Operated by DIAMONDBACK E&P LLC (P-5 217012) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14165District 7CField 85279200OilCasinghead gasSaveExport
Value, all time
$3.5 M
Nov 1995 – May 2026
Value, last 12 filed months
$80 k
at the published price for each month
Months reported
367
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,461 leases and 22,481 wells, and the rule below applies to all of them.

Discovered
1904-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2016-03-08.

The Commission's schedule remark for this field reads: AREA) 85279200.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition34,013 bbl$2,247,685
Casinghead gasProduction336,341 Mcf$1,253,481
Total$3,501,166

16,847 Mcf of this lease's gas, across 14 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5135, -101.5147. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

31.51349, -101.51466 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
50.0%
1 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
9,008 ft
2 wells filed one
Completion to plug
37.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
150.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
150.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 8,000 and 10,015 ft, median 9,008 ft, over the 2 wells that filed a depth.

Completions filed
May 1981 – May 2012
2 of 2 wells
Plug dates filed
May 2018
1 of 2 wells; 1 filed none

Last completion to plug: a median of 37.0 years across the 1 well that filed both dates, with the middle half between 37.0 years and 37.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-38337584210,015 ftMay 2012
42-3831105018,000 ftMay 1981May 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (367)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

367 months

May 20260118106.413.05$359
Apr 2026012698.932.87$362
Mar 2026010489.753.15$328
Feb 202609363.503.75$349
Jan 2026021459.138.00$1,712
Dec 20257022656.664.41$4,964
Nov 202517174858.593.93$12,956
Oct 2025060659.383.30$2,003
Sep 20251681,04362.743.08$13,750
Aug 2025096063.933.01$2,894
Jul 202517753366.743.32$13,580
Jun 20253441,17366.483.13$26,539
May 2025029360.553.23$947
Apr 2025011662.363.54$411
Mar 2025015067.704.27$640
Feb 202517860570.884.34$15,243
Jan 2025076774.324.28$3,282
Dec 20241781,00868.993.12$15,427
Nov 202418099669.052.20$14,619
Oct 202418398271.372.28$15,301
Sep 202418297369.612.36$14,970
Aug 202418315375.632.06$14,156
Jul 20240079.932.15$0
Jun 202403978.082.63$103
May 202418586078.812.20$16,471
Apr 202418484184.451.66$16,934
Mar 20243511,10880.301.55$29,897
Feb 2024150276.091.78$971
Jan 2024011073.023.30$363
Dec 202334250571.262.61$25,689
Nov 202316355477.892.81$14,251
Oct 202317130385.443.09$15,546
Sep 202384874989.042.74$77,554
Aug 20231694880.522.67$13,736
Jul 20231699074.852.64$12,887
Jun 2023057568.962.26$1,299
May 202317353770.622.23$13,413
Apr 202316689378.122.24$14,966
Mar 202301,00472.852.39$2,403
Feb 202317486375.112.47$15,197
Jan 20231851,05976.533.39$17,746
Dec 2022053476.415.73$3,059
Nov 2022066585.005.65$3,755
Oct 202217993487.185.86$21,082
Sep 2022094084.888.16$7,674
Aug 2022089894.529.13$8,196
Jul 2022176937101.587.54$24,945
Jun 20220927115.097.98$7,395
May 2022177330109.378.43$22,141
Apr 20220606104.226.84$4,144
Mar 2022170721108.885.08$22,170
Feb 2022084091.054.86$4,081
Jan 202217494681.844.54$18,533
Dec 2021090671.323.90$3,533
Nov 202117191477.435.24$18,027
Oct 2021075479.795.71$4,308
Sep 2021077269.865.35$4,131
Aug 202116473366.024.22$13,921
Jul 2021093370.783.98$3,715
Jun 202117773169.493.38$14,771
May 2021069963.483.02$2,109
Apr 202116797060.362.76$12,756
Mar 202101,03661.302.72$2,815
Feb 202117360157.805.55$13,334
Jan 2021099650.412.81$2,799
Dec 20201681,03044.642.68$10,255
Nov 202001,00738.772.71$2,726
Oct 20201761,04236.972.48$9,089
Sep 202001,01137.091.99$2,013
Aug 20201701,04639.982.39$9,291
Jul 202001,02938.371.83$1,878
Jun 20201771,07234.901.69$7,989
May 2020084716.921.81$1,537
Apr 202017498714.751.80$4,347
Mar 202001,01530.341.86$1,884
Feb 202018195949.881.98$10,928
Jan 202001,03257.252.09$2,162
Dec 20191761,15059.012.30$13,036
Nov 2019084955.302.75$2,335
Oct 20191731,08053.472.42$11,862
Sep 201901,05955.052.66$2,814
Aug 20191611,04853.112.30$10,966
Jul 20191641,02756.272.46$11,755
Jun 201901,01152.782.49$2,519
May 20191691,05958.482.74$12,785
Apr 20191611,01662.632.75$12,878
Mar 201901,07956.803.06$3,304
Feb 20199299050.852.79$7,443
Jan 20191731,04846.033.23$11,346
Dec 201816898746.594.19$11,958
Nov 201801,08452.934.24$4,593
Oct 20181811,15461.443.40$15,042
Sep 20181751,09959.543.11$13,835
Aug 20181581,17559.403.07$12,988
Jul 2018111,23365.142.93$4,332
Jun 201815094260.183.08$11,925
May 201801,06265.382.90$3,081
Apr 20181581,20463.842.90$13,579
Mar 201801,28261.222.79$3,573
Feb 20181651,16461.782.77$13,413
Jan 201801,25862.874.01$5,044
Dec 20171531,30757.272.92$12,581
Nov 20171311,22755.423.12$11,086
Oct 20171541,28649.292.98$11,428
Sep 201701,28347.523.09$3,961
Aug 20171541,32045.373.00$10,953
Jul 201701,37343.873.09$4,239
Jun 20171441,38742.493.09$10,401
May 20171051,38145.373.26$9,271
Apr 20171281,33447.933.21$10,419
Mar 20171191,37946.772.98$9,680
Feb 20171401,22450.452.95$10,677
Jan 20171491,34349.413.42$11,954
Dec 2016901,34348.763.72$9,388
Nov 20161341,35242.492.64$9,269
Oct 20161371,28846.193.09$10,308
Sep 20161291,36341.553.10$9,586
Aug 2016571,44641.442.92$6,591
Jul 20161331,46541.622.92$9,820
Jun 20162481,46645.352.69$15,184
May 20161551,57542.521.99$9,726
Apr 201601,50436.561.99$2,995
Mar 20163361,60233.011.79$13,965
Feb 201601,48326.472.06$3,060
Jan 20161681,48227.352.36$8,099
Dec 20151751,61032.362.00$8,885
Nov 20151831,56638.792.17$10,493
Oct 20151741,64743.552.43$11,574
Sep 201501,58442.992.76$4,369
Aug 20151651,75340.162.87$11,662
Jul 20151581,81948.152.95$12,965
Jun 20151771,86956.152.88$15,327
May 20151551,93155.212.96$14,265
Apr 20153101,90849.822.71$20,608
Mar 201501,96742.892.93$5,773
Feb 20151681,82444.662.98$12,931
Jan 20151732,07943.433.10$13,960
Dec 20144222,15854.693.59$30,829
Nov 201401,88770.464.25$8,023
Oct 20141712,10778.303.90$21,609
Sep 20141582,00386.164.05$21,716
Aug 20141481,96289.394.04$21,147
Jul 20143262,04096.564.18$40,005
Jun 20141742,03298.164.74$26,705
May 20142672,11894.734.73$35,304
Apr 201401,59695.944.81$7,675
Mar 20144892,41295.895.06$59,087
Feb 20141802,36897.406.19$32,195
Jan 20141752,75190.404.86$29,192
Dec 20133542,87891.824.35$45,036
Nov 20133512,62488.853.74$40,996
Oct 20135172,89697.423.78$61,311
Sep 20131722,904104.113.72$28,703
Aug 20134673,221104.253.52$60,031
Jul 20135233,361102.523.72$66,113
Jun 20133483,06394.403.93$44,899
May 20137061,40494.834.15$72,775
Apr 20135242,62593.964.28$60,477
Mar 20136672,35493.623.91$71,655
Feb 20131741,63891.233.42$21,476
Jan 201353094091.603.42$51,763
Dec 20125241,22186.773.42$49,644
Nov 20125181,34686.953.62$49,919
Oct 20127081,14389.383.40$67,167
Sep 201217080394.672.92$18,437
Aug 20121821,61992.662.91$21,572
Jul 20125222,59285.133.02$52,268
Jun 20127624,07379.822.52$71,083
May 20121771,19391.612.49$19,184
Apr 201217036101.652.00$17,352
Mar 20120369105.052.22$820
Feb 20120239101.102.57$614
Jan 2012047898.092.73$1,307
Dec 2011052396.873.24$1,694
Nov 2011052595.723.31$1,738
Oct 2011048384.983.65$1,762
Sep 2011051383.623.99$2,045
Aug 2011046883.404.15$1,942
Jul 2011056794.144.52$2,561
Jun 201116746192.904.64$17,653
May 2011049198.134.40$2,163
Apr 20111484105.964.33$2,203
Mar 2011050696.364.06$2,053
Feb 2011042285.644.18$1,764
Jan 2011052086.504.59$2,386
Dec 2010052585.734.35$2,283
Nov 201017055880.843.80$15,861
Oct 2010056578.103.51$1,983
Sep 2010058172.633.98$2,312
Aug 2010161173.684.42$2,774
Jul 2010063972.554.74$3,027
Jun 2010030470.364.91$1,493
May 201015859871.124.24$13,770
Apr 2010058681.694.12$2,416
Mar 2010051078.394.39$2,238
Feb 2010037173.585.44$2,019
Jan 2010060874.365.96$3,626
Dec 200915361671.445.48$14,308
Nov 2009058574.593.75$2,195
Oct 2009064972.544.11$2,668
Sep 2009057865.543.06$1,771
Aug 2009058867.423.22$1,892
Jul 2009064961.133.46$2,248
Jun 200914063266.163.90$11,724
May 2009065654.743.93$2,575
Apr 2009043046.773.59$1,543
Mar 2009020342.144.06$824
Feb 200913955632.814.63$7,137
Jan 2009064035.865.37$3,437
Dec 2008062737.105.98$3,748
Nov 2008071855.496.86$4,926
Oct 2008027575.246.92$1,904
Sep 2008144282101.767.88$16,875
Aug 20080608114.228.48$5,158
Jul 20080485131.0811.39$5,524
Jun 20080512131.3313.03$6,673
May 20080604123.1711.57$6,991
Apr 20082598110.3110.45$6,473
Mar 2008173495101.909.66$22,412
Feb 2008021792.538.77$1,903
Jan 2008059390.388.21$4,866
Dec 2007058588.337.30$4,272
Nov 2007058691.677.29$4,273
Oct 2007061382.856.92$4,243
Sep 200715960875.846.24$15,855
Aug 2007064169.066.39$4,095
Jul 2007049470.906.39$3,156
Jun 2007049462.007.55$3,729
May 2007052158.747.85$4,088
Apr 2007044959.617.81$3,505
Mar 200715348056.927.30$12,214
Feb 2007046255.108.22$3,796
Jan 2007045350.306.73$3,047
Dec 2006035656.656.92$2,463
Nov 2006062954.207.62$4,791
Oct 2006066354.906.01$3,987
Sep 200614764360.085.04$12,071
Aug 2006066068.717.34$4,844
Jul 2006068469.376.34$4,338
Jun 2006066466.286.38$4,239
May 2006072966.016.42$4,684
Apr 200615546764.397.36$13,418
Mar 2006066156.707.08$4,682
Feb 2006063757.597.75$4,937
Jan 2006063460.598.93$5,664
Dec 2005166054.9413.42$8,909
Nov 200514663154.6910.59$14,666
Oct 2005058158.3413.80$8,015
Sep 2005040461.4512.08$4,880
Aug 2005069661.519.80$6,819
Jul 2005070555.697.84$5,530
Jun 200513267652.337.38$11,897
May 2005069145.226.65$4,596
Apr 2005166849.207.36$4,966
Mar 2005068550.377.15$4,901
Feb 200513461245.226.31$9,922
Jan 2005068843.166.32$4,350
Dec 2004070039.866.75$4,726
Nov 2004072745.286.33$4,602
Oct 200415247849.706.52$10,669
Sep 2004072543.245.28$3,831
Aug 2004046842.375.55$2,598
Jul 2004072638.286.08$4,417
Jun 2004171536.106.43$4,636
May 2004030937.486.49$2,007
Apr 200415172134.475.86$9,429
Mar 2004175134.365.53$4,188
Feb 2004077832.455.51$4,286
Jan 2004032032.036.30$2,016
Dec 200313870530.266.30$8,619
Nov 2003071428.804.60$3,281
Oct 2003077428.174.76$3,684
Sep 2003067526.314.75$3,206
Aug 200313762129.765.13$7,263
Jul 2003063029.415.17$3,258
Jun 2003071728.565.98$4,290
May 2003170326.595.97$4,225
Apr 2003071726.675.41$3,877
Mar 20039672731.146.10$7,421
Feb 2003066233.487.93$5,247
Jan 20037673930.315.58$6,429
Dec 2002078726.914.85$3,820
Nov 2002059024.664.14$2,441
Oct 20027569826.464.23$4,936
Sep 2002075127.443.64$2,730
Aug 200214234625.963.16$4,781
Jul 2002040324.583.06$1,234
Jun 2002177023.733.34$2,594
May 2002080124.663.58$2,871
Apr 200214277523.653.51$6,080
Mar 2002080422.003.10$2,495
Feb 2002074718.222.38$1,775
Jan 2002071717.172.38$1,703
Dec 200117076816.932.36$4,694
Nov 2001071218.072.41$1,713
Oct 2001081619.782.53$2,064
Sep 2001061324.262.25$1,380
Aug 2001046324.873.05$1,414
Jul 200116061223.933.20$5,785
Jun 2001071524.563.82$2,734
May 2001068425.524.31$2,946
Apr 2001175424.685.34$4,048
Mar 2001088724.545.38$4,769
Feb 200113879027.755.77$8,385
Jan 200121,09427.478.40$9,243
Dec 200011,05026.889.12$9,606
Nov 200016758032.215.66$8,661
Oct 2000017931.235.15$921
Sep 2000012931.875.19$669
Aug 200006629.644.54$300
Jul 20000028.534.09$0
Jun 20006180129.304.40$5,310
May 200001,59027.263.68$5,851
Apr 200001,47724.513.12$4,602
Mar 20001091,03628.422.86$6,060
Feb 20001841,09027.622.73$8,054
Jan 2000163625.272.48$1,603
Dec 1999082224.282.42$1,992
Nov 1999096523.192.43$2,349
Oct 1999098720.982.80$2,767
Sep 1999098121.752.62$2,569
Aug 1999061819.262.88$1,777
Jul 19992731,20917.892.37$7,752
Jun 199911,01015.942.36$2,402
May 199911,09115.792.32$2,548
Apr 199911,40415.102.21$3,115
Mar 19990012.471.84$0
Feb 19993644029.981.82$4,363
Jan 1999146610.381.90$896
Dec 199817709.201.77$1,375
Nov 1998080110.892.19$1,751
Oct 1998095012.421.97$1,871
Sep 1998096112.592.08$2,001
Aug 19984381,19511.301.91$7,229
Jul 199843896911.742.24$7,310
Jun 1998098911.242.24$2,213
May 19980012.622.21$0
Apr 199806713.042.51$168
Mar 1998048912.802.31$1,129
Feb 1998011913.952.30$274
Jan 199801114.702.15$24
Dec 1997068316.322.41$1,647
Nov 1997142318.193.09$1,325
Oct 1997474419.253.15$2,420
Sep 1997045517.742.95$1,344
Aug 19970117.862.55$3
Jul 1997042317.582.25$950
Jun 1997082517.242.26$1,862
May 1997078218.972.31$1,805
Apr 199701,02417.882.08$2,133
Mar 19973671,08518.951.94$9,059
Feb 199701,00320.492.21$2,213
Jan 199701,20123.483.54$4,251
Dec 1996188823.32$23
Nov 1996197521.97$22
Oct 1996095623.31$0
Sep 1996179122.22$22
Aug 1996083320.26$0
Jul 199624,03919.55$39
Jun 199601,19418.73$0
May 19962961,09019.43$5,751
Apr 199601,33021.51$0
Mar 199601,09219.38$0
Feb 1996094616.98$0
Jan 1996048917.07$0
Dec 199501,17717.19$0
Nov 19955571,04716.00$8,912

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas       118 Mcf  × $  3.05 =       $359

────────────────────────────────────────────────────
Month total                                     $359

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/14165 is the state's own key, not one this site invented.