Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 97323District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$320 k
Jan 1993 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition51 bbl$1,658
GasProduction79,626 Mcf$318,116
Total$319,773

13,938 Mcf of this lease's gas, across 46 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4322, -101.5933. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.43215, -101.59333 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,598 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,598 ft.

Completions filed
Nov 1981
1 of 1 wells

1 well

42-105334722067,598 ftNov 1981

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260166106.413.05$506
Apr 2026122698.932.87$747
Mar 20260089.753.15$0
Feb 2026111263.503.75$484
Jan 2026116359.138.00$1,363
Dec 2025113756.664.41$661
Nov 2025113758.593.93$597
Oct 2025115959.383.30$585
Sep 2025013562.743.08$415
Aug 2025115563.933.01$531
Jul 2025112266.743.32$471
Jun 2025114766.483.13$526
May 2025214760.553.23$596
Apr 2025216662.363.54$713
Mar 2025213667.704.27$716
Feb 2025213870.884.34$741
Jan 20250074.324.28$0
Dec 2024018568.993.12$577
Nov 2024029669.052.20$651
Oct 20240871.372.28$18
Sep 202402769.612.36$64
Aug 2024011075.632.06$227
Jul 2024016479.932.15$352
Jun 2024018678.082.63$490
May 2024012878.812.20$281
Apr 2024010184.451.66$168
Mar 2024020480.301.55$315
Feb 2024016776.091.78$298
Jan 2024016873.023.30$554
Dec 202305571.262.61$144
Nov 2023016677.892.81$466
Oct 2023012285.443.09$377
Sep 2023017789.042.74$484
Aug 2023021280.522.67$567
Jul 2023017474.852.64$460
Jun 2023020968.962.26$472
May 2023010470.622.23$232
Apr 2023011478.122.24$255
Mar 2023012072.852.39$287
Feb 2023015975.112.47$392
Jan 2023019576.533.39$661
Dec 2022017876.415.73$1,020
Nov 2022029785.005.65$1,677
Oct 2022021587.185.86$1,261
Sep 202201184.888.16$90
Aug 202201794.529.13$155
Jul 2022028101.587.54$211
Jun 20220137115.097.98$1,093
May 2022059109.378.43$498
Apr 20220219104.226.84$1,497
Mar 2022069108.885.08$350
Feb 2022014991.054.86$724
Jan 2022020081.844.54$908
Dec 2021020771.323.90$807
Nov 2021021877.435.24$1,142
Oct 2021021779.795.71$1,240
Sep 202102569.865.35$134
Aug 202104366.024.22$181
Jul 2021013570.783.98$538
Jun 2021021169.493.38$713
May 2021017363.483.02$522
Apr 2021020660.362.76$568
Mar 2021018261.302.72$494
Feb 2021021457.805.55$1,187
Jan 2021018350.412.81$514
Dec 2020015444.642.68$412
Nov 2020016538.772.71$447
Oct 2020017636.972.48$436
Sep 2020015037.091.99$299
Aug 2020016539.982.39$394
Jul 2020016738.371.83$305
Jun 2020016734.901.69$282
May 2020017616.921.81$319
Apr 2020019414.751.80$350
Mar 2020022030.341.86$408
Feb 2020016849.881.98$333
Jan 2020028357.252.09$593
Dec 201904259.012.30$97
Nov 2019017355.302.75$476
Oct 2019017753.472.42$428
Sep 2019020655.052.66$547
Aug 2019024453.112.30$562
Jul 2019014256.272.46$349
Jun 2019012352.782.49$306
May 2019018558.482.74$507
Apr 2019020162.632.75$553
Mar 2019012656.803.06$386
Feb 2019014650.852.79$408
Jan 2019012246.033.23$394
Dec 2018020146.594.19$841
Nov 2018012352.934.24$521
Oct 2018022561.443.40$765
Sep 2018033159.543.11$1,029
Aug 2018016859.403.07$515
Jul 2018023065.142.93$674
Jun 2018012760.183.08$391
May 2018023565.382.90$682
Apr 2018010463.842.90$302
Mar 2018019361.222.79$538
Feb 2018022061.782.77$609
Jan 2018024062.874.01$962
Dec 2017030357.272.92$885
Nov 2017029055.423.12$904
Oct 2017028849.292.98$859
Sep 2017014447.523.09$445
Aug 2017022545.373.00$676
Jul 2017011443.873.09$352
Jun 2017019342.493.09$596
May 2017028345.373.26$924
Apr 2017033047.933.21$1,060
Mar 2017026746.772.98$797
Feb 2017027550.452.95$812
Jan 2017039649.413.42$1,354
Dec 2016032548.763.72$1,210
Nov 2016034742.492.64$918
Oct 20160646.193.09$19
Sep 20160341.553.10$9
Aug 20160641.442.92$18
Jul 201601241.622.92$35
Jun 201602145.352.69$56
May 201603342.521.99$66
Apr 2016022736.561.99$452
Mar 2016010633.011.79$190
Feb 2016025126.472.06$518
Jan 2016036027.352.36$851
Dec 20150932.362.00$18
Nov 201508238.792.17$178
Oct 2015016943.552.43$410
Sep 2015024242.992.76$668
Aug 201507040.162.87$201
Jul 2015018448.152.95$542
Jun 2015015756.152.88$453
May 2015019555.212.96$576
Apr 2015017949.822.71$484
Mar 2015014042.892.93$411
Feb 2015014344.662.98$426
Jan 2015011143.433.10$344
Dec 2014014754.693.59$528
Nov 2014016670.464.25$706
Oct 2014016978.303.90$659
Sep 2014019386.164.05$781
Aug 2014017489.394.04$702
Jul 2014016596.564.18$690
Jun 2014019598.164.74$924
May 2014017694.734.73$832
Apr 2014021395.944.81$1,024
Mar 2014018595.895.06$936
Feb 2014022097.406.19$1,362
Jan 2014025490.404.86$1,235
Dec 2013028991.824.35$1,258
Nov 2013030588.853.74$1,140
Oct 2013024797.423.78$934
Sep 20130236104.113.72$877
Aug 20130506104.253.52$1,782
Jul 2013029102.523.72$108
Jun 201303994.403.93$153
May 201301994.834.15$79
Apr 2013024693.964.28$1,054
Mar 2013012093.623.91$470
Feb 2013020091.233.42$684
Jan 2013023791.603.42$811
Dec 2012020786.773.42$708
Nov 2012020186.953.62$729
Oct 2012019089.383.40$646
Sep 2012023094.672.92$671
Aug 2012019692.662.91$570
Jul 2012022485.133.02$677
Jun 2012022379.822.52$562
May 2012020591.612.49$510
Apr 20120239101.652.00$477
Mar 20120198105.052.22$440
Feb 20120217101.102.57$558
Jan 2012019698.092.73$536
Dec 2011020696.873.24$667
Nov 2011018395.723.31$606
Oct 2011021584.983.65$784
Sep 2011016183.623.99$642
Aug 2011017683.404.15$730
Jul 2011024694.144.52$1,111
Jun 2011023992.904.64$1,109
May 2011020898.134.40$916
Apr 20110186105.964.33$806
Mar 2011021196.364.06$856
Feb 2011023685.644.18$986
Jan 2011021086.504.59$964
Dec 2010031085.734.35$1,348
Nov 2010018180.843.80$687
Oct 2010031378.103.51$1,098
Sep 2010024272.633.98$963
Aug 201005973.684.42$261
Jul 2010027672.554.74$1,307
Jun 2010020470.364.91$1,002
May 2010018471.124.24$779
Apr 2010021181.694.12$870
Mar 2010019578.394.39$856
Feb 2010023073.585.44$1,252
Jan 2010026774.365.96$1,592
Dec 2009021471.445.48$1,174
Nov 2009021274.593.75$795
Oct 2009033772.544.11$1,385
Sep 2009024365.543.06$745
Aug 2009020067.423.22$644
Jul 2009026161.133.46$904
Jun 2009014166.163.90$549
May 2009032154.743.93$1,260
Apr 200908046.773.59$287
Mar 2009022342.144.06$905
Feb 2009033432.814.63$1,547
Jan 2009015635.865.37$838
Dec 2008034737.105.98$2,074
Nov 2008021855.496.86$1,496
Oct 2008054175.246.92$3,745
Sep 20080157101.767.88$1,237
Aug 20080307114.228.48$2,604
Jul 20080311131.0811.39$3,542
Jun 20080414131.3313.03$5,396
May 20080487123.1711.57$5,637
Apr 20080135110.3110.45$1,411
Mar 2008055101.909.66$532
Feb 200807792.538.77$675
Jan 2008030590.388.21$2,503
Dec 2007019888.337.30$1,446
Nov 2007023291.677.29$1,692
Oct 2007031282.856.92$2,160
Sep 2007025775.846.24$1,605
Aug 2007024769.066.39$1,578
Jul 2007031870.906.39$2,031
Jun 2007029462.007.55$2,219
May 2007026858.747.85$2,103
Apr 2007028559.617.81$2,224
Mar 2007030256.927.30$2,205
Feb 2007025655.108.22$2,103
Jan 2007026150.306.73$1,756
Dec 2006032856.656.92$2,269
Nov 2006031354.207.62$2,384
Oct 2006038954.906.01$2,339
Sep 2006042160.085.04$2,121
Aug 2006044768.717.34$3,281
Jul 20060069.376.34$0
Jun 2006021066.286.38$1,341
May 2006038866.016.42$2,493
Apr 2006040264.397.36$2,959
Mar 2006040256.707.08$2,847
Feb 2006034857.597.75$2,697
Jan 2006043760.598.93$3,904
Dec 2005043254.9413.42$5,795
Nov 2005038554.6910.59$4,077
Oct 2005050858.3413.80$7,008
Sep 2005049661.4512.08$5,991
Aug 2005029461.519.80$2,880
Jul 2005046155.697.84$3,616
Jun 200509352.337.38$686
May 2005050945.226.65$3,385
Apr 2005087649.207.36$6,448
Mar 200509150.377.15$651
Feb 200509245.226.31$581
Jan 2005023343.166.32$1,473
Dec 2004039239.866.75$2,646
Nov 2004053645.286.33$3,393
Oct 2004055249.706.52$3,596
Sep 2004069443.245.28$3,667
Aug 2004085342.375.55$4,735
Jul 200401,21138.286.08$7,368
Jun 200401,63836.106.43$10,537
May 200401,98837.486.49$12,911
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 199801911.242.24$43
May 1998042812.622.21$944
Apr 1998039413.042.51$987
Mar 1998038412.802.31$887
Feb 1998026813.952.30$616
Jan 1998031614.702.15$681
Dec 1997027816.322.41$670
Nov 1997031718.193.09$979
Oct 1997049119.253.15$1,547
Sep 1997010017.742.95$295
Aug 199707817.862.55$199
Jul 1997034517.582.25$775
Jun 1997041817.242.26$944
May 1997024318.972.31$561
Apr 1997035917.882.08$748
Mar 1997011118.951.94$215
Feb 1997030120.492.21$664
Jan 1997036323.483.54$1,285
Dec 1996039623.32$0
Nov 1996034921.97$0
Oct 1996042123.31$0
Sep 1996023122.22$0
Aug 1996035620.26$0
Jul 1996035619.55$0
Jun 1996033018.73$0
May 1996032019.43$0
Apr 1996042321.51$0
Mar 1996048719.38$0
Feb 1996042316.98$0
Jan 1996029217.07$0
Dec 19950017.19$0
Nov 1995019616.00$0
Oct 1995031815.43$0
Sep 1995032916.18$0
Aug 1995027415.92$0
Jul 1995031515.24$0
Jun 1995024416.41$0
May 19950017.56$0
Apr 1995023717.73$0
Mar 1995025516.44$0
Feb 1995022716.58$0
Jan 19953424115.92$541
Dec 1994023115.03$0
Nov 1994022715.90$0
Oct 1994023615.58$0
Sep 1994023115.29$0
Aug 1994034216.13$0
Jul 1994033817.56$0
Jun 1994028917.09$0
May 1994029215.88$0
Apr 1994031714.14$0
Mar 1994029412.46$0
Feb 1994027312.50$0
Jan 1994030212.66$0
Dec 1993015112.33$0
Nov 1993015614.49$0
Oct 1993022715.85$0
Sep 1993035215.03$0
Aug 1993026415.66$0
Jul 1993034715.46$0
Jun 1993026416.79$0
May 1993033817.68$0
Apr 1993036318.05$0
Mar 1993035518.14$0
Feb 1993033317.90$0
Jan 1993039616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  166 Mcf  × $  3.05 =       $506

────────────────────────────────────────────────────
Month total                                     $506

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/97323 is the state's own key, not one this site invented.