010041872.554.74$1,980
Jun 2010039470.364.91$1,935
May 2010042471.124.24$1,796
Apr 2010038681.694.12$1,591
Mar 2010042078.394.39$1,843
Feb 2010037973.585.44$2,063
Jan 2010042074.365.96$2,505
Dec 2009041271.445.48$2,259
Nov 2009042074.593.75$1,576
Oct 2009043472.544.11$1,784
Sep 2009042365.543.06$1,296
Aug 2009044767.423.22$1,439
Jul 2009043561.133.46$1,507
Jun 2009042766.163.90$1,663
May 2009044354.743.93$1,739
Apr 2009043246.773.59$1,550
Mar 2009044342.144.06$1,798
Feb 2009039532.814.63$1,830
Jan 2009045235.865.37$2,428
Dec 2008044037.105.98$2,630
Nov 2008044155.496.86$3,025
Oct 2008045175.246.92$3,122
Sep 20080375101.767.88$2,954
Aug 20080454114.228.48$3,851
Jul 20080453131.0811.39$5,159
Jun 20080436131.3313.03$5,682
May 20080465123.1711.57$5,382
Apr 20080465110.3110.45$4,862
Mar 20080483101.909.66$4,668
Feb 2008038192.538.77$3,342
Jan 2008044890.388.21$3,676
Dec 2007048888.337.30$3,563
Nov 2007045691.677.29$3,325
Oct 2007047482.856.92$3,281
Sep 2007044175.846.24$2,754
Aug 2007041069.066.39$2,619
Jul 2007044070.906.39$2,811
Jun 2007032062.007.55$2,416
May 2007040158.747.85$3,146
Apr 2007034559.617.81$2,693
Mar 2007036056.927.30$2,629
Feb 2007034755.108.22$2,851
Jan 2007033150.306.73$2,227
Dec 2006040956.656.92$2,830
Nov 2006035654.207.62$2,712
Oct 2006045154.906.01$2,712
Sep 2006042360.085.04$2,131
Aug 2006048468.717.34$3,553
Jul 2006045069.376.34$2,854
Jun 2006048066.286.38$3,064
May 2006045466.016.42$2,917
Apr 2006047264.397.36$3,474
Mar 2006045156.707.08$3,194
Feb 2006030557.597.75$2,364
Jan 2006048660.598.93$4,342
Dec 2005046754.9413.42$6,265
Nov 2005039854.6910.59$4,214
Oct 2005038458.3413.80$5,298
Sep 2005040861.4512.08$4,928
Aug 2005041861.519.80$4,095
Jul 2005044455.697.84$3,483
Jun 2005043452.337.38$3,203
May 2005042945.226.65$2,853
Apr 2005035449.207.36$2,606
Mar 2005045950.377.15$3,284
Feb 2005039045.226.31$2,462
Jan 2005049243.166.32$3,111
Dec 2004046239.866.75$3,119
Nov 2004045945.286.33$2,906
Oct 2004038349.706.52$2,495
Sep 2004043443.245.28$2,293
Aug 2004043842.375.55$2,431
Jul 2004038538.286.08$2,342
Jun 2004044036.106.43$2,831
May 2004043837.486.49$2,845
Apr 2004042834.475.86$2,507
Mar 2004041134.365.53$2,273
Feb 2004040432.455.51$2,226
Jan 2004042032.036.30$2,646
Dec 2003041630.266.30$2,621
Nov 2003040728.804.60$1,870
Oct 2003042328.174.76$2,013
Sep 2003041626.314.75$1,976
Aug 2003041929.765.13$2,149
Jul 2003037529.415.17$1,939
Jun 2003042628.565.98$2,549
May 2003043026.595.97$2,568
Apr 2003038226.675.41$2,066
Mar 2003039931.146.10$2,432
Feb 2003037433.487.93$2,964
Jan 2003042530.315.58$2,372
Dec 2002044626.914.85$2,165
Nov 2002047624.664.14$1,969
Oct 2002044526.464.23$1,882
Sep 2002049127.443.64$1,785
Aug 2002041625.963.16$1,316
Jul 2002041224.583.06$1,261
Jun 2002036223.733.34$1,208
May 2002037524.663.58$1,344
Apr 2002038923.653.51$1,366
Mar 2002041722.003.10$1,294
Feb 2002038918.222.38$924
Jan 2002049017.172.38$1,164
Dec 2001050916.932.36$1,203
Nov 2001045118.072.41$1,085
Oct 2001045719.782.53$1,156
Sep 2001047124.262.25$1,060
Aug 2001056324.873.05$1,719
Jul 2001047123.933.20$1,506
Jun 2001051424.563.82$1,966
May 2001046925.524.31$2,020
Apr 2001042924.685.34$2,289
Mar 2001052624.545.38$2,828
Feb 2001044327.755.77$2,555
Jan 2001060627.478.40$5,090
Dec 2000038726.889.12$3,530
Nov 2000053732.215.66$3,038
Oct 2000057031.235.15$2,933
Sep 2000060931.875.19$3,159
Aug 2000058929.644.54$2,675
Jul 2000058928.534.09$2,409
Jun 2000053729.304.40$2,361
May 2000051627.263.68$1,899
Apr 2000051024.513.12$1,589
Mar 2000059628.422.86$1,704
Feb 2000058627.622.73$1,598
Jan 2000049425.272.48$1,225
Dec 1999082224.282.42$1,992
Nov 1999054523.192.43$1,327
Oct 1999065420.982.80$1,834
Sep 1999070221.752.62$1,838
Aug 1999061019.262.88$1,754
Jul 1999056317.892.37$1,336
Jun 1999053015.942.36$1,252
May 1999060115.792.32$1,395
Apr 1999066215.102.21$1,462
Mar 1999062912.471.84$1,156
Feb 199906019.981.82$1,092
Jan 1999051110.381.90$971
Dec 199805969.201.77$1,057
Nov 1998062310.892.19$1,362
Oct 1998070912.421.97$1,396
Sep 1998068912.592.08$1,435
Aug 1998076711.301.91$1,463
Jul 1998077811.742.24$1,741
Jun 1998049511.242.24$1,107
May 19981895012.622.21$2,323
Apr 19981694613.042.51$2,579
Mar 19981880712.802.31$2,094
Feb 1998321,33913.952.30$3,525
Jan 199815414.702.15$131
Dec 1997210516.322.41$286
Nov 1997241,12518.193.09$3,911
Oct 1997261,27319.253.15$4,510
Sep 1997797517.742.95$3,005
Aug 199751,01717.862.55$2,687
Jul 1997893217.582.25$2,235
Jun 199781,08817.242.26$2,594
May 199781,30418.972.31$3,162
Apr 199791,13417.882.08$2,523
Mar 199771,14618.951.94$2,355
Feb 1997692820.492.21$2,170
Jan 1997997323.483.54$3,655
Dec 1996899223.32$187
Nov 19961296121.97$264
Oct 1996968723.31$210
Sep 1996447022.22$89
Aug 1996686220.26$122
Jul 1996485119.55$78
Jun 199681,06918.73$150
May 1996101,11919.43$194
Apr 1996101,09221.51$215
Mar 199691,04419.38$174
Feb 19961095916.98$170
Jan 1996898317.07$137
Dec 1995881117.19$138
Nov 19952097716.00$320
Oct 199591,07415.43$139
Sep 1995101,12716.18$162
Aug 1995897715.92$127
Jul 1995095215.24$0
Jun 1995599716.41$82
May 1995019917.56$0
Apr 1995785417.73$124
Mar 199591,03116.44$148
Feb 1995894916.58$133
Jan 19951493815.92$223
Dec 1994980115.03$135
Nov 1994892615.90$127
Oct 199491,10515.58$140
Sep 1994674615.29$92
Aug 199471,07216.13$113
Jul 1994083517.56$0
Jun 1994680617.09$103
May 1994790315.88$111
Apr 1994896014.14$113
Mar 19941278612.46$150
Feb 1994554612.50$63
Jan 19941065512.66$127
Dec 1993462312.33$49
Nov 1993960514.49$130
Oct 1993799015.85$111
Sep 1993668415.03$90
Aug 1993576915.66$78
Jul 1993577815.46$77
Jun 1993459416.79$67
May 1993458417.68$71
Apr 1993451918.05$72
Mar 1993967118.14$163
Feb 1993855217.90$143
Jan 1993962916.93$152

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 89.75 =         $0
Gas                   29 Mcf  × $  3.15 =        $91

────────────────────────────────────────────────────
Month total                                      $91

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/80025 is the state's own key, not one this site invented.