BIG STATE RANCH "10"

Operated by HOOVER PETROLEUM COMPANY, LLC (P-5 399501) in the SHANNON (SAN ANDRES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11388District 7CField 82663568Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.4 M
Jan 1993 – May 2026
Value, last 12 filed months
$45 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 92 leases and 473 wells, and the rule below applies to all of them.

Discovered
1943-03-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2011-05-24.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: SEE COMM. LETTER 1/22/65 FOR TESTING

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition33,465 bbl$1,367,659
Casinghead gasProduction31,792 Mcf$46,853
Total$1,414,512

16,348 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.8121, -101.6560. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.1 miles.

30.81206, -101.65605 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
2,378 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
2100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 2,271 and 2,485 ft, median 2,378 ft, over the 2 wells that filed a depth.

Completions filed
May 1985 – Jul 1985
2 of 2 wells

2 wells

42-1053504622,271 ftJul 1985
42-1053500712,485 ftMay 1985

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026550106.413.05$5,853
Apr 20260098.932.87$0
Mar 2026146089.753.15$13,104
Feb 202672063.503.75$4,572
Jan 20260059.138.00$0
Dec 2025147056.664.41$8,329
Nov 20250058.593.93$0
Oct 2025145059.383.30$8,610
Sep 20250062.743.08$0
Aug 202572063.933.01$4,603
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 202565060.553.23$3,936
Apr 202562062.363.54$3,866
Mar 20250067.704.27$0
Feb 202569070.884.34$4,891
Jan 202567074.324.28$4,979
Dec 2024136068.993.12$9,383
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 202470069.612.36$4,873
Aug 202467075.632.06$5,067
Jul 202469079.932.15$5,515
Jun 202469078.082.63$5,388
May 202467078.812.20$5,280
Apr 20240084.451.66$0
Mar 202469080.301.55$5,541
Feb 202480076.091.78$6,087
Jan 202493073.023.30$6,791
Dec 20230071.262.61$0
Nov 202394077.892.81$7,322
Oct 20230085.443.09$0
Sep 202394089.042.74$8,370
Aug 202397080.522.67$7,810
Jul 20230074.852.64$0
Jun 2023103068.962.26$7,103
May 2023103070.622.23$7,274
Apr 20230078.122.24$0
Mar 202365072.852.39$4,735
Feb 20230075.112.47$0
Jan 202369076.533.39$5,281
Dec 202265076.415.73$4,967
Nov 20220085.005.65$0
Oct 202271087.185.86$6,190
Sep 202270084.888.16$5,942
Aug 20220094.529.13$0
Jul 2022780101.587.54$7,923
Jun 202200115.097.98$0
May 2022670109.378.43$7,328
Apr 2022710104.226.84$7,400
Mar 2022720108.885.08$7,839
Feb 202267091.054.86$6,100
Jan 2022134081.844.54$10,967
Dec 202165071.323.90$4,636
Nov 202162077.435.24$4,801
Oct 2021126079.795.71$10,054
Sep 2021122069.865.35$8,523
Aug 202163066.024.22$4,159
Jul 20210070.783.98$0
Jun 2021122069.493.38$8,478
May 20210063.483.02$0
Apr 202162060.362.76$3,742
Mar 20212061.302.72$123
Feb 20210057.805.55$0
Jan 202160050.412.81$3,025
Dec 202063044.642.68$2,812
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 2020166039.982.39$6,637
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 2020167016.921.81$2,826
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 2020170057.252.09$9,733
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 2019166053.472.42$8,876
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 2019165056.272.46$9,285
Jun 20190052.782.49$0
May 2019165058.482.74$9,649
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 2019166050.852.79$8,441
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 2018165052.934.24$8,733
Oct 20180061.443.40$0
Sep 20182059.543.11$119
Aug 2018172059.403.07$10,217
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 2018165065.382.90$10,788
Apr 20180063.842.90$0
Mar 2018159061.222.79$9,734
Feb 20182061.782.77$124
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20172047.523.09$95
Aug 2017173045.373.00$7,849
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 2017174047.933.21$8,340
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 2017141049.413.42$6,967
Dec 20160048.763.72$0
Nov 2016167042.492.64$7,096
Oct 20160046.193.09$0
Sep 2016170041.553.10$7,064
Aug 20160041.442.92$0
Jul 2016173041.622.92$7,200
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 2016168027.352.36$4,595
Dec 20150032.362.00$0
Nov 2015168038.792.17$6,517
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 2015165056.152.88$9,265
May 20150055.212.96$0
Apr 2015165049.822.71$8,220
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 2014173078.303.90$13,546
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 2014166096.564.18$16,029
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 2014163095.944.81$15,638
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 2014153090.404.86$13,831
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 2013167097.423.78$16,269
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 20131700102.523.72$17,428
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 2013174093.964.28$16,349
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 2013168091.603.42$15,389
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 2012166089.383.40$14,837
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 2012162085.133.02$13,791
Jun 20120079.822.52$0
May 2012150091.612.49$13,742
Apr 201200101.652.00$0
Mar 20121700105.052.22$17,859
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 2011139096.873.24$13,465
Nov 20110095.723.31$0
Oct 2011146084.983.65$12,407
Sep 20110083.623.99$0
Aug 2011163083.404.15$13,594
Jul 20110094.144.52$0
Jun 20110292.904.64$9
May 2011166498.134.40$16,307
Apr 201104105.964.33$17
Mar 2011166296.364.06$16,004
Feb 20110385.644.18$13
Jan 2011148486.504.59$12,820
Dec 20100385.734.35$13
Nov 2010166280.843.80$13,427
Oct 20100278.103.51$7
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 2010171072.554.74$12,406
Jun 2010166070.364.91$11,680
May 20100271.124.24$8
Apr 20100481.694.12$16
Mar 20100478.394.39$18
Feb 2010153473.585.44$11,280
Jan 20100574.365.96$30
Dec 20090671.445.48$33
Nov 2009151574.593.75$11,282
Oct 20090572.544.11$21
Sep 2009169465.543.06$11,089
Aug 20090467.423.22$13
Jul 2009175361.133.46$10,708
Jun 20090266.163.90$8
May 20090254.743.93$8
Apr 2009323446.773.59$15,121
Mar 2009162342.144.06$6,839
Feb 20090332.814.63$14
Jan 20090435.865.37$21
Dec 20080337.105.98$18
Nov 20080255.496.86$14
Oct 2008170275.246.92$12,805
Sep 200802101.767.88$16
Aug 200803114.228.48$25
Jul 20081793131.0811.39$23,497
Jun 200802131.3313.03$26
May 200802123.1711.57$23
Apr 200804110.3110.45$42
Mar 20081685101.909.66$17,168
Feb 20080592.538.77$44
Jan 20080590.388.21$41
Dec 20070588.337.30$37
Nov 20070591.677.29$36
Oct 2007176582.856.92$14,616
Sep 20070575.846.24$31
Aug 20070469.066.39$26
Jul 20070770.906.39$45
Jun 20070962.007.55$68
May 20071651158.747.85$9,778
Apr 200701159.617.81$86
Mar 20070856.927.30$58
Feb 20070555.108.22$41
Jan 2007161550.306.73$8,132
Dec 20060656.656.92$42
Nov 20060754.207.62$53
Oct 200601254.906.01$72
Sep 20060060.085.04$0
Aug 2006168068.717.34$11,543
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 2006166064.397.36$10,689
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 2005168054.9413.42$9,230
Nov 20050054.6910.59$0
Oct 2005136058.3413.80$7,934
Sep 20050061.4512.08$0
Aug 2005161061.519.80$9,903
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 2005167045.226.65$7,552
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 2005167045.226.31$7,552
Jan 20050043.166.32$0
Dec 2004168039.866.75$6,696
Nov 20040045.286.33$0
Oct 2004167049.706.52$8,300
Sep 2004172043.245.28$7,437
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 2004157036.106.43$5,668
May 20040037.486.49$0
Apr 2004154034.475.86$5,308
Mar 20040034.365.53$0
Feb 2004171032.455.51$5,549
Jan 20040032.036.30$0
Dec 2003180030.266.30$5,447
Nov 20030028.804.60$0
Oct 2003174028.174.76$4,902
Sep 20030026.314.75$0
Aug 2003177029.765.13$5,268
Jul 2003175029.415.17$5,147
Jun 20030028.565.98$0
May 2003176026.595.97$4,680
Apr 20030026.675.41$0
Mar 2003169031.146.10$5,263
Feb 20030033.487.93$0
Jan 2003182030.315.58$5,516
Dec 2002182026.914.85$4,898
Nov 20020024.664.14$0
Oct 2002177026.464.23$4,683
Sep 20020027.443.64$0
Aug 2002165025.963.16$4,283
Jul 20020024.583.06$0
Jun 2002158023.733.34$3,749
May 2002167024.663.58$4,118
Apr 20020023.653.51$0
Mar 2002329022.003.10$7,238
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 2001164016.932.36$2,777
Nov 20010018.072.41$0
Oct 2001148019.782.53$2,927
Sep 2001167024.262.25$4,051
Aug 20010024.873.05$0
Jul 2001165023.933.20$3,948
Jun 2001167024.563.82$4,102
May 20010025.524.31$0
Apr 2001172024.685.34$4,245
Mar 20010024.545.38$0
Feb 2001163027.755.77$4,523
Jan 2001172027.478.40$4,725
Dec 200016840326.889.12$8,192
Nov 2000040332.215.66$2,280
Oct 200017140031.235.15$7,399
Sep 2000037331.875.19$1,935
Aug 200016141929.644.54$6,675
Jul 200016741028.534.09$6,441
Jun 2000042529.304.40$1,869
May 200016238727.263.68$5,840
Apr 200016960624.513.12$6,030
Mar 2000037728.422.86$1,078
Feb 200015235627.622.73$5,169
Jan 200015436525.272.48$4,797
Dec 199915732224.282.42$4,592
Nov 199915335123.192.43$4,402
Oct 1999035920.982.80$1,007
Sep 199915933321.752.62$4,330
Aug 199915435819.262.88$3,996
Jul 1999031117.892.37$738
Jun 199916445215.942.36$3,682
May 199915538415.792.32$3,339
Apr 199915843615.102.21$3,349
Mar 199915638812.471.84$2,659
Feb 199903659.981.82$663
Jan 199916033710.381.90$2,301
Dec 19981632569.201.77$1,954
Nov 199815831710.892.19$2,413
Oct 199815742712.421.97$2,791
Sep 199815625912.592.08$2,503
Aug 1998035811.301.91$683
Jul 199816433011.742.24$2,664
Jun 199816627811.242.24$2,488
May 1998030712.622.21$677
Apr 199816624613.042.51$2,781
Mar 199815715312.802.31$2,363
Feb 199817624813.952.30$3,025
Jan 199815824114.702.15$2,842
Dec 199716217016.322.41$3,054
Nov 1997011518.193.09$355
Oct 199715812819.253.15$3,445
Sep 199715914817.742.95$3,258
Aug 199716522417.862.55$3,519
Jul 199717521417.582.25$3,557
Jun 199716021117.242.26$3,235
May 1997025518.972.31$589
Apr 199715827217.882.08$3,392
Mar 199717625718.951.94$3,834
Feb 199715322420.492.21$3,629
Jan 199715725323.483.54$4,582
Dec 199615128423.32$3,521
Nov 199615925921.97$3,493
Oct 199615726223.31$3,660
Sep 199615225522.22$3,377
Aug 199615625520.26$3,161
Jul 199617525519.55$3,421
Jun 199617725518.73$3,315
May 199617923519.43$3,478
Apr 19961829921.51$3,915
Mar 1996010819.38$0
Feb 199617627116.98$2,988
Jan 199617724817.07$3,021
Dec 199517933617.19$3,077
Nov 199517833816.00$2,848
Oct 199517639115.43$2,716
Sep 199518137616.18$2,929
Aug 199517637915.92$2,802
Jul 199518138615.24$2,758
Jun 199517838316.41$2,921
May 199518141117.56$3,178
Apr 199517829517.73$3,156
Mar 199517737616.44$2,910
Feb 199518136416.58$3,001
Jan 199517938515.92$2,850
Dec 199417842015.03$2,675
Nov 199417842615.90$2,830
Oct 199417342615.58$2,695
Sep 199417528515.29$2,676
Aug 199417738516.13$2,855
Jul 199417740017.56$3,108
Jun 199435235317.09$6,016
May 199416234115.88$2,573
Apr 199417732014.14$2,503
Mar 199417358612.46$2,156
Feb 199417252212.50$2,150
Jan 199417058912.66$2,152
Dec 199317745112.33$2,182
Nov 199335342414.49$5,115
Oct 199317944515.85$2,837
Sep 199317524415.03$2,630
Aug 199317335415.66$2,709
Jul 199317523215.46$2,706
Jun 199317631316.79$2,955
May 199335833617.68$6,329
Apr 199318035618.05$3,249
Mar 199317234418.14$3,120
Feb 199335929417.90$6,426
Jan 199317529616.93$2,963

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                   55 bbl  × $106.41 =     $5,853
Casinghead gas         0 Mcf  × $  3.05 =         $0

────────────────────────────────────────────────────
Month total                                   $5,853

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/11388 is the state's own key, not one this site invented.