SPRING CREEK

Operated by SISTERS OPERATING COMPANY (P-5 785010) in the BAKER RANCH (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11332District 7CField 05143300OilCasinghead gasSaveExport
Value, all time
$413 k
Jan 1993 – May 2005
Value, last 12 filed months
$29 k
at the published price for each month
Months reported
149
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 132 leases and 192 wells, and the rule below applies to all of them.

Discovered
1976-03-22
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: THE TOLERANCE ACREAGE OF 40 WAS REMOVED PER DOCKET 7C-0231629.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition4,083 bbl$80,941
Casinghead gasProduction172,363 Mcf$332,533
Total$413,474

80,102 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.1340, -100.8956. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

31.13405, -100.89559 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
100.0%
2 of 2 wells
Median depth
7,032 ft
2 wells filed one
Completion to plug
30.3 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
2100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
2100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,004 and 7,060 ft, median 7,032 ft, over the 2 wells that filed a depth.

Completions filed
Jul 1982 – Feb 1983
2 of 2 wells
Plug dates filed
Feb 2013 – Mar 2013
2 of 2 wells

Last completion to plug: a median of 30.3 years across the 2 wells that filed both dates, with the middle half between 30.2 years and 30.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-2353201327,060 ftFeb 1983Feb 2013Yes
42-2353192617,004 ftJul 1982Mar 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (149)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

149 months

May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 2004070945.286.33$4,488
Oct 2004071149.706.52$4,632
Sep 20047571343.245.28$7,010
Aug 2004071342.375.55$3,958
Jul 2004067538.286.08$4,107
Jun 2004069736.106.43$4,484
May 2004075737.486.49$4,916
Apr 200401,11634.475.86$6,538
Mar 200401,26134.365.53$6,974
Feb 2004042132.455.51$2,320
Jan 20041401,09832.036.30$11,401
Dec 2003046730.266.30$2,943
Nov 2003078428.804.60$3,603
Oct 200301,01728.174.76$4,841
Sep 200301,02426.314.75$4,863
Aug 200301,10729.765.13$5,679
Jul 200301,03229.415.17$5,336
Jun 2003084728.565.98$5,068
May 2003075426.595.97$4,503
Apr 2003072826.675.41$3,937
Mar 20031781,02631.146.10$11,797
Feb 2003070833.487.93$5,612
Jan 2003083230.315.58$4,644
Dec 2002073326.914.85$3,558
Nov 2002077524.664.14$3,206
Oct 2002067726.464.23$2,863
Sep 2002093027.443.64$3,381
Aug 200214677025.963.16$6,227
Jul 2002078024.583.06$2,388
Jun 2002055723.733.34$1,859
May 200201,08224.663.58$3,878
Apr 2002059023.653.51$2,072
Mar 2002062822.003.10$1,949
Feb 2002078718.222.38$1,870
Jan 2002072217.172.38$1,715
Dec 200116388316.932.36$4,847
Nov 2001072618.072.41$1,746
Oct 2001090419.782.53$2,286
Sep 200101,14224.262.25$2,571
Aug 2001089824.873.05$2,742
Jul 2001094823.933.20$3,031
Jun 2001080224.563.82$3,067
May 200117985225.524.31$8,238
Apr 2001099524.685.34$5,309
Mar 200101,00424.545.38$5,398
Feb 2001072927.755.77$4,204
Jan 200101,10427.478.40$9,272
Dec 2000073826.889.12$6,732
Nov 2000072732.215.66$4,113
Oct 2000176031.235.15$5,496
Sep 2000097431.875.19$5,052
Aug 200001,01829.644.54$4,622
Jul 200001,07428.534.09$4,392
Jun 200001,01629.304.40$4,468
May 200001,05127.263.68$3,867
Apr 200001,16124.513.12$3,618
Mar 2000089728.422.86$2,565
Feb 2000093227.622.73$2,541
Jan 20001801,11625.272.48$7,317
Dec 199901,11024.282.42$2,690
Nov 199901,02523.192.43$2,495
Oct 1999099320.982.80$2,784
Sep 199901,00421.752.62$2,629
Aug 199901,04519.262.88$3,005
Jul 199901,12417.892.37$2,667
Jun 199901,11415.942.36$2,631
May 1999087415.792.32$2,029
Apr 1999086915.102.21$1,919
Mar 199918195212.471.84$4,007
Feb 199901,0929.981.82$1,985
Jan 1999089810.381.90$1,706
Dec 199809399.201.77$1,665
Nov 199801,04010.892.19$2,273
Oct 1998098412.421.97$1,938
Sep 1998086912.592.08$1,810
Aug 199801,41811.301.91$2,705
Jul 19981791,02011.742.24$4,383
Jun 199801,27111.242.24$2,844
May 199801,32912.622.21$2,932
Apr 199801,46313.042.51$3,665
Mar 199801,52612.802.31$3,524
Feb 199801,41613.952.30$3,256
Jan 199801,04914.702.15$2,260
Dec 19971841,12816.322.41$5,723
Nov 199701,73918.193.09$5,370
Oct 199701,72819.253.15$5,443
Sep 199701,44517.742.95$4,270
Aug 199701,22517.862.55$3,130
Jul 199701,41517.582.25$3,179
Jun 199701,32517.242.26$2,991
May 199701,12918.972.31$2,606
Apr 19971771,06617.882.08$5,385
Mar 199701,43618.951.94$2,785
Feb 199701,03720.492.21$2,288
Jan 199701,24523.483.54$4,407
Dec 199601,32723.32$0
Nov 19961781,58921.97$3,911
Oct 199601,66523.31$0
Sep 199601,47922.22$0
Aug 199601,84620.26$0
Jul 199601,87419.55$0
Jun 199601,72818.73$0
May 19961941,86119.43$3,769
Apr 199601,67221.51$0
Mar 199601,43019.38$0
Feb 199601,13516.98$0
Jan 19961731,64317.07$2,953
Dec 199501,41817.19$0
Nov 199501,42816.00$0
Oct 199502,82815.43$0
Sep 19951711,42616.18$2,767
Aug 199501,45615.92$0
Jul 199501,48915.24$0
Jun 199501,67516.41$0
May 199501,52217.56$0
Apr 19951761,45717.73$3,120
Mar 199501,40116.44$0
Feb 199501,52416.58$0
Jan 199501,36515.92$0
Dec 199401,59315.03$0
Nov 19941801,38815.90$2,862
Oct 199401,56415.58$0
Sep 199401,27915.29$0
Aug 199401,41416.13$0
Jul 199401,36717.56$0
Jun 19941801,59717.09$3,076
May 199401,50915.88$0
Apr 199401,66114.14$0
Mar 199401,86212.46$0
Feb 19941751,30112.50$2,188
Jan 199402,31512.66$0
Dec 199301,80512.33$0
Nov 19931771,87314.49$2,565
Oct 199301,72615.85$0
Sep 199302,46415.03$0
Aug 199302,14015.66$0
Jul 19931741,87215.46$2,690
Jun 199301,88416.79$0
May 199301,59817.68$0
Apr 199301,50918.05$0
Mar 19931702,23118.14$3,084
Feb 199302,24617.90$0
Jan 19931771,66616.93$2,997

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2004 — as filed, then multipliedworked
Oil                    0 bbl  × $ 45.28 =         $0
Casinghead gas       709 Mcf  × $  6.33 =     $4,488

────────────────────────────────────────────────────
Month total                                   $4,488

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/11332 is the state's own key, not one this site invented.