AMACKER-HALFF "85" B

Operated by EOG RESOURCES, INC. (P-5 253162) in the AMACKER-TIPPETT, SW (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14974District 7CField 02220700OilCasinghead gasSaveExport
Value, all time
$3.4 M
Mar 2000 – Aug 2012
Value, last 12 filed months
$22 k
at the published price for each month
Months reported
150
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 94 leases and 140 wells, and the rule below applies to all of them.

Discovered
1977-05-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1996-05-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/2002.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition80,584 bbl$2,295,575
Casinghead gasProduction222,494 Mcf$1,117,707
Total$3,413,282

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3681, -102.0653. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.36806, -102.06528 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,400 ft
1 wells filed one
Completion to plug
7 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,400 ft.

Completions filed
Nov 2016
1 of 1 wells
Plug dates filed
Jun 2017
1 of 1 wells

Last completion to plug: a median of 7 months across the 1 well that filed both dates, with the middle half between 7 months and 7 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4613401719,400 ftNov 2016Jun 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (150)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

150 months

Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 2012176098.092.73$17,264
Dec 2011022896.873.24$739
Nov 2011013795.723.31$454
Oct 2011021284.983.65$773
Sep 2011058783.623.99$2,340
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 2011022298.134.40$978
Apr 20110102105.964.33$442
Mar 2011019296.364.06$779
Feb 201118615585.644.18$16,577
Jan 2011016686.504.59$762
Dec 2010014585.734.35$630
Nov 2010014180.843.80$535
Oct 2010014878.103.51$519
Sep 2010017872.633.98$708
Aug 201016918673.684.42$13,274
Jul 2010022672.554.74$1,070
Jun 20100070.364.91$0
May 201004,00871.124.24$16,975
Apr 2010088281.694.12$3,636
Mar 2010018178.394.39$794
Feb 201006373.585.44$343
Jan 2010017374.365.96$1,032
Dec 2009017571.445.48$960
Nov 2009012674.593.75$473
Oct 2009014972.544.11$612
Sep 200907665.543.06$233
Aug 2009024067.423.22$772
Jul 2009020561.133.46$710
Jun 2009020566.163.90$798
May 2009024554.743.93$962
Apr 2009019046.773.59$682
Mar 2009024542.144.06$994
Feb 2009015032.814.63$695
Jan 2009010635.865.37$569
Dec 2008028037.105.98$1,674
Nov 2008023755.496.86$1,626
Oct 200817332075.246.92$15,232
Sep 20080127101.767.88$1,000
Aug 20080254114.228.48$2,155
Jul 20080259131.0811.39$2,950
Jun 20080105131.3313.03$1,368
May 20080314123.1711.57$3,634
Apr 20080183110.3110.45$1,913
Mar 20080300101.909.66$2,899
Feb 2008034392.538.77$3,008
Jan 2008020590.388.21$1,682
Dec 2007030588.337.30$2,227
Nov 200715622491.677.29$15,934
Oct 2007039982.856.92$2,762
Sep 2007021575.846.24$1,342
Aug 2007029969.066.39$1,910
Jul 2007025670.906.39$1,635
Jun 2007032062.007.55$2,416
May 2007026158.747.85$2,048
Apr 2007036259.617.81$2,825
Mar 2007030156.927.30$2,198
Feb 2007055455.108.22$4,552
Jan 20070050.306.73$0
Dec 2006010956.656.92$754
Nov 2006019954.207.62$1,516
Oct 2006017354.906.01$1,040
Sep 2006039560.085.04$1,990
Aug 2006011168.717.34$815
Jul 2006016969.376.34$1,072
Jun 2006024966.286.38$1,590
May 2006012366.016.42$790
Apr 20062518464.397.36$2,964
Mar 200618530656.707.08$12,657
Feb 2006022557.597.75$1,744
Jan 200618434960.598.93$14,266
Dec 2005029554.9413.42$3,958
Nov 2005032254.6910.59$3,409
Oct 2005034358.3413.80$4,732
Sep 200518230461.4512.08$14,856
Aug 2005027661.519.80$2,704
Jul 2005023055.697.84$1,804
Jun 2005021752.337.38$1,602
May 2005011345.226.65$752
Apr 2005013949.207.36$1,023
Mar 2005017050.377.15$1,216
Feb 200517218545.226.31$8,946
Jan 2005023643.166.32$1,492
Dec 2004015639.866.75$1,053
Nov 2004019545.286.33$1,234
Oct 200418133349.706.52$11,165
Sep 2004026543.245.28$1,400
Aug 2004032742.375.55$1,815
Jul 200418730838.286.08$9,032
Jun 2004038536.106.43$2,477
May 2004031337.486.49$2,033
Apr 2004039634.475.86$2,320
Mar 200417136534.365.53$7,894
Feb 2004034032.455.51$1,873
Jan 200418837732.036.30$8,397
Dec 2003035630.266.30$2,243
Nov 200337944628.804.60$12,965
Oct 2003046028.174.76$2,189
Sep 2003044226.314.75$2,099
Aug 2003047029.765.13$2,411
Jul 2003046529.415.17$2,404
Jun 200336648428.565.98$13,349
May 2003049426.595.97$2,951
Apr 2003046126.675.41$2,493
Mar 2003051931.146.10$3,164
Feb 200319140833.487.93$9,628
Jan 2003065030.315.58$3,628
Dec 200219191226.914.85$9,566
Nov 2002039424.664.14$1,630
Oct 200219075026.464.23$8,199
Sep 2002078927.443.64$2,868
Aug 2002072725.963.16$2,300
Jul 200230381324.583.06$9,937
Jun 200219270923.733.34$6,923
May 2002090324.663.58$3,236
Apr 20021811,01523.653.51$7,846
Mar 200218073622.003.10$6,244
Feb 200201,04318.222.38$2,478
Jan 20023741,65317.172.38$10,349
Dec 20013871,85016.932.36$10,926
Nov 20015552,38218.072.41$15,759
Oct 20015522,80019.782.53$17,999
Sep 20017592,89024.262.25$24,920
Aug 20015731,48024.873.05$18,769
Jul 20015551,62023.933.20$18,460
Jun 20017364,40724.563.82$34,929
May 20011,2745,96525.524.31$58,206
Apr 20011,1165,22124.685.34$55,399
Mar 20011,9866,79424.545.38$85,264
Feb 20011,8036,97027.755.77$90,230
Jan 20013,3409,90927.478.40$174,973
Dec 20006,41110,78326.889.12$270,696
Nov 20001,1975,15132.215.66$67,700
Oct 20009,14034,80231.235.15$464,516
Sep 20004,71516,48731.875.19$235,777
Aug 20004,62615,13129.644.54$205,821
Jul 20005,26014,30728.534.09$208,580
Jun 20004,7203,84229.304.40$155,190
May 20005,3287,35127.263.68$172,291
Apr 200015,10612,44624.513.12$409,030
Mar 20005,5637,75828.422.86$180,286

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2012 — as filed, then multipliedworked
Oil                  176 bbl  × $ 98.09 =    $17,264
Casinghead gas         0 Mcf  × $  2.73 =         $0

────────────────────────────────────────────────────
Month total                                  $17,264

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/O/14974 is the state's own key, not one this site invented.