CLEGG, ELOISE CARSON ET VIR C-1

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 91935District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$208 k
Jan 1993 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5 bbl$318
GasProduction69,301 Mcf$207,657
Total$207,975

19,177 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4113, -101.4334. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.41134, -101.43337 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,940 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,940 ft.

Completions filed
Nov 1980
1 of 1 wells

1 well

42-1053312720106,940 ftNov 1980

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026058106.413.05$177
Apr 2026012298.932.87$350
Mar 20260089.753.15$0
Feb 202604163.503.75$154
Jan 202604659.138.00$368
Dec 202514556.664.41$255
Nov 202504458.593.93$173
Oct 202504559.383.30$149
Sep 202504262.743.08$129
Aug 202504363.933.01$130
Jul 202504466.743.32$146
Jun 202504566.483.13$141
May 202514560.553.23$206
Apr 202514562.363.54$222
Mar 202514967.704.27$277
Feb 202514170.884.34$249
Jan 20250074.324.28$0
Dec 202404168.993.12$128
Nov 202404369.052.20$95
Oct 202404871.372.28$110
Sep 202404169.612.36$97
Aug 202404075.632.06$83
Jul 202404579.932.15$97
Jun 202404578.082.63$119
May 202404278.812.20$92
Apr 202404784.451.66$78
Mar 202404880.301.55$74
Feb 202404576.091.78$80
Jan 202404973.023.30$162
Dec 202304871.262.61$125
Nov 202304777.892.81$132
Oct 202304685.443.09$142
Sep 202304389.042.74$118
Aug 202301480.522.67$37
Jul 202301574.852.64$40
Jun 202305368.962.26$120
May 202304170.622.23$91
Apr 202305478.122.24$121
Mar 202305572.852.39$132
Feb 202305075.112.47$123
Jan 202305776.533.39$193
Dec 202205676.415.73$321
Nov 202205285.005.65$294
Oct 202205687.185.86$328
Sep 202205184.888.16$416
Aug 202205094.529.13$456
Jul 2022036101.587.54$272
Jun 2022034115.097.98$271
May 2022043109.378.43$363
Apr 2022051104.226.84$349
Mar 2022049108.885.08$249
Feb 202204491.054.86$214
Jan 202204781.844.54$213
Dec 202105171.323.90$199
Nov 202105377.435.24$278
Oct 202105479.795.71$309
Sep 202105669.865.35$300
Aug 202105966.024.22$249
Jul 202105470.783.98$215
Jun 202106769.493.38$227
May 202103963.483.02$118
Apr 202103960.362.76$108
Mar 202103361.302.72$90
Feb 202103257.805.55$178
Jan 202103950.412.81$110
Dec 202004644.642.68$123
Nov 202005038.772.71$135
Oct 202005236.972.48$129
Sep 202004537.091.99$90
Aug 202004939.982.39$117
Jul 202005038.371.83$91
Jun 202005034.901.69$85
May 202005216.921.81$94
Apr 202005814.751.80$105
Mar 202005830.341.86$108
Feb 202005849.881.98$115
Jan 202005857.252.09$121
Dec 201905959.012.30$136
Nov 201905655.302.75$154
Oct 201904853.472.42$116
Sep 201904755.052.66$125
Aug 201905553.112.30$127
Jul 201906256.272.46$153
Jun 201906252.782.49$154
May 201907158.482.74$195
Apr 201906162.632.75$168
Mar 201906656.803.06$202
Feb 201905950.852.79$165
Jan 201905746.033.23$184
Dec 201806446.594.19$268
Nov 201806052.934.24$254
Oct 201806461.443.40$217
Sep 201807559.543.11$233
Aug 201804759.403.07$144
Jul 201806765.142.93$196
Jun 201806860.183.08$209
May 201807565.382.90$218
Apr 201807363.842.90$212
Mar 201807261.222.79$201
Feb 201807261.782.77$199
Jan 201807962.874.01$317
Dec 201706957.272.92$202
Nov 201709055.423.12$281
Oct 201708349.292.98$248
Sep 201703247.523.09$99
Aug 201704645.373.00$138
Jul 201705943.873.09$182
Jun 201706842.493.09$210
May 201707345.373.26$238
Apr 201707547.933.21$241
Mar 201707946.772.98$236
Feb 201707250.452.95$213
Jan 201707949.413.42$270
Dec 201608348.763.72$309
Nov 201607742.492.64$204
Oct 201608946.193.09$275
Sep 201608241.553.10$254
Aug 201607741.442.92$225
Jul 201608141.622.92$237
Jun 201608045.352.69$215
May 201609042.521.99$179
Apr 201608436.561.99$167
Mar 201609633.011.79$172
Feb 201609326.472.06$192
Jan 2016010327.352.36$244
Dec 2015011032.362.00$220
Nov 2015011338.792.17$245
Oct 2015012843.552.43$311
Sep 201504942.992.76$135
Aug 201507540.162.87$215
Jul 201509848.152.95$289
Jun 2015010056.152.88$288
May 2015010955.212.96$322
Apr 2015010649.822.71$287
Mar 2015010842.892.93$317
Feb 201509944.662.98$295
Jan 2015011443.433.10$353
Dec 2014013154.693.59$470
Nov 2014014770.464.25$625
Oct 2014017178.303.90$667
Sep 2014012886.164.05$518
Aug 2014014289.394.04$573
Jul 2014018796.564.18$782
Jun 2014021498.164.74$1,014
May 2014021994.734.73$1,035
Apr 201403595.944.81$168
Mar 201401895.895.06$91
Feb 201401297.406.19$74
Jan 201401190.404.86$53
Dec 201301491.824.35$61
Nov 201301388.853.74$49
Oct 201301597.423.78$57
Sep 2013011104.113.72$41
Aug 2013016104.253.52$56
Jul 2013012102.523.72$45
Jun 201302394.403.93$90
May 201303894.834.15$158
Apr 201301793.964.28$73
Mar 201305293.623.91$203
Feb 201301391.233.42$44
Jan 20130591.603.42$17
Dec 20120286.773.42$7
Nov 201203786.953.62$134
Oct 201203389.383.40$112
Sep 20120494.672.92$12
Aug 201205792.662.91$166
Jul 201204785.133.02$142
Jun 201201879.822.52$45
May 201202391.612.49$57
Apr 2012026101.652.00$52
Mar 2012039105.052.22$87
Feb 2012027101.102.57$69
Jan 201204898.092.73$131
Dec 201104796.873.24$152
Nov 201101295.723.31$40
Oct 201104284.983.65$153
Sep 201103883.623.99$151
Aug 201101383.404.15$54
Jul 201101694.144.52$72
Jun 201102092.904.64$93
May 201102598.134.40$110
Apr 2011078105.964.33$338
Mar 201107696.364.06$308
Feb 201109085.644.18$376
Jan 2011013086.504.59$597
Dec 2010010485.734.35$452
Nov 2010012780.843.80$482
Oct 201009978.103.51$347
Sep 2010012672.633.98$501
Aug 2010010673.684.42$468
Jul 2010014372.554.74$677
Jun 201008370.364.91$408
May 2010011571.124.24$487
Apr 201007181.694.12$293
Mar 2010013178.394.39$575
Feb 2010010373.585.44$561
Jan 2010013974.365.96$829
Dec 2009011271.445.48$614
Nov 2009014574.593.75$544
Oct 200908672.544.11$353
Sep 2009010565.543.06$322
Aug 2009020667.423.22$663
Jul 200905261.133.46$180
Jun 200909166.163.90$354
May 200906454.743.93$251
Apr 2009017246.773.59$617
Mar 2009018142.144.06$735
Feb 2009015832.814.63$732
Jan 2009018135.865.37$972
Dec 2008018137.105.98$1,082
Nov 2008017655.496.86$1,207
Oct 2008018475.246.92$1,274
Sep 20080131101.767.88$1,032
Aug 20080170114.228.48$1,442
Jul 20080173131.0811.39$1,970
Jun 20080169131.3313.03$2,203
May 20080179123.1711.57$2,072
Apr 20080177110.3110.45$1,851
Mar 20080176101.909.66$1,701
Feb 2008016992.538.77$1,482
Jan 2008018390.388.21$1,502
Dec 2007018188.337.30$1,322
Nov 2007018491.677.29$1,342
Oct 2007019582.856.92$1,350
Sep 2007017875.846.24$1,111
Aug 2007018969.066.39$1,207
Jul 2007019470.906.39$1,239
Jun 2007018962.007.55$1,427
May 2007016158.747.85$1,263
Apr 2007013759.617.81$1,069
Mar 2007016056.927.30$1,168
Feb 2007017455.108.22$1,430
Jan 2007016450.306.73$1,103
Dec 2006015156.656.92$1,045
Nov 2006018554.207.62$1,409
Oct 2006020654.906.01$1,239
Sep 2006017860.085.04$897
Aug 2006017168.717.34$1,255
Jul 2006017169.376.34$1,085
Jun 2006015166.286.38$964
May 2006018966.016.42$1,214
Apr 2006016864.397.36$1,237
Mar 2006019756.707.08$1,395
Feb 2006017057.597.75$1,318
Jan 2006012760.598.93$1,135
Dec 20050054.9413.42$0
Nov 200506754.6910.59$709
Oct 2005017458.3413.80$2,400
Sep 2005017261.4512.08$2,078
Aug 2005016861.519.80$1,646
Jul 2005017355.697.84$1,357
Jun 2005019252.337.38$1,417
May 2005012945.226.65$858
Apr 2005017849.207.36$1,310
Mar 2005019250.377.15$1,374
Feb 2005020945.226.31$1,319
Jan 2005019243.166.32$1,214
Dec 2004018939.866.75$1,276
Nov 2004018045.286.33$1,139
Oct 2004018049.706.52$1,173
Sep 2004023343.245.28$1,231
Aug 2004011842.375.55$655
Jul 2004010238.286.08$621
Jun 2004010536.106.43$675
May 2004012237.486.49$792
Apr 200409934.475.86$580
Mar 200409234.365.53$509
Feb 200407432.455.51$408
Jan 200408632.036.30$542
Dec 200306030.266.30$378
Nov 200305228.804.60$239
Oct 200303528.174.76$167
Sep 2003013126.314.75$622
Aug 2003019929.765.13$1,021
Jul 200308129.415.17$419
Jun 200302028.565.98$120
May 2003010226.595.97$609
Apr 2003016226.675.41$876
Mar 2003013031.146.10$792
Feb 2003012533.487.93$991
Jan 2003014930.315.58$832
Dec 2002012026.914.85$582
Nov 2002010224.664.14$422
Oct 2002012526.464.23$529
Sep 200207627.443.64$276
Aug 2002025725.963.16$813
Jul 2002035424.583.06$1,084
Jun 2002029023.733.34$968
May 2002030624.663.58$1,097
Apr 2002028423.653.51$998
Mar 2002036222.003.10$1,123
Feb 2002030918.222.38$734
Jan 2002038917.172.38$924
Dec 2001035216.932.36$832
Nov 2001034018.072.41$818
Oct 2001038119.782.53$964
Sep 2001035224.262.25$792
Aug 2001034524.873.05$1,053
Jul 2001033323.933.20$1,065
Jun 2001038524.563.82$1,472
May 2001035025.524.31$1,508
Apr 2001035924.685.34$1,915
Mar 2001040724.545.38$2,188
Feb 2001033127.755.77$1,909
Jan 2001034927.478.40$2,931
Dec 2000030826.889.12$2,810
Nov 2000035332.215.66$1,997
Oct 2000036431.235.15$1,873
Sep 2000035431.875.19$1,836
Aug 2000034729.644.54$1,576
Jul 2000030228.534.09$1,235
Jun 2000031929.304.40$1,403
May 2000032527.263.68$1,196
Apr 2000034924.513.12$1,087
Mar 2000037528.422.86$1,072
Feb 2000036227.622.73$987
Jan 2000032525.272.48$806
Dec 1999036324.282.42$880
Nov 1999040223.192.43$978
Oct 1999043120.982.80$1,208
Sep 1999038621.752.62$1,011
Aug 1999039119.262.88$1,124
Jul 1999038617.892.37$916
Jun 1999040915.942.36$966
May 1999043115.792.32$1,000
Apr 1999034915.102.21$771
Mar 1999033912.471.84$623
Feb 199903539.981.82$642
Jan 1999038410.381.90$730
Dec 199804009.201.77$709
Nov 1998036810.892.19$804
Oct 1998038312.421.97$754
Sep 1998037212.592.08$775
Aug 1998038711.301.91$738
Jul 1998045111.742.24$1,009
Jun 1998038611.242.24$864
May 1998040512.622.21$894
Apr 1998036013.042.51$902
Mar 1998046012.802.31$1,062
Feb 1998030713.952.30$706
Jan 1998045414.702.15$978
Dec 1997038616.322.41$931
Nov 1997048718.193.09$1,504
Oct 1997044319.253.15$1,395
Sep 1997047017.742.95$1,389
Aug 1997040917.862.55$1,045
Jul 1997041817.582.25$939
Jun 1997035317.242.26$797
May 1997038318.972.31$884
Apr 1997035617.882.08$741
Mar 1997046118.951.94$894
Feb 1997024520.492.21$540
Jan 1997044223.483.54$1,565
Dec 1996023523.32$0
Nov 1996027121.97$0
Oct 1996042923.31$0
Sep 1996043522.22$0
Aug 1996039420.26$0
Jul 1996038519.55$0
Jun 1996091818.73$0
May 1996038219.43$0
Apr 1996040521.51$0
Mar 1996037619.38$0
Feb 1996031416.98$0
Jan 1996033117.07$0
Dec 1995041717.19$0
Nov 1995030616.00$0
Oct 1995030215.43$0
Sep 1995036316.18$0
Aug 1995045115.92$0
Jul 1995042015.24$0
Jun 1995035416.41$0
May 1995039717.56$0
Apr 1995034017.73$0
Mar 1995035016.44$0
Feb 1995035516.58$0
Jan 1995042315.92$0
Dec 1994042415.03$0
Nov 1994044715.90$0
Oct 1994053215.58$0
Sep 1994041215.29$0
Aug 1994040816.13$0
Jul 1994037217.56$0
Jun 1994037517.09$0
May 1994027015.88$0
Apr 1994036314.14$0
Mar 1994028012.46$0
Feb 1994027312.50$0
Jan 1994037212.66$0
Dec 1993041712.33$0
Nov 1993044414.49$0
Oct 1993046815.85$0
Sep 1993052415.03$0
Aug 1993041815.66$0
Jul 1993058315.46$0
Jun 1993045216.79$0
May 1993040717.68$0
Apr 1993041518.05$0
Mar 1993045618.14$0
Feb 1993029617.90$0
Jan 1993041616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   58 Mcf  × $  3.05 =       $177

────────────────────────────────────────────────────
Month total                                     $177

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/91935 is the state's own key, not one this site invented.