BROOKS 3

Operated by IRION CORPORATION, THE (P-5 426299) in the BROOKS (CANYON K) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14961District 7CField 12244075OilCasinghead gasSaveExport
Value, all time
$412 k
Feb 2000 – Jan 2020
Value, last 12 filed months
$0
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 65 leases and 102 wells, and the rule below applies to all of them.

Discovered
1973-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1983-12-12.

The Commission's schedule remark for this field reads: PER DOCKET #7C-81,406.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition3,500 bbl$205,759
Casinghead gasProduction40,823 Mcf$206,706
Total$412,465

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.2419, -100.7820. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.24194, -100.78198 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,455 ft
1 wells filed one
Completion to plug
34.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,455 ft.

Completions filed
Dec 1984
1 of 1 wells
Plug dates filed
Jul 2019
1 of 1 wells

Last completion to plug: a median of 34.6 years across the 1 well that filed both dates, with the middle half between 34.6 years and 34.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2353237126,455 ftDec 1984Jul 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 201982046.033.23$3,774
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 201604148.763.72$153
Nov 201605242.492.64$138
Oct 201604346.193.09$133
Sep 201607141.553.10$220
Aug 201609041.442.92$263
Jul 201609741.622.92$284
Jun 2016012345.352.69$330
May 2016013442.521.99$267
Apr 2016014636.561.99$291
Mar 201615915333.011.79$5,523
Feb 2016015026.472.06$310
Jan 2016014727.352.36$348
Dec 2015013232.362.00$264
Nov 2015013538.792.17$293
Oct 2015014843.552.43$359
Sep 2015015042.992.76$414
Aug 2015015940.162.87$457
Jul 2015016448.152.95$483
Jun 2015015856.152.88$455
May 201516416955.212.96$9,554
Apr 2015016249.822.71$438
Mar 2015018542.892.93$543
Feb 2015020144.662.98$598
Jan 2015040343.433.10$1,250
Dec 201402,20354.693.59$7,912
Nov 2014085370.464.25$3,627
Oct 2014024378.303.90$948
Sep 2014014586.164.05$587
Aug 2014015489.394.04$621
Jul 2014015796.564.18$656
Jun 2014014998.164.74$706
May 201417914994.734.73$17,661
Apr 2014014995.944.81$717
Mar 2014015295.895.06$769
Feb 2014013997.406.19$861
Jan 2014015190.404.86$734
Dec 2013015591.824.35$675
Nov 2013014788.853.74$550
Oct 2013015197.423.78$571
Sep 20130149104.113.72$554
Aug 20130152104.253.52$535
Jul 2013186153102.523.72$19,638
Jun 2013015094.403.93$590
May 2013016494.834.15$680
Apr 2013016693.964.28$711
Mar 2013013693.623.91$532
Feb 2013010591.233.42$359
Jan 2013014891.603.42$506
Dec 2012015886.773.42$540
Nov 2012015386.953.62$555
Oct 2012015989.383.40$541
Sep 2012015994.672.92$464
Aug 2012016492.662.91$477
Jul 2012016385.133.02$492
Jun 201218014679.822.52$14,735
May 2012016391.612.49$406
Apr 20120148101.652.00$296
Mar 20120152105.052.22$338
Feb 20120142101.102.57$365
Jan 2012015898.092.73$432
Dec 2011016396.873.24$528
Nov 2011015995.723.31$526
Oct 2011016084.983.65$584
Sep 2011015583.623.99$618
Aug 2011015983.404.15$660
Jul 201118615794.144.52$18,219
Jun 2011014392.904.64$664
May 2011013198.134.40$577
Apr 20110144105.964.33$624
Mar 2011016196.364.06$653
Feb 2011014485.644.18$602
Jan 2011016286.504.59$743
Dec 2010016785.734.35$726
Nov 2010016280.843.80$615
Oct 2010016878.103.51$589
Sep 2010016072.633.98$637
Aug 2010016573.684.42$729
Jul 2010017172.554.74$810
Jun 201017915570.364.91$13,356
May 2010016871.124.24$712
Apr 2010016581.694.12$680
Mar 2010017078.394.39$746
Feb 2010015373.585.44$833
Jan 2010017074.365.96$1,014
Dec 2009017071.445.48$932
Nov 2009016574.593.75$619
Oct 2009017372.544.11$711
Sep 2009016665.543.06$509
Aug 2009017467.423.22$560
Jul 2009017561.133.46$606
Jun 200916217066.163.90$11,380
May 2009017754.743.93$695
Apr 2009017246.773.59$617
Mar 2009016142.144.06$654
Feb 2009016432.814.63$760
Jan 2009018335.865.37$983
Dec 2008018637.105.98$1,112
Nov 2008018055.496.86$1,235
Oct 2008018575.246.92$1,281
Sep 20080181101.767.88$1,426
Aug 20080186114.228.48$1,578
Jul 2008174188131.0811.39$24,949
Jun 20080181131.3313.03$2,359
May 20080188123.1711.57$2,176
Apr 20080176110.3110.45$1,840
Mar 20080515101.909.66$4,977
Feb 2008017192.538.77$1,500
Jan 2008017690.388.21$1,444
Dec 2007017388.337.30$1,263
Nov 2007016991.677.29$1,232
Oct 200718717982.856.92$16,732
Sep 2007017675.846.24$1,099
Aug 2007018369.066.39$1,169
Jul 2007018470.906.39$1,175
Jun 2007018262.007.55$1,374
May 2007018658.747.85$1,459
Apr 2007018059.617.81$1,405
Mar 2007018456.927.30$1,344
Feb 2007016655.108.22$1,364
Jan 2007018350.306.73$1,231
Dec 2006019056.656.92$1,315
Nov 2006018654.207.62$1,417
Oct 200619719054.906.01$11,958
Sep 2006018560.085.04$932
Aug 2006019268.717.34$1,409
Jul 2006019469.376.34$1,231
Jun 2006018666.286.38$1,187
May 2006019266.016.42$1,234
Apr 2006018964.397.36$1,391
Mar 2006019556.707.08$1,381
Feb 2006017857.597.75$1,380
Jan 2006020560.598.93$1,831
Dec 2005019754.9413.42$2,643
Nov 2005015454.6910.59$1,631
Oct 2005021158.3413.80$2,911
Sep 200512920361.4512.08$10,379
Aug 2005021261.519.80$2,077
Jul 2005022555.697.84$1,765
Jun 2005022252.337.38$1,639
May 2005022445.226.65$1,490
Apr 2005021449.207.36$1,575
Mar 2005022350.377.15$1,596
Feb 2005020545.226.31$1,294
Jan 200517922643.166.32$9,154
Dec 2004022739.866.75$1,533
Nov 2004022545.286.33$1,424
Oct 2004024149.706.52$1,570
Sep 2004023743.245.28$1,252
Aug 2004024842.375.55$1,377
Jul 2004024738.286.08$1,503
Jun 2004023936.106.43$1,537
May 200417819937.486.49$7,964
Apr 2004023434.475.86$1,371
Mar 2004024834.365.53$1,371
Feb 2004022832.455.51$1,256
Jan 2004024832.036.30$1,562
Dec 2003024930.266.30$1,569
Nov 2003024428.804.60$1,121
Oct 2003021928.174.76$1,042
Sep 2003021226.314.75$1,007
Aug 2003022029.765.13$1,129
Jul 2003012429.415.17$641
Jun 200313714528.565.98$4,780
May 2003019026.595.97$1,135
Apr 2003018326.675.41$990
Mar 2003018931.146.10$1,152
Feb 2003016433.487.93$1,300
Jan 2003022130.315.58$1,234
Dec 200207726.914.85$374
Nov 2002013324.664.14$550
Oct 200218818626.464.23$5,761
Sep 2002020327.443.64$738
Aug 2002021425.963.16$677
Jul 2002022224.583.06$680
Jun 2002022123.733.34$738
May 2002020624.663.58$738
Apr 2002021423.653.51$752
Mar 2002021822.003.10$676
Feb 200218017718.222.38$3,700
Jan 2002023617.172.38$561
Dec 2001023216.932.36$549
Nov 2001025618.072.41$616
Oct 2001027819.782.53$703
Sep 2001028024.262.25$630
Aug 2001025424.873.05$776
Jul 2001026523.933.20$847
Jun 2001026324.563.82$1,006
May 2001028025.524.31$1,206
Apr 200119927824.685.34$6,395
Mar 2001028624.545.38$1,538
Feb 2001026727.755.77$1,540
Jan 2001029027.478.40$2,436
Dec 2000030026.889.12$2,737
Nov 2000028632.215.66$1,618
Oct 2000031231.235.15$1,605
Sep 2000027931.875.19$1,447
Aug 200018027729.644.54$6,593
Jul 2000029928.534.09$1,223
Jun 2000014629.304.40$642
May 2000013227.263.68$486
Apr 20002212024.513.12$913
Mar 20007154428.422.86$3,574
Feb 2000239527.622.73$1,132

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2019 — as filed, then multipliedworked
Oil                   82 bbl  × $ 46.03 =     $3,774
Casinghead gas         0 Mcf  × $  3.23 =         $0

────────────────────────────────────────────────────
Month total                                   $3,774

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/14961 is the state's own key, not one this site invented.