HUDSPETH, LILLIAN M. MEM HOSP B

Operated by UPP OPERATING, LLC (P-5 875310) in the WHITEHEAD (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 84474District 7CField 96929600NGPA filingCondensateGasSaveExport
Value, all time
$475 k
Jan 1993 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 210 leases and 210 wells, and the rule below applies to all of them.

Discovered
1975-12-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1987-12-14.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED 4/1/95 PER COMPLETED AOF SURVEY

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA3none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4 bbl$60
GasProduction121,445 Mcf$474,831
Total$474,892

18,436 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5688, -101.0043. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.56882, -101.00426 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,900 ft.

Completions filed
Sep 1979
1 of 1 wells

1 well

42-1053185418,900 ftSep 1979

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202601106.413.05$3
Apr 202607598.932.87$215
Mar 20260489.753.15$13
Feb 202605863.503.75$218
Jan 202606459.138.00$512
Dec 202507256.664.41$318
Nov 202508358.593.93$326
Oct 2025011659.383.30$383
Sep 202507262.743.08$222
Aug 202506963.933.01$208
Jul 202506366.743.32$209
Jun 202507166.483.13$222
May 202508060.553.23$259
Apr 202507562.363.54$266
Mar 202507467.704.27$316
Feb 202506970.884.34$300
Jan 202507874.324.28$334
Dec 202407968.993.12$247
Nov 202407669.052.20$167
Oct 202409071.372.28$205
Sep 2024012569.612.36$296
Aug 2024010075.632.06$206
Jul 202408579.932.15$182
Jun 202406678.082.63$174
May 202407778.812.20$169
Apr 202407484.451.66$123
Mar 202407580.301.55$116
Feb 202407176.091.78$127
Jan 202407373.023.30$241
Dec 202307771.262.61$201
Nov 202307877.892.81$219
Oct 202308785.443.09$269
Sep 202307989.042.74$216
Aug 202308180.522.67$217
Jul 202307474.852.64$195
Jun 202308868.962.26$199
May 202309070.622.23$200
Apr 202307978.122.24$177
Mar 202307972.852.39$189
Feb 202306875.112.47$168
Jan 202308176.533.39$274
Dec 202207876.415.73$447
Nov 202209285.005.65$519
Oct 202208187.185.86$475
Sep 202209184.888.16$743
Aug 2022010794.529.13$977
Jul 2022088101.587.54$664
Jun 2022093115.097.98$742
May 2022081109.378.43$683
Apr 2022076104.226.84$520
Mar 2022076108.885.08$386
Feb 202207191.054.86$345
Jan 202208181.844.54$368
Dec 202107771.323.90$300
Nov 202108577.435.24$445
Oct 2021010079.795.71$571
Sep 202109369.865.35$498
Aug 2021010566.024.22$443
Jul 2021010070.783.98$398
Jun 202109669.493.38$325
May 202107463.483.02$223
Apr 202108160.362.76$223
Mar 202108261.302.72$223
Feb 202106557.805.55$361
Jan 202107750.412.81$216
Dec 202008044.642.68$214
Nov 202007638.772.71$206
Oct 202004936.972.48$121
Sep 202007237.091.99$143
Aug 202009839.982.39$234
Jul 2020011138.371.83$203
Jun 202008734.901.69$147
May 202008316.921.81$151
Apr 202009214.751.80$166
Mar 202008530.341.86$158
Feb 202007549.881.98$149
Jan 202009657.252.09$201
Dec 2019010659.012.30$244
Nov 201909255.302.75$253
Oct 2019015853.472.42$382
Sep 2019013955.052.66$369
Aug 201902853.112.30$65
Jul 2019010956.272.46$268
Jun 2019016052.782.49$399
May 2019020358.482.74$556
Apr 201907862.632.75$215
Mar 201909856.803.06$300
Feb 201909250.852.79$257
Jan 2019010446.033.23$336
Dec 201809846.594.19$410
Nov 2018010852.934.24$458
Oct 2018011961.443.40$404
Sep 2018011459.543.11$354
Aug 2018012159.403.07$371
Jul 2018013065.142.93$381
Jun 2018013860.183.08$425
May 2018014265.382.90$412
Apr 2018013163.842.90$380
Mar 2018013061.222.79$362
Feb 2018012161.782.77$335
Jan 2018013362.874.01$533
Dec 2017013657.272.92$397
Nov 2017013055.423.12$405
Oct 2017014249.292.98$424
Sep 2017014347.523.09$441
Aug 2017015345.373.00$460
Jul 2017018143.873.09$559
Jun 2017015642.493.09$482
May 2017016245.373.26$529
Apr 2017013847.933.21$443
Mar 2017013546.772.98$403
Feb 2017011950.452.95$351
Jan 2017012849.413.42$438
Dec 2016014548.763.72$540
Nov 2016014942.492.64$394
Oct 2016016246.193.09$501
Sep 2016015741.553.10$487
Aug 2016016641.442.92$485
Jul 2016016341.622.92$477
Jun 2016016845.352.69$451
May 2016017542.521.99$348
Apr 2016016636.561.99$331
Mar 2016016133.011.79$289
Feb 2016014026.472.06$289
Jan 2016015327.352.36$362
Dec 2015017132.362.00$342
Nov 2015020538.792.17$444
Oct 2015015843.552.43$383
Sep 2015016042.992.76$441
Aug 2015016740.162.87$480
Jul 2015018748.152.95$551
Jun 2015017956.152.88$516
May 2015019455.212.96$573
Apr 2015020349.822.71$549
Mar 2015019342.892.93$566
Feb 2015014544.662.98$432
Jan 2015016443.433.10$509
Dec 2014018554.693.59$664
Nov 2014015870.464.25$672
Oct 2014013778.303.90$534
Sep 2014012586.164.05$506
Aug 2014013089.394.04$525
Jul 2014013496.564.18$560
Jun 2014013598.164.74$639
May 2014012394.734.73$581
Apr 2014012495.944.81$596
Mar 2014013195.895.06$662
Feb 2014011897.406.19$731
Jan 2014013190.404.86$637
Dec 2013013691.824.35$592
Nov 2013015888.853.74$591
Oct 2013016897.423.78$635
Sep 20130164104.113.72$610
Aug 20130166104.253.52$585
Jul 20130170102.523.72$632
Jun 2013017394.403.93$680
May 2013018694.834.15$772
Apr 2013018593.964.28$792
Mar 2013018893.623.91$736
Feb 2013017591.233.42$598
Jan 2013019991.603.42$681
Dec 2012019686.773.42$670
Nov 2012019386.953.62$700
Oct 2012021089.383.40$714
Sep 2012020894.672.92$607
Aug 2012023692.662.91$686
Jul 2012025585.133.02$770
Jun 2012027579.822.52$693
May 2012032491.612.49$806
Apr 20120232101.652.00$463
Mar 20120359105.052.22$798
Feb 20120355101.102.57$912
Jan 2012041298.092.73$1,126
Dec 2011038896.873.24$1,257
Nov 2011026795.723.31$884
Oct 2011028484.983.65$1,036
Sep 2011031283.623.99$1,244
Aug 2011026983.404.15$1,116
Jul 2011030794.144.52$1,387
Jun 2011023392.904.64$1,081
May 2011023898.134.40$1,048
Apr 20110244105.964.33$1,057
Mar 2011028096.364.06$1,136
Feb 2011014585.644.18$606
Jan 2011022786.504.59$1,042
Dec 2010029885.734.35$1,296
Nov 2010026080.843.80$987
Oct 2010029578.103.51$1,035
Sep 2010034772.633.98$1,381
Aug 2010029373.684.42$1,295
Jul 2010032772.554.74$1,549
Jun 2010037970.364.91$1,861
May 2010025571.124.24$1,080
Apr 2010024281.694.12$998
Mar 2010019678.394.39$860
Feb 2010019873.585.44$1,078
Jan 2010024974.365.96$1,485
Dec 2009022671.445.48$1,239
Nov 2009023274.593.75$870
Oct 2009023772.544.11$974
Sep 2009019965.543.06$610
Aug 2009022167.423.22$711
Jul 2009021561.133.46$745
Jun 2009021166.163.90$822
May 2009022054.743.93$864
Apr 2009021246.773.59$761
Mar 2009021742.144.06$881
Feb 2009020432.814.63$945
Jan 2009021535.865.37$1,155
Dec 2008022937.105.98$1,369
Nov 2008022855.496.86$1,564
Oct 2008026075.246.92$1,800
Sep 20080238101.767.88$1,875
Aug 20080254114.228.48$2,155
Jul 20080250131.0811.39$2,847
Jun 20080240131.3313.03$3,128
May 20080249123.1711.57$2,882
Apr 20080252110.3110.45$2,635
Mar 20080260101.909.66$2,513
Feb 2008039592.538.77$3,464
Jan 2008018890.388.21$1,543
Dec 2007021188.337.30$1,541
Nov 2007023791.677.29$1,728
Oct 2007041582.856.92$2,873
Sep 2007034475.846.24$2,148
Aug 2007033369.066.39$2,127
Jul 2007024870.906.39$1,584
Jun 2007039762.007.55$2,997
May 2007047758.747.85$3,743
Apr 2007039259.617.81$3,060
Mar 2007022056.927.30$1,606
Feb 2007019955.108.22$1,635
Jan 2007038750.306.73$2,603
Dec 2006041356.656.92$2,857
Nov 2006039954.207.62$3,039
Oct 2006040454.906.01$2,430
Sep 2006039460.085.04$1,985
Aug 2006045268.717.34$3,318
Jul 2006040769.376.34$2,582
Jun 2006041766.286.38$2,662
May 2006042666.016.42$2,737
Apr 2006044464.397.36$3,268
Mar 2006044856.707.08$3,173
Feb 2006044357.597.75$3,434
Jan 2006046660.598.93$4,163
Dec 2005047154.9413.42$6,319
Nov 2005044354.6910.59$4,691
Oct 2005043858.3413.80$6,043
Sep 2005038061.4512.08$4,590
Aug 2005038261.519.80$3,742
Jul 2005047055.697.84$3,687
Jun 2005049152.337.38$3,624
May 2005076145.226.65$5,062
Apr 2005059349.207.36$4,365
Mar 2005048150.377.15$3,442
Feb 2005082645.226.31$5,214
Jan 2005068943.166.32$4,356
Dec 2004083639.866.75$5,644
Nov 2004081845.286.33$5,178
Oct 2004084149.706.52$5,479
Sep 2004079743.245.28$4,211
Aug 2004084842.375.55$4,707
Jul 2004078338.286.08$4,764
Jun 2004079036.106.43$5,082
May 2004080537.486.49$5,228
Apr 2004061634.475.86$3,609
Mar 2004065034.365.53$3,595
Feb 2004064132.455.51$3,532
Jan 2004075532.036.30$4,756
Dec 2003073730.266.30$4,644
Nov 2003071328.804.60$3,276
Oct 2003075928.174.76$3,613
Sep 2003079326.314.75$3,766
Aug 2003087429.765.13$4,483
Jul 200301,00429.415.17$5,192
Jun 200301,01128.565.98$6,049
May 2003094926.595.97$5,668
Apr 2003097126.675.41$5,250
Mar 2003093331.146.10$5,688
Feb 2003082033.487.93$6,499
Jan 2003072930.315.58$4,069
Dec 2002059526.914.85$2,888
Nov 2002077424.664.14$3,202
Oct 2002093626.464.23$3,958
Sep 2002085527.443.64$3,108
Aug 2002086825.963.16$2,746
Jul 2002091324.583.06$2,795
Jun 2002065023.733.34$2,170
May 200201,13024.663.58$4,050
Apr 200201,19223.653.51$4,187
Mar 2002025522.003.10$791
Feb 2002025018.222.38$594
Jan 2002031817.172.38$755
Dec 2001029516.932.36$698
Nov 2001038518.072.41$926
Oct 2001036919.782.53$933
Sep 2001035824.262.25$806
Aug 2001031324.873.05$956
Jul 2001030323.933.20$969
Jun 2001014424.563.82$551
May 2001019725.524.31$849
Apr 2001023824.685.34$1,270
Mar 2001025524.545.38$1,371
Feb 2001018927.755.77$1,090
Jan 2001032527.478.40$2,730
Dec 2000040726.889.12$3,713
Nov 2000036832.215.66$2,082
Oct 2000054531.235.15$2,804
Sep 2000042231.875.19$2,189
Aug 2000032629.644.54$1,480
Jul 2000031928.534.09$1,305
Jun 2000022329.304.40$981
May 2000020027.263.68$736
Apr 2000029824.513.12$929
Mar 2000032928.422.86$941
Feb 2000038127.622.73$1,039
Jan 2000040525.272.48$1,005
Dec 1999029724.282.42$720
Nov 1999036623.192.43$891
Oct 1999029220.982.80$819
Sep 1999030621.752.62$801
Aug 1999054619.262.88$1,570
Jul 1999053017.892.37$1,257
Jun 1999062515.942.36$1,476
May 1999058215.792.32$1,351
Apr 1999459715.102.21$1,379
Mar 1999069912.471.84$1,285
Feb 199907929.981.82$1,440
Jan 1999073910.381.90$1,404
Dec 199805369.201.77$951
Nov 1998083710.892.19$1,829
Oct 1998058712.421.97$1,156
Sep 1998034412.592.08$716
Aug 1998064611.301.91$1,232
Jul 1998067911.742.24$1,519
Jun 1998061311.242.24$1,371
May 1998073112.622.21$1,613
Apr 1998071213.042.51$1,784
Mar 1998070712.802.31$1,633
Feb 1998025213.952.30$579
Jan 1998050014.702.15$1,077
Dec 1997050216.322.41$1,210
Nov 199701,03118.193.09$3,184
Oct 1997051719.253.15$1,628
Sep 1997024317.742.95$718
Aug 1997029717.862.55$759
Jul 1997010717.582.25$240
Jun 1997021917.242.26$494
May 1997035918.972.31$829
Apr 1997027317.882.08$569
Mar 1997025918.951.94$502
Feb 1997029320.492.21$646
Jan 1997031823.483.54$1,126
Dec 1996032223.32$0
Nov 1996036121.97$0
Oct 1996041523.31$0
Sep 1996038622.22$0
Aug 1996037920.26$0
Jul 1996038119.55$0
Jun 1996039818.73$0
May 1996039419.43$0
Apr 1996034721.51$0
Mar 1996043719.38$0
Feb 1996043616.98$0
Jan 1996063617.07$0
Dec 1995043517.19$0
Nov 1995032116.00$0
Oct 1995033715.43$0
Sep 1995039516.18$0
Aug 1995044215.92$0
Jul 1995036115.24$0
Jun 199502016.41$0
May 1995026517.56$0
Apr 1995036117.73$0
Mar 1995034316.44$0
Feb 1995033516.58$0
Jan 1995035615.92$0
Dec 1994039715.03$0
Nov 1994038015.90$0
Oct 1994031215.58$0
Sep 1994034515.29$0
Aug 1994031716.13$0
Jul 1994037217.56$0
Jun 1994031517.09$0
May 1994036115.88$0
Apr 1994039414.14$0
Mar 1994040812.46$0
Feb 1994041612.50$0
Jan 1994047612.66$0
Dec 1993049412.33$0
Nov 1993021214.49$0
Oct 1993039515.85$0
Sep 1993037315.03$0
Aug 1993038515.66$0
Jul 1993044015.46$0
Jun 1993048316.79$0
May 1993042817.68$0
Apr 1993048218.05$0
Mar 1993045918.14$0
Feb 1993040417.90$0
Jan 1993052516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    1 Mcf  × $  3.05 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/84474 is the state's own key, not one this site invented.