CLEGG, BILL "A"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 93138District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$368 k
Jan 1993 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition17 bbl$1,080
GasProduction127,503 Mcf$366,853
Total$367,933

37,869 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3890, -101.4777. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.38895, -101.47770 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,843 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,843 ft.

Completions filed
Feb 1981
1 of 1 wells

1 well

42-1053319355156,843 ftFeb 1981

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260112106.413.05$341
Apr 2026012098.932.87$344
Mar 20260089.753.15$0
Feb 2026110863.503.75$469
Jan 2026111859.138.00$1,003
Dec 2025112256.664.41$595
Nov 2025111958.593.93$526
Oct 2025111859.383.30$449
Sep 2025113762.743.08$484
Aug 2025113963.933.01$483
Jul 2025113566.743.32$514
Jun 2025114766.483.13$526
May 2025214760.553.23$596
Apr 2025214462.363.54$635
Mar 2025214667.704.27$759
Feb 2025214070.884.34$749
Jan 20250074.324.28$0
Dec 2024015368.993.12$478
Nov 2024014669.052.20$321
Oct 20240971.372.28$21
Sep 20240469.612.36$9
Aug 20240575.632.06$10
Jul 20240079.932.15$0
Jun 20240378.082.63$8
May 20240278.812.20$4
Apr 20240284.451.66$3
Mar 20240180.301.55$2
Feb 20240676.091.78$11
Jan 2024012073.023.30$396
Dec 2023012371.262.61$321
Nov 2023011677.892.81$326
Oct 202307785.443.09$238
Sep 2023012589.042.74$342
Aug 202303980.522.67$104
Jul 202305474.852.64$143
Jun 202309668.962.26$217
May 2023011470.622.23$254
Apr 2023012578.122.24$280
Mar 2023013472.852.39$321
Feb 2023012675.112.47$311
Jan 2023017076.533.39$576
Dec 2022012376.415.73$705
Nov 2022014985.005.65$841
Oct 2022014387.185.86$839
Sep 2022016984.888.16$1,380
Aug 202207994.529.13$721
Jul 2022085101.587.54$641
Jun 2022098115.097.98$782
May 20220129109.378.43$1,088
Apr 2022087104.226.84$595
Mar 20220113108.885.08$574
Feb 2022010391.054.86$500
Jan 2022011981.844.54$540
Dec 2021013371.323.90$519
Nov 2021013377.435.24$697
Oct 2021012979.795.71$737
Sep 2021013969.865.35$744
Aug 2021014066.024.22$591
Jul 2021015370.783.98$609
Jun 2021016769.493.38$565
May 202108263.483.02$247
Apr 2021016960.362.76$466
Mar 2021017461.302.72$473
Feb 2021018457.805.55$1,021
Jan 202105450.412.81$152
Dec 202006044.642.68$161
Nov 202006438.772.71$173
Oct 202006836.972.48$169
Sep 202005837.091.99$115
Aug 202006439.982.39$153
Jul 202006538.371.83$119
Jun 202006534.901.69$110
May 202006816.921.81$123
Apr 202007514.751.80$135
Mar 202007630.341.86$141
Feb 202007449.881.98$147
Jan 202007657.252.09$159
Dec 2019011959.012.30$274
Nov 2019011755.302.75$322
Oct 2019011953.472.42$288
Sep 2019012055.052.66$319
Aug 2019013553.112.30$311
Jul 2019015456.272.46$379
Jun 2019013352.782.49$331
May 2019013758.482.74$375
Apr 2019016062.632.75$440
Mar 2019014456.803.06$441
Feb 2019013150.852.79$366
Jan 2019014146.033.23$455
Dec 2018015046.594.19$628
Nov 2018012952.934.24$547
Oct 2018019161.443.40$649
Sep 2018020059.543.11$622
Aug 2018016659.403.07$509
Jul 2018019065.142.93$557
Jun 2018015460.183.08$474
May 2018018765.382.90$542
Apr 2018018963.842.90$548
Mar 2018021061.222.79$585
Feb 2018010261.782.77$282
Jan 2018015362.874.01$613
Dec 2017016057.272.92$467
Nov 2017015255.423.12$474
Oct 2017015649.292.98$465
Sep 2017013447.523.09$414
Aug 2017016745.373.00$502
Jul 2017018643.873.09$574
Jun 2017021442.493.09$661
May 2017023545.373.26$767
Apr 2017016647.933.21$533
Mar 2017016646.772.98$495
Feb 2017011550.452.95$340
Jan 2017010449.413.42$356
Dec 201605348.763.72$197
Nov 201603642.492.64$95
Oct 201606046.193.09$185
Sep 2016012541.553.10$388
Aug 2016013741.442.92$401
Jul 2016012641.622.92$368
Jun 201608045.352.69$215
May 2016013342.521.99$265
Apr 2016012036.561.99$239
Mar 201606733.011.79$120
Feb 201609726.472.06$200
Jan 2016014527.352.36$343
Dec 201509832.362.00$196
Nov 2015010938.792.17$236
Oct 2015012343.552.43$298
Sep 2015014142.992.76$389
Aug 201509940.162.87$284
Jul 2015013848.152.95$406
Jun 2015013256.152.88$381
May 2015015555.212.96$458
Apr 201509749.822.71$263
Mar 2015014142.892.93$414
Feb 2015014944.662.98$443
Jan 2015024543.433.10$760
Dec 201404254.693.59$151
Nov 2014012970.464.25$548
Oct 2014017578.303.90$683
Sep 2014018686.164.05$752
Aug 2014019189.394.04$771
Jul 2014011596.564.18$481
Jun 20140298.164.74$9
May 20140194.734.73$5
Apr 201406995.944.81$332
Mar 2014013595.895.06$683
Feb 2014015797.406.19$972
Jan 2014016290.404.86$787
Dec 2013015791.824.35$684
Nov 2013013588.853.74$505
Oct 2013018097.423.78$680
Sep 20130139104.113.72$517
Aug 20130139104.253.52$490
Jul 20130158102.523.72$587
Jun 2013015994.403.93$625
May 2013011594.834.15$477
Apr 2013016393.964.28$698
Mar 2013010993.623.91$427
Feb 2013014091.233.42$479
Jan 2013015891.603.42$540
Dec 2012013786.773.42$469
Nov 2012012186.953.62$439
Oct 2012013989.383.40$473
Sep 201208294.672.92$239
Aug 201209292.662.91$268
Jul 201202485.133.02$73
Jun 201203579.822.52$88
May 201204891.612.49$119
Apr 20120139101.652.00$278
Mar 20120216105.052.22$480
Feb 20120123101.102.57$316
Jan 2012016498.092.73$448
Dec 2011016596.873.24$535
Nov 2011023295.723.31$768
Oct 2011021784.983.65$792
Sep 2011023483.623.99$933
Aug 2011024683.404.15$1,021
Jul 2011031094.144.52$1,400
Jun 2011038692.904.64$1,791
May 2011052998.134.40$2,330
Apr 2011082105.964.33$355
Mar 201108796.364.06$353
Feb 201107985.644.18$330
Jan 2011011886.504.59$541
Dec 2010015785.734.35$683
Nov 2010024680.843.80$934
Oct 2010010178.103.51$354
Sep 2010010072.633.98$398
Aug 2010010073.684.42$442
Jul 2010010072.554.74$474
Jun 201008070.364.91$393
May 2010017871.124.24$754
Apr 2010010481.694.12$429
Mar 2010011878.394.39$518
Feb 2010016773.585.44$909
Jan 2010016974.365.96$1,008
Dec 2009018071.445.48$987
Nov 2009010374.593.75$386
Oct 2009014372.544.11$588
Sep 2009017765.543.06$542
Aug 2009024967.423.22$801
Jul 2009025961.133.46$897
Jun 2009028666.163.90$1,114
May 2009034554.743.93$1,354
Apr 2009039446.773.59$1,413
Mar 2009042642.144.06$1,729
Feb 2009021832.814.63$1,010
Jan 2009029235.865.37$1,568
Dec 2008039237.105.98$2,343
Nov 2008030855.496.86$2,113
Oct 2008035375.246.92$2,443
Sep 20080125101.767.88$985
Aug 20080240114.228.48$2,036
Jul 20080235131.0811.39$2,677
Jun 20080238131.3313.03$3,102
May 20080253123.1711.57$2,928
Apr 20080263110.3110.45$2,750
Mar 20080277101.909.66$2,677
Feb 2008026292.538.77$2,298
Jan 2008032490.388.21$2,659
Dec 2007038188.337.30$2,782
Nov 2007031991.677.29$2,326
Oct 2007030082.856.92$2,077
Sep 2007029475.846.24$1,836
Aug 2007021369.066.39$1,361
Jul 2007026870.906.39$1,712
Jun 2007025762.007.55$1,940
May 2007022758.747.85$1,781
Apr 2007037459.617.81$2,919
Mar 2007046456.927.30$3,388
Feb 2007037255.108.22$3,056
Jan 2007039050.306.73$2,623
Dec 20060056.656.92$0
Nov 200601254.207.62$91
Oct 200606454.906.01$385
Sep 2006027160.085.04$1,365
Aug 2006043168.717.34$3,164
Jul 2006034169.376.34$2,163
Jun 2006030466.286.38$1,941
May 2006033166.016.42$2,127
Apr 2006025964.397.36$1,906
Mar 2006021356.707.08$1,509
Feb 2006016857.597.75$1,302
Jan 2006022860.598.93$2,037
Dec 200509354.9413.42$1,248
Nov 2005014654.6910.59$1,546
Oct 2005020358.3413.80$2,801
Sep 2005022361.4512.08$2,694
Aug 2005022861.519.80$2,234
Jul 2005021955.697.84$1,718
Jun 2005027852.337.38$2,052
May 2005022445.226.65$1,490
Apr 2005024749.207.36$1,818
Mar 2005024950.377.15$1,782
Feb 2005020345.226.31$1,281
Jan 2005024843.166.32$1,568
Dec 2004025539.866.75$1,722
Nov 2004025445.286.33$1,608
Oct 2004027749.706.52$1,805
Sep 2004022843.245.28$1,205
Aug 2004023742.375.55$1,316
Jul 2004025638.286.08$1,558
Jun 2004024936.106.43$1,602
May 2004032037.486.49$2,078
Apr 2004029234.475.86$1,711
Mar 2004032934.365.53$1,819
Feb 2004030632.455.51$1,686
Jan 2004035232.036.30$2,217
Dec 2003032730.266.30$2,061
Nov 2003036728.804.60$1,686
Oct 2003033728.174.76$1,604
Sep 2003033826.314.75$1,605
Aug 2003045229.765.13$2,319
Jul 2003015929.415.17$822
Jun 200309628.565.98$574
May 2003012026.595.97$717
Apr 2003031926.675.41$1,725
Mar 2003025331.146.10$1,542
Feb 2003023233.487.93$1,839
Jan 2003031730.315.58$1,770
Dec 2002035226.914.85$1,709
Nov 2002045724.664.14$1,891
Oct 2002049526.464.23$2,093
Sep 2002037327.443.64$1,356
Aug 2002041425.963.16$1,310
Jul 2002045724.583.06$1,399
Jun 2002039523.733.34$1,319
May 2002041824.663.58$1,498
Apr 2002042023.653.51$1,475
Mar 2002056422.003.10$1,750
Feb 2002049818.222.38$1,183
Jan 2002052117.172.38$1,238
Dec 2001049416.932.36$1,168
Nov 2001054918.072.41$1,321
Oct 2001062519.782.53$1,581
Sep 2001058524.262.25$1,317
Aug 2001055524.873.05$1,695
Jul 2001063523.933.20$2,030
Jun 2001047124.563.82$1,801
May 2001053825.524.31$2,317
Apr 2001060324.685.34$3,217
Mar 2001058224.545.38$3,129
Feb 2001053127.755.77$3,062
Jan 2001059127.478.40$4,964
Dec 2000046426.889.12$4,233
Nov 2000053232.215.66$3,010
Oct 2000064331.235.15$3,309
Sep 2000069931.875.19$3,625
Aug 2000012429.644.54$563
Jul 200009728.534.09$397
Jun 2000053229.304.40$2,339
May 2000071827.263.68$2,642
Apr 2000071224.513.12$2,219
Mar 2000079328.422.86$2,268
Feb 2000071327.622.73$1,944
Jan 2000054425.272.48$1,349
Dec 1999059524.282.42$1,442
Nov 1999068523.192.43$1,667
Oct 1999070520.982.80$1,977
Sep 1999071821.752.62$1,880
Aug 1999058719.262.88$1,688
Jul 1999016017.892.37$380
Jun 1999020115.942.36$475
May 1999016715.792.32$388
Apr 1999072515.102.21$1,601
Mar 1999082012.471.84$1,507
Feb 199906459.981.82$1,172
Jan 1999085110.381.90$1,617
Dec 199809569.201.77$1,695
Nov 199801,08610.892.19$2,374
Oct 1998098912.421.97$1,948
Sep 1998087112.592.08$1,814
Aug 199801,02711.301.91$1,959
Jul 199801,09811.742.24$2,457
Jun 199801,02611.242.24$2,295
May 199801,18212.622.21$2,608
Apr 199801,04913.042.51$2,628
Mar 1998031712.802.31$732
Feb 1998031413.952.30$722
Jan 1998035314.702.15$761
Dec 1997043116.322.41$1,039
Nov 1997053418.193.09$1,649
Oct 1997054019.253.15$1,701
Sep 1997056417.742.95$1,667
Aug 1997044717.862.55$1,142
Jul 1997046217.582.25$1,038
Jun 1997055017.242.26$1,241
May 1997062518.972.31$1,443
Apr 1997072017.882.08$1,500
Mar 1997074718.951.94$1,449
Feb 1997067020.492.21$1,478
Jan 1997076523.483.54$2,708
Dec 1996076423.32$0
Nov 1996072821.97$0
Oct 1996083123.31$0
Sep 1996075122.22$0
Aug 1996073220.26$0
Jul 1996070119.55$0
Jun 1996064518.73$0
May 1996078519.43$0
Apr 1996049721.51$0
Mar 1996094219.38$0
Feb 1996043516.98$0
Jan 1996069617.07$0
Dec 1995087617.19$0
Nov 1995075616.00$0
Oct 199501,00315.43$0
Sep 1995067616.18$0
Aug 1995067115.92$0
Jul 1995099615.24$0
Jun 1995088916.41$0
May 199501,01617.56$0
Apr 1995060417.73$0
Mar 1995066316.44$0
Feb 1995071716.58$0
Jan 199501,07815.92$0
Dec 199401,08215.03$0
Nov 1994082915.90$0
Oct 1994094015.58$0
Sep 1994086515.29$0
Aug 1994066816.13$0
Jul 1994080017.56$0
Jun 1994088917.09$0
May 1994068115.88$0
Apr 1994065914.14$0
Mar 1994087312.46$0
Feb 1994074512.50$0
Jan 1994091512.66$0
Dec 1993080512.33$0
Nov 1993082614.49$0
Oct 1993090315.85$0
Sep 1993055315.03$0
Aug 1993088115.66$0
Jul 1993093515.46$0
Jun 1993093816.79$0
May 1993086517.68$0
Apr 1993091818.05$0
Mar 1993087218.14$0
Feb 1993035217.90$0
Jan 1993062316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  112 Mcf  × $  3.05 =       $341

────────────────────────────────────────────────────
Month total                                     $341

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/93138 is the state's own key, not one this site invented.