SUGG -A-

Operated by ENDEAVOR ENERGY RESOURCES L.P. (P-5 251726) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14151District 7CField 85279200OilCasinghead gasSaveExport
Value, all time
$395 k
Nov 1995 – Mar 2008
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
149
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,461 leases and 22,481 wells, and the rule below applies to all of them.

Discovered
1904-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2016-03-08.

The Commission's schedule remark for this field reads: AREA) 85279200.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,032 bbl$40,969
Casinghead gasProduction155,605 Mcf$354,420
Total$395,389

50,764 Mcf of this lease's gas, across 14 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (4)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5929, -101.4446. A lease has no coordinate of its own — that point is the mean of its wells, and they span 2.5 miles.

31.58765, -101.44443 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
4 of 4 wells
With a plug date
100.0%
4 of 4 wells
Median depth
7,803 ft
4 wells filed one
Completion to plug
26.1 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
4100.0%
A plug date is filed
4100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
4100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,569 and 8,100 ft, median 7,803 ft, over the 4 wells that filed a depth.

Completions filed
Jan 1967 – Mar 2004
2 of 4 wells; 2 filed none
Plug dates filed
Sep 1997 – Aug 2025
4 of 4 wells

Last completion to plug: a median of 26.1 years across the 2 wells that filed both dates, with the middle half between 23.8 years and 28.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

4 wells

42-3831072737,800 ftJul 2001Yes
42-3831083488,100 ftSep 1997Yes
42-3831065827,569 ftMar 2004Aug 2025Yes
42-3831088513 L7,805 ftJan 1967Sep 1997Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (149)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

149 months

Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 200732082.856.92$2,651
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20061066.016.42$66
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 2005149050.377.15$7,505
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 2004074634.365.53$4,125
Feb 200401,04132.455.51$5,736
Jan 200401,11632.036.30$7,030
Dec 200301,12930.266.30$7,115
Nov 200311,11128.804.60$5,134
Oct 200301,18128.174.76$5,621
Sep 200301,14026.314.75$5,414
Aug 200301,20929.765.13$6,202
Jul 200301,20529.415.17$6,231
Jun 200301,17528.565.98$7,030
May 200301,22026.595.97$7,287
Apr 200301,18926.675.41$6,429
Mar 200301,18631.146.10$7,230
Feb 200301,10033.487.93$8,718
Jan 200301,19630.315.58$6,676
Dec 200201,21326.914.85$5,888
Nov 200201,19524.664.14$4,944
Oct 200201,25626.464.23$5,312
Sep 200201,18227.443.64$4,297
Aug 200211,21725.963.16$3,877
Jul 200201,24224.583.06$3,803
Jun 200201,23823.733.34$4,133
May 200201,24824.663.58$4,473
Apr 200201,25323.653.51$4,401
Mar 20021191,29622.003.10$6,639
Feb 200201,16818.222.38$2,775
Jan 200201,31217.172.38$3,117
Dec 200101,40116.932.36$3,313
Nov 200101,39418.072.41$3,353
Oct 200101,47919.782.53$3,740
Sep 200101,46024.262.25$3,287
Aug 200101,58224.873.05$4,830
Jul 200101,63523.933.20$5,227
Jun 200101,61324.563.82$6,168
May 200101,68225.524.31$7,245
Apr 200101,62024.685.34$8,643
Mar 200101,54824.545.38$8,323
Feb 200101,41327.755.77$8,149
Jan 200101,23927.478.40$10,406
Dec 2000066726.889.12$6,085
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 2000011229.304.40$492
May 2000019727.263.68$725
Apr 2000024024.513.12$748
Mar 2000029228.422.86$835
Feb 2000032327.622.73$881
Jan 2000037325.272.48$925
Dec 1999037724.282.42$914
Nov 1999040423.192.43$983
Oct 1999049520.982.80$1,388
Sep 1999052421.752.62$1,372
Aug 1999055919.262.88$1,607
Jul 1999064717.892.37$1,535
Jun 1999068215.942.36$1,611
May 1999074215.792.32$1,722
Apr 1999076615.102.21$1,691
Mar 199939182012.471.84$6,383
Feb 199907699.981.82$1,398
Jan 1999091510.381.90$1,738
Dec 199801,1569.201.77$2,050
Nov 1998089610.892.19$1,958
Oct 199801,05712.421.97$2,081
Sep 199801,26312.592.08$2,630
Aug 199801,37111.301.91$2,615
Jul 199802,80211.742.24$6,269
Jun 199801,37211.242.24$3,070
May 199801,38512.622.21$3,056
Apr 199801,28913.042.51$3,229
Mar 199801,32012.802.31$3,048
Feb 199801,22513.952.30$2,816
Jan 199801,34614.702.15$2,900
Dec 199701,29216.322.41$3,115
Nov 199701,26218.193.09$3,897
Oct 199701,48019.253.15$4,662
Sep 199701,34917.742.95$3,986
Aug 199701,35317.862.55$3,457
Jul 199702,62817.582.25$5,905
Jun 199702,97217.242.26$6,708
May 199713,51218.972.31$8,126
Apr 199703,10517.882.08$6,467
Mar 19974483,38918.951.94$15,061
Feb 199703,16820.492.21$6,988
Jan 199733,11523.483.54$11,097
Dec 199603,20623.32$0
Nov 199603,60421.97$0
Oct 199603,80923.31$0
Sep 199602,49822.22$0
Aug 199603,77220.26$0
Jul 199603,86619.55$0
Jun 199603,75018.73$0
May 199613,63319.43$19
Apr 199613,67821.51$22
Mar 199603,70719.38$0
Feb 19964433,04616.98$7,522
Jan 199603,69917.07$0
Dec 199503,87817.19$0
Nov 19954414,61816.00$7,056

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2007 — as filed, then multipliedworked
Oil                   32 bbl  × $ 82.85 =     $2,651
Casinghead gas         0 Mcf  × $  6.92 =         $0

────────────────────────────────────────────────────
Month total                                   $2,651

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/14151 is the state's own key, not one this site invented.