CARSON-MILLSPAUGH "A"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 82803District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$497 k
Jan 1993 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition29 bbl$1,862
GasProduction137,133 Mcf$494,901
Total$496,763

20,009 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4672, -101.4900. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46717, -101.49003 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,550 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,550 ft.

Completions filed
Dec 1979
1 of 1 wells

1 well

42-1053217330467,550 ftDec 1979

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260306106.413.05$932
Apr 2026139498.932.87$1,230
Mar 20260089.753.15$0
Feb 2026224863.503.75$1,057
Jan 2026227659.138.00$2,326
Dec 2025327156.664.41$1,366
Nov 2025327958.593.93$1,271
Oct 2025125459.383.30$899
Sep 2025129962.743.08$983
Aug 2025219363.933.01$710
Jul 2025224666.743.32$949
Jun 2025124866.483.13$842
May 2025324860.553.23$983
Apr 2025215362.363.54$667
Mar 2025324267.704.27$1,236
Feb 2025323270.884.34$1,220
Jan 20250074.324.28$0
Dec 2024026868.993.12$837
Nov 2024027469.052.20$602
Oct 2024028471.372.28$648
Sep 2024027069.612.36$638
Aug 2024029475.632.06$607
Jul 2024029379.932.15$629
Jun 2024028478.082.63$748
May 2024029478.812.20$646
Apr 2024029384.451.66$486
Mar 2024030080.301.55$464
Feb 2024032176.091.78$573
Jan 2024021473.023.30$706
Dec 2023024871.262.61$647
Nov 2023025077.892.81$702
Oct 2023028785.443.09$886
Sep 2023029689.042.74$810
Aug 2023020080.522.67$535
Jul 2023033874.852.64$893
Jun 2023034868.962.26$786
May 202309970.622.23$221
Apr 2023014578.122.24$324
Mar 2023025872.852.39$617
Feb 2023026075.112.47$641
Jan 2023030276.533.39$1,023
Dec 2022029476.415.73$1,684
Nov 2022028685.005.65$1,615
Oct 2022039787.185.86$2,328
Sep 2022054484.888.16$4,441
Aug 2022064694.529.13$5,896
Jul 2022016101.587.54$121
Jun 2022035115.097.98$279
May 2022012109.378.43$101
Apr 2022033104.226.84$226
Mar 2022038108.885.08$193
Feb 202203691.054.86$175
Jan 202203881.844.54$172
Dec 202103571.323.90$136
Nov 202101877.435.24$94
Oct 202102879.795.71$160
Sep 202106769.865.35$359
Aug 2021019966.024.22$840
Jul 2021025570.783.98$1,015
Jun 2021030769.493.38$1,038
May 2021025263.483.02$760
Apr 2021084460.362.76$2,328
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 2020022244.642.68$594
Nov 2020023938.772.71$647
Oct 2020025436.972.48$630
Sep 2020021737.091.99$432
Aug 2020023939.982.39$570
Jul 2020024238.371.83$442
Jun 2020024234.901.69$409
May 2020025516.921.81$463
Apr 2020028414.751.80$512
Mar 2020028830.341.86$535
Feb 2020027949.881.98$553
Jan 2020030157.252.09$631
Dec 2019029759.012.30$684
Nov 2019028655.302.75$787
Oct 2019029753.472.42$718
Sep 2019028455.052.66$755
Aug 2019029153.112.30$671
Jul 2019030556.272.46$750
Jun 2019028852.782.49$717
May 2019030658.482.74$839
Apr 2019029662.632.75$814
Mar 2019030156.803.06$922
Feb 2019027350.852.79$762
Jan 2019030346.033.23$978
Dec 2018029546.594.19$1,235
Nov 2018028252.934.24$1,195
Oct 2018030461.443.40$1,033
Sep 2018031659.543.11$982
Aug 2018027359.403.07$837
Jul 2018030465.142.93$891
Jun 2018029760.183.08$914
May 2018030865.382.90$893
Apr 2018029763.842.90$862
Mar 2018031961.222.79$889
Feb 2018028461.782.77$786
Jan 2018031662.874.01$1,267
Dec 2017032357.272.92$944
Nov 2017033455.423.12$1,042
Oct 2017033849.292.98$1,008
Sep 2017037247.523.09$1,148
Aug 2017042345.373.00$1,271
Jul 2017036543.873.09$1,127
Jun 2017028842.493.09$889
May 2017022245.373.26$724
Apr 2017015247.933.21$488
Mar 2017043146.772.98$1,286
Feb 2017014250.452.95$419
Jan 2017026549.413.42$906
Dec 2016024248.763.72$901
Nov 201607042.492.64$185
Oct 2016017946.193.09$553
Sep 2016025541.553.10$791
Aug 2016031941.442.92$933
Jul 2016021941.622.92$640
Jun 2016025145.352.69$674
May 2016023942.521.99$476
Apr 2016024836.561.99$494
Mar 2016030033.011.79$538
Feb 2016023626.472.06$487
Jan 2016026627.352.36$629
Dec 2015025732.362.00$514
Nov 2015024938.792.17$540
Oct 2015030443.552.43$738
Sep 2015022442.992.76$618
Aug 2015029540.162.87$847
Jul 2015036348.152.95$1,069
Jun 2015021156.152.88$608
May 2015032355.212.96$955
Apr 2015030649.822.71$828
Mar 2015032542.892.93$954
Feb 2015021544.662.98$640
Jan 2015034843.433.10$1,079
Dec 2014026854.693.59$962
Nov 2014027370.464.25$1,161
Oct 2014030978.303.90$1,205
Sep 2014031886.164.05$1,286
Aug 2014024789.394.04$997
Jul 2014029096.564.18$1,212
Jun 2014025498.164.74$1,203
May 2014028094.734.73$1,323
Apr 2014030595.944.81$1,467
Mar 2014027995.895.06$1,411
Feb 2014028297.406.19$1,746
Jan 2014031890.404.86$1,546
Dec 2013038091.824.35$1,655
Nov 2013030288.853.74$1,129
Oct 2013031797.423.78$1,198
Sep 20130332104.113.72$1,234
Aug 20130337104.253.52$1,187
Jul 20130348102.523.72$1,294
Jun 2013034394.403.93$1,349
May 2013027694.834.15$1,145
Apr 2013032293.964.28$1,379
Mar 2013027493.623.91$1,072
Feb 2013035291.233.42$1,204
Jan 2013040791.603.42$1,392
Dec 2012032886.773.42$1,122
Nov 2012031186.953.62$1,127
Oct 2012032389.383.40$1,098
Sep 2012031294.672.92$911
Aug 2012031592.662.91$916
Jul 2012032485.133.02$979
Jun 2012031379.822.52$788
May 2012033991.612.49$844
Apr 20120318101.652.00$635
Mar 20120328105.052.22$729
Feb 20120306101.102.57$786
Jan 2012032698.092.73$891
Dec 2011032196.873.24$1,040
Nov 2011032195.723.31$1,063
Oct 2011031984.983.65$1,164
Sep 2011030583.623.99$1,216
Aug 2011031783.404.15$1,315
Jul 2011032394.144.52$1,459
Jun 2011031392.904.64$1,452
May 2011033298.134.40$1,462
Apr 20110310105.964.33$1,343
Mar 2011032096.364.06$1,298
Feb 2011024685.644.18$1,028
Jan 2011023786.504.59$1,088
Dec 2010032485.734.35$1,409
Nov 2010041080.843.80$1,556
Oct 2010023978.103.51$839
Sep 2010027172.633.98$1,078
Aug 2010029973.684.42$1,321
Jul 2010028672.554.74$1,355
Jun 2010033770.364.91$1,655
May 2010035571.124.24$1,504
Apr 2010032581.694.12$1,340
Mar 2010034778.394.39$1,523
Feb 2010032573.585.44$1,769
Jan 2010036074.365.96$2,147
Dec 2009035671.445.48$1,952
Nov 2009035174.593.75$1,317
Oct 2009035972.544.11$1,476
Sep 2009035365.543.06$1,082
Aug 2009033267.423.22$1,069
Jul 2009035361.133.46$1,223
Jun 2009034466.163.90$1,340
May 2009036454.743.93$1,429
Apr 2009041246.773.59$1,478
Mar 2009025542.144.06$1,035
Feb 2009029332.814.63$1,357
Jan 2009032835.865.37$1,762
Dec 2008032237.105.98$1,925
Nov 2008033855.496.86$2,319
Oct 2008037175.246.92$2,568
Sep 20080289101.767.88$2,276
Aug 20080353114.228.48$2,995
Jul 20080338131.0811.39$3,850
Jun 20080350131.3313.03$4,561
May 20080544123.1711.57$6,296
Apr 20080399110.3110.45$4,171
Mar 20080366101.909.66$3,537
Feb 2008035092.538.77$3,070
Jan 2008059190.388.21$4,850
Dec 2007011588.337.30$840
Nov 2007015291.677.29$1,108
Oct 2007019982.856.92$1,377
Sep 2007034875.846.24$2,173
Aug 2007036069.066.39$2,300
Jul 2007036170.906.39$2,306
Jun 2007035662.007.55$2,687
May 2007035358.747.85$2,770
Apr 2007033159.617.81$2,584
Mar 2007028556.927.30$2,081
Feb 2007032155.108.22$2,637
Jan 2007047950.306.73$3,222
Dec 2006047356.656.92$3,272
Nov 2006037854.207.62$2,879
Oct 2006075854.906.01$4,558
Sep 200601,48260.085.04$7,465
Aug 2006053568.717.34$3,927
Jul 2006085569.376.34$5,423
Jun 200608866.286.38$562
May 200609066.016.42$578
Apr 200608664.397.36$633
Mar 200608056.707.08$567
Feb 2006010857.597.75$837
Jan 200609260.598.93$822
Dec 200508254.9413.42$1,100
Nov 2005022454.6910.59$2,372
Oct 2005039858.3413.80$5,491
Sep 2005034461.4512.08$4,155
Aug 2005037361.519.80$3,654
Jul 2005039955.697.84$3,130
Jun 2005041652.337.38$3,071
May 2005038745.226.65$2,574
Apr 2005039349.207.36$2,893
Mar 2005039450.377.15$2,819
Feb 2005036645.226.31$2,310
Jan 2005042143.166.32$2,662
Dec 2004040039.866.75$2,700
Nov 2004041945.286.33$2,652
Oct 2004041449.706.52$2,697
Sep 2004038843.245.28$2,050
Aug 2004037442.375.55$2,076
Jul 2004047138.286.08$2,866
Jun 2004037536.106.43$2,412
May 2004043037.486.49$2,793
Apr 2004042234.475.86$2,472
Mar 2004050234.365.53$2,776
Feb 2004043432.455.51$2,391
Jan 2004051432.036.30$3,238
Dec 2003048430.266.30$3,050
Nov 2003046228.804.60$2,123
Oct 2003048428.174.76$2,304
Sep 2003063726.314.75$3,025
Aug 200308529.765.13$436
Jul 2003022229.415.17$1,148
Jun 2003026428.565.98$1,580
May 2003031426.595.97$1,875
Apr 2003032726.675.41$1,768
Mar 2003029031.146.10$1,768
Feb 2003024533.487.93$1,942
Jan 2003033330.315.58$1,859
Dec 2002035826.914.85$1,738
Nov 2002034724.664.14$1,436
Oct 2002042226.464.23$1,785
Sep 2002038527.443.64$1,400
Aug 2002049325.963.16$1,560
Jul 200207424.583.06$227
Jun 2002032023.733.34$1,068
May 2002040224.663.58$1,441
Apr 2002039923.653.51$1,401
Mar 2002045722.003.10$1,418
Feb 2002047518.222.38$1,128
Jan 2002057317.172.38$1,361
Dec 2001057716.932.36$1,364
Nov 2001054618.072.41$1,313
Oct 2001055719.782.53$1,409
Sep 2001053424.262.25$1,202
Aug 2001051824.873.05$1,582
Jul 2001059723.933.20$1,909
Jun 2001050524.563.82$1,931
May 2001051925.524.31$2,236
Apr 2001047024.685.34$2,508
Mar 2001052224.545.38$2,807
Feb 2001043127.755.77$2,486
Jan 2001044127.478.40$3,704
Dec 2000043826.889.12$3,996
Nov 2000047332.215.66$2,676
Oct 2000049431.235.15$2,542
Sep 2000054531.875.19$2,827
Aug 2000053929.644.54$2,447
Jul 2000051028.534.09$2,086
Jun 2000052229.304.40$2,295
May 2000063427.263.68$2,333
Apr 2000058424.513.12$1,820
Mar 2000059828.422.86$1,710
Feb 2000062227.622.73$1,696
Jan 2000052125.272.48$1,292
Dec 1999043424.282.42$1,052
Nov 1999045723.192.43$1,112
Oct 1999043420.982.80$1,217
Sep 1999054521.752.62$1,427
Aug 1999053619.262.88$1,541
Jul 1999050717.892.37$1,203
Jun 1999049015.942.36$1,157
May 1999052615.792.32$1,221
Apr 1999048915.102.21$1,080
Mar 1999042112.471.84$774
Feb 199903879.981.82$703
Jan 1999036110.381.90$686
Dec 199804279.201.77$757
Nov 1998040010.892.19$874
Oct 1998040112.421.97$790
Sep 1998037812.592.08$787
Aug 1998041411.301.91$790
Jul 1998041311.742.24$924
Jun 1998046911.242.24$1,049
May 1998047112.622.21$1,039
Apr 1998045413.042.51$1,137
Mar 1998048712.802.31$1,125
Feb 1998045813.952.30$1,053
Jan 1998040814.702.15$879
Dec 1997021716.322.41$523
Nov 1997041818.193.09$1,291
Oct 1997041319.253.15$1,301
Sep 1997039717.742.95$1,173
Aug 1997042717.862.55$1,091
Jul 1997038017.582.25$854
Jun 1997032417.242.26$731
May 1997033018.972.31$762
Apr 1997039117.882.08$814
Mar 1997043518.951.94$844
Feb 1997036220.492.21$799
Jan 1997040823.483.54$1,444
Dec 1996042923.32$0
Nov 1996037121.97$0
Oct 1996041323.31$0
Sep 1996040122.22$0
Aug 1996042820.26$0
Jul 1996045319.55$0
Jun 1996046018.73$0
May 1996045419.43$0
Apr 1996046721.51$0
Mar 1996039119.38$0
Feb 1996037616.98$0
Jan 1996042817.07$0
Dec 1995039317.19$0
Nov 1995034016.00$0
Oct 1995037715.43$0
Sep 1995039616.18$0
Aug 1995036715.92$0
Jul 1995038015.24$0
Jun 1995038016.41$0
May 1995043717.56$0
Apr 1995034617.73$0
Mar 1995044116.44$0
Feb 1995038116.58$0
Jan 1995039015.92$0
Dec 1994050115.03$0
Nov 1994047015.90$0
Oct 1994048515.58$0
Sep 1994049715.29$0
Aug 1994050916.13$0
Jul 1994041817.56$0
Jun 1994041117.09$0
May 1994039215.88$0
Apr 1994036614.14$0
Mar 1994046112.46$0
Feb 1994040112.50$0
Jan 1994046112.66$0
Dec 1993038812.33$0
Nov 1993057714.49$0
Oct 1993032915.85$0
Sep 199308415.03$0
Aug 1993038115.66$0
Jul 1993051715.46$0
Jun 1993040416.79$0
May 1993034817.68$0
Apr 1993044618.05$0
Mar 1993044918.14$0
Feb 1993049017.90$0
Jan 1993052516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  306 Mcf  × $  3.05 =       $932

────────────────────────────────────────────────────
Month total                                     $932

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/82803 is the state's own key, not one this site invented.